Laserfiche WebLink
<br />BIAN4CO CONSTRUCTION <br />PROPOSAL/CONTRACT <br />FEBRUARY 5,2007 <br /> <br />Between Marcus Price <br />Goin' Postal <br />4941 4th St. <br />Zephyrhills, Fl 33542 <br />813-782-1500 <br />813-782-1599 (fax) <br /> <br />And the Contractor: BIANCO CONSTRUCTION <br />CBC060201 <br />15147 MYRTLE ST <br />DADE CITY, FL 33523 <br />352-567-9029 <br /> <br />For the Project: <br /> <br />Exterior Door Installation <br /> <br />Contractor proposes to furnish all labor as listed below for the a ove mentlOne rO.lect. <br />DESCRIBE WORK, MATERIALS OR LABOR AMOUNT <br />Install Double French Exterior Doors With Lock Set and Full Light Panel < <- " <br />Blinds In Glass (Tilt, Lower, & Raise) t y-, <br />Install Door Casing: Interior & Exterior 1.''' <br />Includes Paint (2 Coats) Color Of Choice <br />Cost of Door $1105.24 <br />Labor and Materials $4405.24 <br />Price Includes, Drawings And Permits <br /> <br />b <br /> <br />dP . <br /> <br />This prop'osal shall be valid for 20 days. <br /> <br />This price does not reflect any hidden structural defects, termite damage, wood rot, or other <br />defective components of the existing house which may need to be repaired or replaced in order to <br />properly complete the above-quoted work, and further acknowledge that the expense, if any, will <br />be the responsibility of the property owner. <br /> <br />A Chane:(l Order is any change to the original plans and/or specifications. All change orders <br />need to be: agreed upon in writing, including cost, additional time considerations, approximate <br />dates when the work will begin and be completed, a legal description of the location where the <br />work will be done and signed by both parties. NO extra work will be started or special order <br />items ordt~red until the extra work/change order sheet has been signed by all parties, contractor, <br />owner and subcontractor (If applicable) and payment in full for the additional work to be done or <br />special order item(s) ordered. <br />PAYMENTSCHEDULE <br />VI Before Commencement Of Project...................$2202.62 <br />Remaininl~ Balance at Completion Of Project........$2202.62 <br /> <br />Peter Bianco Construction, Inc, The Contractor shall promptly pay all sums owed to <br />laborers, subcontractors, and material-men who supply labor and/or materials for the work <br />and shall indemnity, hold harmless, and defend the owner and the property on which the <br />work is located from mechanic's and material-men's liens. The contractor will furnish a <br />final lien waiver within ten days after final payment received. <br />RESPECTFF)SUBMI~ - <br /> <br />Signature '>--:: ~ct,-_ ~~...~ dba, Peter Bianco Construction, Inc. <br /> <br />Date: :2 - 7. L) - c.l) <br />ACCEPTANCE OF PROPOSAL AND CONTRACT <br />THE ABOVE PRICES, SPECIFICATIONS, TERMS, AND CONDITIONS ARE <br />SA TIF ACTORY AND ARE HEREBY A CEPTED. PETER BIANCO CONSTRUCTION, <br />INC. IS l-JlEREBY AUTRHQRlZEUTO PE RM THE WORK AS SPECIFIED. PAYMENT <br />SHALL BE MADE AS.OUTUNED ABOVE. WE FURTHER ACKNOWLEDGE THAT WE <br />HAVE RIECEIVED,AND REVIEWED THE LLOWING NOTICES: <br />BUYER'S RIGHT TO C '0 THE OWNER/Ll WS <br />Accepted byL' <br /> <br />- <br />owner Sil~nature <br /> <br /> <br /> <br />Date <br /> <br />Owner Sil~nature <br /> <br />Date <br /> <br />"""~ <br />}.. .: ~.,... .{';Y. <br />,:,:, .. ':",!-' '.... .~'... .;,- .,./': <br />