Laserfiche WebLink
<br />NOTICE Of DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" <br />which may be more restrictive than County regulations. The undersigned assumes responsibility for complianCe with any <br />applicable deed restrictions. . <br />UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or <br />,contractors to undertake work, they may be required to be licensed in accordance With state and local regulations. If the <br />contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br />under state law. If the owner or intended contractor are uncertain as to what licensing reqUirements may apply for the <br />intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Section at 727-847- <br />8009. Furthermore, if the owner has hired a contractor or contractors, he Is advised to have the contractor(s) sign <br />portions of the .contractorBlock" of this application for which they will be responsible. If you, as the owner sign as the <br />contractor, that may be an indication that he Is not properly licensed and is not entitled to permitting privileges in Pasco <br />County. <br />TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br />that Transportation Impact' Fees and Recourse Recovery Fees may apply to the construction of new bUildings, change of <br />use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br />90-07, as amended. The undersigned also understands, that such fees, as may be due, will be Identified at the time of <br />permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br />receiving a .certlficate of occupancy" or final power release. If the project does not Involve a certificate of occupancy or <br />final power release, the fees must be paid prior to permit issuance. Furthermore, If Pasco County Water/Seliver Impact <br />fees are due, they must be paid prior to permit Issuance in accordance with applicable Pasco County ordinances. <br />CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): If valuation of work Is $2,500.00 or more, I <br />certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law-Homeowner's <br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant Is someone <br />other than the .owner", I certify that I hav.e obtained a copy of the above described document and promise In good faith to <br />deliver it to'the .owner" prior to commencement. .) <br />CONTRACTOR'S/OWNER'S AFFIDAVIT: '1 certify that all the information In this application Is accurate and that all work <br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application Is . <br />hereby made to obtain a permit to do work and installation as Indicated. I certify that no work or installation has <br />commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating <br />construction, County and City codes, zoning regulations, and land development regulations In the jurisdiction. I also <br />certify that I understand that the regulations of other government agencies may apply to the Intended work, and that it is <br />my responsibility to identify what actions I must take to be In compliance. Such agencies include but are not limited to: <br />Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br />Lands, Water/Wastewater Treatment. <br />Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering <br />Watercourses. <br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. <br />Department of Health & Rehabilitative Servlces/Environmental Health Unit-Wells, Wastewater Treatment, <br />Septic Tanks. <br />US Environmental Protection Agency-Asbestos abatement. <br />Federal Aviation Authority-Runways. <br />I understand that the following restrictions apply to the use of fill: <br />. _ Use of fill is not allowed In Flood Zone .V" unless expressly permitted. <br />. If the fill materia" Is' to be used in Flood Zone "A", It is understood that a drainage plan addressing a <br />.compensating volume" will be submitted at time of permitting which is prepared by a professional engineer <br />licensed by the State of Florida. .' . . <br />If the fill material Is to be used In Flood Zone "A" in connection with a permitted building uSing stem wall <br />construction, I certify that fill will be used only to fill the area within the stem ",,:all. '. <br />If fill material Is to. be used In any area, I certify that use of such fill Will not adversely. affect a?Jacent <br />. properties. If use of fill Is found to adversely affect adjacent propertl~s, the owner may be Cited for Violating <br />the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br />acre which are elevated by fill, an engineered drainage plan Is required. . , . . . <br />If I am the AGENT FOR THE OWNE~, I promise In good faith to inform the owner ~f the permitting conditions set forth In <br />this affidavit prior to commencing construction. I understand that a separate per~lt may be.requlr~d for electrlca.l work, <br />plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically In?luded In the application. A <br />ermlt issued shall be construed to be a license to proceed with the work and not as authorJo/ !o violat~, cancel, alter, or <br />~et aside any provisions of the technical codes, nor shall issuance of a permit prevent the B~lIdlng OffiCIal from the~e,after <br />requiring a correction of errors In plans, construction or violations of any codes. Every permit Issued shall become Invalid <br />unless the work authorized by such permit Is commenced within six months of permit Issu~nce, or if work authorized. by <br />the ermit'is sus ended or abandoned for a period of six (6) months after the time the work IS commenced: An extension <br />ma: be request:d, in writing, from the Building Official for a period not t~ exceed nin~ty (90) days an3 Will demodstrate <br />. justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the Job Is considere abandone . <br /> <br />o OWNER. YOUR FAILURE TO RECO~D A NOTICE OF COMMENCEMENT MAY,RESULT IN.YOUR <br />~:~:~~CE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT <br />WITH YOUR LENDER OR NATTOR BE ORE EC RDING YOUR TI E 0 C T. <br />FLORIDA JURAT (F.S. 117.03) <br /> <br />CONTRACTOR <br />Subscribed and swom to (or afflnned) before me this <br />by <br />Who is/are personally known to me or has/have produced <br />. as Identification. <br /> <br />OWNER OR AGENT <br />Subscribed and swom to (or afflnned) before me this <br />by <br />Who Is/are personally known to me or has/have produced <br />as Identification. <br /> <br />Notary Public <br /> <br />Notary Public <br /> <br />Commission No. <br /> <br />Commission No. <br /> <br />Name of Notary typed, printed or stamped <br /> <br />Name of Notary typed, printed or stamped <br />