Laserfiche WebLink
<br />NOllCE OF DEED RESTRIC110NS: The undersigned understands that this permit may be subjed to "deed" restrictions" <br />which may be more restrictive than County regulations, The undersigned assumes responsibility for oompliance with any <br />applicable deed restrictions. <br />UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILmES: If the owner has hired a contractor or <br />oontractors to undertake work, they may be required to be licensed in accordanca with state and local regulations. If the <br />contrector is not licen$ed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br />under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br />intended work, they are advised to contact the Pasco County Building Inspection Division-licensing Section at 727-647- <br />8009. Furthermore, If the owner has hired a contractor or contraelDrs, he is advised to have the contraelDr(s) sign <br />portions of the .contractor BIoek" of this appllc:ation for which they wiN be responsible. If you, as the owner sign as the <br />contractor, that may be an indication that he is not properly licensed and is not entitled to permitting pnvlleges in Pasco <br />County. <br />TRANSPORTA110N IMPACTlUl1LITlES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br />that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of <br />use in existing buildings, or expanSion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br />90-07. as amended, The undersigned also understands. that such fees, as may be due, win be identified at the time of <br />pennitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br />receiving a .certlficate of occupancy" or final power release. If the project does not involve a certificate of occupancy or <br />final power release, the fees must be paid prior to permit issuance. Furthermore. If Pasco County Water/Sewer Impact <br />fees are due, they must be paid prior to permit issuance in accordance with applieable Pasco County ordinances. <br />CONSTRUC110N LIEN LAW (Cllapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I <br />certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law-Homeowner's <br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the appllc:ant is someone <br />other than the 'owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br />deliver It to the .owner" prior to commencement. <br />CONTRACTOR'SJOWNER'S AFFIDAVIT: I certify that all the information in this appllc:ation is accurate and that ali work <br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is <br />hereby made to obtain a permit to do work and Installation as indicated. I certify that no work or installation has <br />commenced prior to issuance of a permit and that aU work will be performed to meet standards of all laws regulating <br />construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also <br />certify that I understand that the regulations of other govemment agencies may apply to the Intended work. and that it is <br />my responsibility to identify what actions I must take to be In compliance. Such agencies Include but are not limited to: <br />Department of Environmental Protedion-Cypress Beyheads, Wetland Areas and Environmentally Sensitive <br />Lands, WaterlWastewater Treatment. <br />Southwest Florida Water Management District-Wells. Cypress Beyheads, Wetland Areas, Altering <br />Watercourses. <br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. <br />Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment. <br />Septic Tanks. <br />US Environmental Protection Agency-Asbestos abatement. <br />Federal Aviation Authority-Runways. <br />I understand that the following restrictions apply to the use of fill: <br />Use of fill is not allowed in Flood Zone "V' unless expressly parmitted. <br />If the fiU material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a <br />.compensating volume" will be submmed at time of permitting which Is prepared by a professional engineer <br />licensed by the State of Florida. <br />If the fill material is to be used in Flood Zone "A" in connection with a permmed building using stem wall <br />construction. I certify that fill will be used only to fill the area within the stem wall. <br />If fiU matarial Is to be used in any area, I certify that use of such fiI wi. not adversely affect adjacent <br />properties. If use of fill is found to adversely affect edjacent properties, the owner may be cited for violating <br />the conditions of the building permit issued under the attached permit application, for lots less than one (1) <br />acre which are elevated by fill, an engineered drainage plan is required. <br />If I am the AGENT FOR THE OWNER, I promise in good faith to Inform the owner of the permitting conditions set forth in <br />this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br />plumbing, signs, wells. pools, air conditioning, gas, or other installations not specifically included in the application. A <br />permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter. or <br />set aside any provisions of the technical codes. nor shall issuance of a permit prevent the Building OffICial from thereafter <br />reqUiring a correction of errors in plans, construction or violations of any codes. Every pennit isSUed shall become invalid <br />unless the work authorized by such permit is commenced within six months of parmit isSuance, or if work authorized by <br />the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension <br />may be requested, in writing, from the BuHcJing Official for a period not to exceed ninety (90) days and will demonstrate <br />justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. <br /> <br /> <br />ClMf 1 rJu --4P1hNolarfPU~C <br /> <br />Convnialion No. <br /> <br />~: rill J4ir":to <br /> <br />Nolarf Public <br /> <br />Name of Nolarf typed, printed or stamped <br /> <br />Name of Nolarf typed, printed or stamped <br /> <br />~~yp".$,. ANGELLEEGRIFFlTH <br />~ MY COMMISSION II DD~19 <br />." ". <br />"+Off'.,-.t EXPIRES: Sept. 26,2010 <br />(.07) 3tl8'()153 FIorkIa ~ SelYice.com <br /> <br />~~y,~ ANGELLEEGRIFFlTH <br />PM MY COMMISSION # DD~99419 <br />."..... .' <br />"'~Off'.,-.t EXPIRES: Sept. 26,2010 <br />(.071 398-()153 Florida ~ SeMce.com <br />