Laserfiche WebLink
<br />, .._......, .s"~"-1C-~. <br /> <br />VERlZON FLQRIDA, INC. <br />GENERAL RIGHT Of' WAY PERMIT <br /> <br />EXHIBIT "S" . <br /> <br />A GENERAl.. RIGHT OF WAY PERMIT (G~) -Is given for certain routine repetitive work not <br />requiring a speqtic pennlt defined on Exhibit "A" that Is 5 feet or greater from back of curb <br />(BOC) or edge of pavement (EP). <br /> <br />No roadway will ba open cut or directional dnlled with this pennlt. <br /> <br />Upon completion of work the. Pasco County Inspector shall be noUfied for a final Inspection of <br />the project " <br /> <br />Best Management Practices (BMP) will be ~servOO at all times. <br /> <br />,../ <br /> <br />Notify Sunshine State One Call of ROOda at 1-800-432-4nO not less than 48 hours or more <br />than 5 days prior to construction, and all other I~qlilrements of Rorida Statute 556 will ~ <br />obselVed at all times. <br /> <br />MAINTENANCE OF TRAFFIC <br /> <br />- All activities in accordance with this agreement will require conformance to the "Manual of <br />Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and <br />Utility Operations." (Chapter 316, Rorida Statutes) <br /> <br />- Pedestrian, blcyc/e and hanoscap traffic must be safely maintained and must not be <br />redirected Into the roadway or Into ditches. Use of sidewalks may not be Impaired or <br />closed for greater than 60 minutes. When a sidewalk Is to be removed means of <br />rerouting pedestrians, bicyclists and handicapped people must be constructed prior to <br />sidewalk removal per Rorida Department of Transpottatian (FOOT), Manual on <br />Uniform Traffic ContrOl Revises MUTCD and American Disabilities Act (ADA). <br />? <br />- No street shall be closed without the prior written permission of Pasco County Inspector. At <br />least 2 normal woiidng days (Monday. thru Friday) advance notice is fequlred. All <br />. maintenance of traffic plans are to be submitted to the 'Pasco County Inspector for <br />approval prior to commencement of cOnstruction. Appropriate work zone safety Is to <br />be followed at all times. <br /> <br />- All construction activities shatllnclude traffic control through the work zone in accordanCe <br />with FOOT "Roadway and Traffic 1?~lgn Standards" Indexes 600 Series titled "Traffic <br />Control Through Work Zones." <br /> <br />Where it is discovered that a site specific permit will be required, i.e., during excavation existing facili.ties <br />become less than 5 feet froni BOClEP: . <br /> <br />1) The Construction Supervisor will notify the Verizon Engineer that a project cannot be <br />completed under the GRP. <br /> <br />Page 1 of 1 <br />