Laserfiche WebLink
<br />Fire Marshal \ <br />Kerry Barnett . <br /> <br /> <br />Zephyrhills Fire Rescue <br />6907 Dairy Road, Zephyrhills, FL 33542 <br /> <br />Bus (813) 780-0041 <br />Fax (813) 780-0044 <br /> <br />Plan Review Comments <br /> <br />I have reviewed the plans for the "Silver Oaks Village Diversified Therapy" located at <br />6215 Abbott Station Drive and my comments have been placed below. Please contact me <br />if there are any questions with regards to my comments. <br /> <br />1. Building shall comply with the applicable codes of the Florida Fire Prevention <br />Code 2003 edition, NFP A 99, and City of Zephyrhills. <br />2. Per NFP A 99 (2005 edition), Chapter 20 "Hyperbaric Facilities" and speaking <br />with Richard Barry, committee member of this part of the code, this facility shall <br />have a sprinkler system in accordance with 20.2.1.2. Plans shall be submitted for <br />this system and permit pulled. <br />3. Panic Hardware will be required on all exiting doors. <br />4. A "Knox" access box shall be required per the Florida Fire Prevention Code. An <br />application has been provided. Location of the access box shall be determined on <br />site. <br />5. Firewall shall be labeled/stenciled "Firewall- Do Not Penetrate" in block style <br />lettering, minimum 2" and located in several areas. <br />6. All penetrations of the firewall shall be UL compliant. Supporting documentation <br />shall be given to the AHY at time of inspection to show the application used to <br />seal the penetration. <br />7. The containment site outside shall have ventilation openings at the base of each <br />wall to allow free circulation of air within the enclosure (Chap. 20 5.1.3.3.3.3). <br />8. Certified fire extinguishers shall be properly located throughout the building in <br />accordance with the code. <br /> <br />Inspections required: <br /> <br />1. Firewall. A screw inspection shall be required prior to the tape and mud process. <br />A final firewall inspect shall be required once wall has been sealed at top and <br />bottom, penetrations have been sealed and wall has been labeled. <br />2. A third party inspection or certification shall be completed on the hyperbaric <br />chamber and all components associated with the chamber that the installation is in <br />accordance to the code. This also includes the containment structure. This <br />inspection or certification shall be forwarded to the Fire Marshal and Building <br />Official. <br />3. A building final shall be conducted. <br /> <br />