My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6400
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:36:42 PM
Creation date
6/22/2007 10:41:18 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6400
Building Department - Name
TROUT,BARBARA
Address
3539 PERIDOT LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Procedure for Lot Improvement Requests <br />(Please refer to "Rules and Regulations'? <br /> <br />III !IN@W~@ <br /> <br />1. All requests are to go to Chairman of the Property Evaluation Committee, for the committee <br />to review. There is a holder labeled "ProDertv EvallUltion & l"""ovements" in the librarv <br />for Lot owners to olace their comoleted forms in and these forms wiD be nicked uo from <br />the Librarv bv the Prooertv Evaluation committee. <br /> <br />2. Any request which is NOT filled out properly or in detail, which includes, complete plan <br />layout, elevations (where applicable), written details of improvement being requested, including <br />color, etc, and any other information pertinent to the processing of the request, wiD be returned <br />to the Lot owner for comoletion before beine: reviewed by the Committee. <br /> <br />3. Committee will review requests and visit the site of the request as necessary. <br /> <br />4. After the Committee has approved or denied the request, it will be presented to the Board of <br />Directors for their approval or denial. <br /> <br />5. There will be NO more one day approvals or last minute approvals. Request will take 7 - 14 <br />days for appropriate review and consideration, thus giving the Committee and Board members <br />time to review and consider the request in a thorough manner. <br /> <br />6. The original request will be stamped approved or denied, and after being copied the original <br />will go into to the members file and the copy returned to the Lot owner by the Board of Director <br />liaison to the committee. <br /> <br />7. The committee will follow up on requests to determine that the request as presented and <br />approved is being adhered to. <br /> <br />As the owner of Lot # :;),3 7 , I understand the Property Evaluation Committee and/or the <br />Board of Directors will enter the property to follow the external progress of the construction or <br />improvement, as submitted on the Lot Improvement Request. <br />/} - <br />~CU_l(U tL ueulL <br />Lot Owner's Signature <br /> <br />/-/.;)-{) 7 <br />Date <br /> <br />4/03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.