<br />NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
<br />which may be more restrictive than County regulations. The undefsigned assumes responsibility for compliance with any
<br />applicable deed restrictions.
<br />UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: if the owner has hired a contractor or
<br />contractors to undertake work, they may be required to be licensed in accordance With state and iocal regulations. if the
<br />contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br />under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br />intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Section at 727-847-
<br />8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br />portions of the .contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br />contractor, that may be an indication that he is not properly licensed and Is not entitled to permitting privileges in Pasco
<br />County.
<br />TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br />that Transportation Impact Fees and Recourse Recovery Fees may apply to the constrUctioh of hew buildings, change of
<br />use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance hUmber 89-07 and
<br />90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br />permitting. It is further understood that Transportation Impact Fees and ResoUrce Recovery Fees hlust be paid prior to
<br />receiving a "certificate of occupancy" or final power release, If the project does not involve a certificate of occupancy or
<br />final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br />fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br />CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): if valuation of work is $2,500.00 or more, I
<br />certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien LaW-Homeowner's
<br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br />other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br />deliver it to the "owner" prior to commencement.
<br />CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information In this application is accurate and that all work
<br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br />hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br />commenced prior to issuance of a permit and that all work will be performed to meet standards, of all laws regulating
<br />construction, County and City codes, zoning regulations, and land development regulations In the jurisdiction. I also
<br />certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br />my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br />_ Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally SensitiVe
<br />Lands, Water/Wastewater Treatment.
<br />Southwest Florida Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering
<br />Watercourses.
<br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br />Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, WasteWater Treatment;
<br />Septic Tanks.
<br />US Envirorimental Protection Agency-Asbestos abatement.
<br />Federal Aviation Authority-Runways.
<br />I understand that the following restrictions apply tei the use of fill:
<br />Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
<br />If the fill material Is to be used in Flood Zone "N, it is understood that a drainage plan addressing a
<br />"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br />licensed by the State of Florida. '
<br />If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br />construction, I certify that fill will be used only to fill the area within the stem Wall. ,
<br />If fill material is to be used in any area, I certify that use of such fill will hot adversely affect adjacent
<br />properties. If use of fill is found to adversely affect adjacent properti~s, the.ow.ner may be cited for violating
<br />the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br />acre which are elevated by fill, an engineered drainage plan is required. " . . . . '.
<br />If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner ~f the permlttln~ cond~tlons s~t forth In
<br />this affidavit prior to commencing construction. I understand ~hat a s,eparate perm~t. may ?e reqUlr~d for, elect~lca~ ~or~,
<br />plumbing, signs, wells, pools, air conditioning, gas; or other !nstallatlons not speCIfically In~luded.1n the application. A
<br />permit issued shall be construed to be a license to proce?d With the work a~dnot as authon~y ~o vlol~t~, cancel, alter, or
<br />set aside any provisions of the technical codes, nor shall Issuance of a permit prevent the B~II.dlng OffiCial from the~eaft~r
<br />requiring a correction of errors in plans, construction Of vioJat!o~s o! any codes., Every ~ermlt Issued. shall become. Invall~
<br />unless the work authorized by such permit Is commenced Within SIX months o.f permltlssu~nce, or If work authorized. by
<br />the permit is suspended or abandoned for a period of six (6) months after the time th~ work IS commenced: An extensIon
<br />may be requested, in writing, from the Building Official for a period not t~ exceed n1n~ty ~90) da~s and Will demonstrate
<br />justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the Job IS conSIdered abandoned.
<br />
<br />WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br />PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCiNG, CONSULT
<br />WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br />FLORIDA JURAT (F.S. 117.03) ~ \b.~
<br />
<br />OWNER OR AGENT ' CONTRACTOR~ - ~
<br />Subscribed and sworn to (or affirmed) before me this Subscribed and swom-tQ (or affifilT1ed) before me this
<br />~ 1 by ~ce__~"'- UrrJb
<br />by II k t me or haslhave produced WhOli-,s1~c-re~e~rsonaIlY known to me or haSa/hsaldveenPtirfiocadutiC.'oedn.
<br />Who islare persona Y nown 0 ' ,
<br />as identification.
<br />
<br />Notary Public
<br />
<br />,;:?\;:~~. JACQUELINE BOGES
<br />';' ,A :;; ('A)~"1issigA DO 621833
<br />',:,:.,...~!?l expires December 12 2010
<br />Commission No. "Rftl~~"" BoodedThruTmvJ:AmlqlU'.II00~'U19
<br />
<br />Notary Public
<br />
<br />Commission No.
<br />
<br />Name of Notary typed, printed or stamped
<br />
<br />Name of Notary typed, printed or stamped
<br />
|