Laserfiche WebLink
<br /> <br />FOR DETAIL OF TANK SLAB <br />SEE SHEET 'POB' <br /> <br />z x <br />:i ~ <br /> <br />e ~ <br />o 0 <br />I I <br />I"')~ <br /> <br /> <br />..-.--- <br /> <br />o <br />o <br /> <br />III <br />" <br />II <br />II <br /> <br />L~ <br /> <br />e <br />o <br />I <br />OJ <br /> <br />ANGLE OF SOIL <br />REPOSE ON ALL <br />SIDES 1 1 W/ DEPlli <br /> <br /> <br />1 3 EXCAVATION AND BACKFILL <br /> <br />A EXCAVA110N If unexpected water condition or rock (s encountered, Immediately contact the <br />Owner for Instructions before proceeding with the excavation <br />B TANK HOLE SIZE IN STABLE SOIL Size excavalJon perimeter to allow 24" minimum between ~oJnks <br />and 24" minimum between tank sides and end cops and the wall of the tank hole <br />C TANK HOLE SIZE IN UNSTABLE SOIL <br />1 Unstable soli Is defined as havIng less than 750 Ibs /sq ft cohesIon, as calculated frClrn an <br />unconfined compression test, or soils wilh on ultImate bearIng copaclty of less than 3,500 <br />Ibs /sq ft Loose sand, muck, bog, peat, swamp or landfill where SOil IS soft are generally <br />conSidered unstable SOils <br />2 S,ze excavation perimeter to allow 24" minimum between tanks and a minimum of quarter the tonk <br />diameter between the tonk Sides/end caps and the wall of lhe tonk hole <br />3 Filter fabriC 1'1111 be used to line the STP sump where pea gravel IS utilized <br />4 Permanent shOring may be used to stabilize the walls of the tank hole, at the discretion of the <br />Contractor If permanent shOring IS used, fol/ow Stobie SOil" size crItena <br />Refer to "Alternate Backfill Materials., below <br />D DEPlli OF TANK HOLE <br />1 Contractor IS responSible for esloblishlng the lonk hole depth, consldenng the lenglh of piping <br />runs, to the pump blocks and vent risers, pipe burial depth, yard slope and the following crIteria <br />(Measure ot the Remove Pump opening) <br />a Tho mInimum depth of cover Is 3'-0" and the maxImum Is 7'-0" <br /> <br />E SAFETY REQUIREMENT <br />No person sholl enler a lank hole excavation below the 5 ft deep level unless the walls ore shored <br />or Side sloped os prescribed by currenl OSHA regulallons abd the Trench Safety Act of 1986 <br />No exceplions Stale or locol requirements thot ore more reslncllve than Company speclflcallons ore to <br />be adhered to os though speclf1ced In Company specifications The Contractor Is responslbte for any <br />design, materfols, equIpment, permits, ete, for shoring or side sloplng a hole <br />F flLL AND BACKFlLL <br />All fil/ ma terral shall be of setect sand granular nature, free from vegetatIon and extraneous materIal <br />Spread matenal 10 lifts not to exceed 12 Inches and tamp thoroughly Contractor shall prOVide a <br />compactlon test for certlflcatlon of fill at the Owner's expense Compaction sholl be at least 90% of <br />the Modified Proctor density <br /> <br />1 4 BALLAST <br /> <br />A MATERIALS <br />Clean water Is to be used os 0 ballasl under all condltlons where ballast Is requIred <br />B DRY HOLE CONDITION <br />Tonks With backfill to top of tanks, must be ballasted If there Is any chance that surfare or <br />subsu~face water Will enter the tank hole lo a depth of 36" or greater above the bottom of the <br />lanks <br /> <br />C <br /> <br />\VET HOLE CONDITION , <br />Attempt to pump woler from lhe tank hole to malnloln a "Dry Hate Condlbon If unable to oblatn <br />a "Dry Hole Condlllon", Owner IS to be notified and Will delermlOe the course of action to be <br />followed Install filter fabriC, be-down "logs" and bedding os speclfTed elsewhere Set tonk In hole. <br />partially fill wllh water untn It sInks firmly on the bed Use only enough woler to bal/ast tank until <br />backfill Is to top of tonk After backfill to top of tank, fill tonk With water until completion of <br />Installatlon <br />CAUTION - BALLAST LEVEL MUST NEVER EXCEED WATER OR BACKfiLL LEVEL IN mE HOLE <br />DURING INSTALLATION Do not remove ballasl until tank slab has been poured Do not set remole <br />pump motor until ballast water hog been removed from tonk <br /> <br />DOUBLE WALL GLASTEEL / FRP TANK INSTALLATION <br /> <br />MATERIALS <br />1 Double-wall Glosteel, fiberglass reIn forced plastte (FRP) coated steel storage tanks as supplied by <br />Manufacturer are to be Installed by Contrector In eccordance WIth the plans and speCifications <br />as supplled by manufacturer <br /> <br />1 5 <br />A <br /> <br />Double Wall (Modern / Permo Tonk) <br /> <br />2 Other Contractor supplied equipment Included vapor recovery (when speCIfied) Phase I <br />Assemblies Adopters, dust cops and nameplate holders Phose II EqUipment Anti-ReCirculation <br />valve, high hose retractor, nozzle SWivels, flow limiter, anb-klnk spnngs, SWivel stops, clamps, <br />extension <br /> <br />a. <br />~ <br />:;::) <br />a. <br /> <br />1 6 <br />A <br /> <br />1 7 <br />A <br /> <br /> <br />( ~'\ ~ <br /> <br />...J <br />~~ <br />wO <br />....JI- <br />~2 <br />zO <br /><(:::i <br />I- <br /> <br />cr <br />o <br />a. <br />~ <br />.:; <br />l- <br />Z <br />~ <br /> <br />::l <br />G: <br /> <br />....J <br />~O;: <br />~~ <br />2 <br />~O <br />~:E <br />I- <br /> <br />11. <br />:E <br />::J <br />11. <br /> <br />...-..- ~ <br /> <br /> <br />I <br />I <br />I <br />116,000 Gall <br /> <br />. <br /> <br />I <br />I <br /> <br />II I' <br />I' I ! /"4" ALUMINUM <br />I i' FILL ruBE <br />I II <br />I " <br />I II <br /> <br />I II HOLD DOWN STRAP/S_____ <br />I '11W~~Xl:^~) ') · <br /> <br />i ( ~'\ ] <br /> <br />BULKHEAD <br /> <br />SEE DET A <br /> <br /> <br />SEE DET 8 <br /> <br />42' 6" <br /> <br />TANK SPECIFICATIONS <br /> <br />B <br /> <br />HANDLING OF TANKS <br /> <br />RESPONSIBILITY The Contractor Is responSible for olf-loodlng the tonks from the dell'..ery vehicle <br />A crane or backhoe of sufficient lifting capacity must be used <br /> <br />LIFTING & MO\l1NG 'M1en lifting or mov1Og a tank, always use properly Sized equipment ond <br />lift by lifting lug(s) On large tanks, greater lhan S' diameter, use 0 spreader ba,r to ensure a lift angle <br />of at least 4-5 at each liftIng lug Never roll or usa cables or chains around a tank Set on <br />smooth ground, free of rocks and foreIgn objects <br />EXCEPTION - Tank can be rolled up to 90 on a smooth clean surroce <br /> <br />CHOCKING Tonks are to be chocked In accordance wIth manufacturer's recommendation until <br />ready for Installation If Windy conditions eXist or oro expected, anchor tanks uSing rl1lnlmUm 1/2u <br />nylon or hemp rope over each tonk and secura to stakes af adequate slza to prevent movement of <br />the tanks <br />OPENINGS All tanks ore shipped With dusl covers or steel plugs In each opening Dust covers ore to <br />remain In each opening unlil ready for the pre-Installation pressure test All tanks must have either a <br />dust cop or steel plugs In place or a 5 pSI pressure relief valve In place at 011 ttmes <br />DAMAGE <br />1 Inspect all tonks carefully for signs of domage upon receipt Note any damage on the shipping <br />documents and notify the Owner Can tact the tank manufacturer for addlt!onal <br />In formolion <br />2 If the tank la damaged at any other time, do not ottempt repairs Notify the Owner who will <br />become aware of lhe course of aellan <br />SETTING Set tanks on prepared bed with a slope downward toward the fill end oif the tank A slope <br />of 2 difference between the two extreme openings of the tonk IS deSired The acceptable range of <br />slope IS 4 maxImum and 1 W minimum, WIth the fill end lower lhan remote pump end of lhe tonk <br />Tonks that exceed the acceplable slope or that slope downward to the remote pump end are <br />Improperly set and will be reset <br />INST ALLA nON WITH APPROVED MATERIALS <br />1 Place 0 12" lift of backfill evenly around the tanks Push backfill completely underliealh and oround <br />lhe tonk Procedure con be done from bonk or adJocenl tonk top <br />If 0 man will be In the hole to "work" the backfill, hole must be shored or s Ide sloped os <br />prescribed by currenl OSHA regulotlons <br />2 Place second 12u Ii ft or backfill evenly around the lanks Again repeat lhe "v:/orklng" or backfill <br />around and under the tanks Add backfill evenly around the tanks up lo th~ tops <br />of the tanks <br />3 Backfill to subgrade after PlPtn9 and tesbng IS completed <br />INSTALLATION WIn; ALTERNATE MATERIALS All alternale materials must receIve wrItten approval from <br />the tonk manu facturer <br /> <br />c <br /> <br />D <br /> <br />E <br /> <br />F <br /> <br />G <br /> <br />H <br /> <br />B <br />C <br /> <br />TANK TESTING <br /> <br />PRE-INSTALLA110N TEST SET UP Prior to the pr~-tnStallalton test, 011 shlppln9 pads musl be <br />removed from the tank and the vacuum on the annular space must be releasedl <br />A vacuum on the annuler space 19 substitute for the pre-lnstallot!on test All Installatlon tests <br />must be performed and recorded on acceptable forms <br />NOTIFICA nON <br />The Owner, MUST observe all tests Notify at leost 24 hours In advance of any tests <br />PRESSURE APPUCA TION SYSTEM <br />The pressure applicalton syslem IS lo hove two pressure gouges (range 0 ta 10 pSI WIth 5 pSI <br />pressure reliefs) In the system. both In good condltlon and haVing been tested <lnd calibrated within <br />a three-monlh period prior to lhe tonk test (copy of the test and calibralton data to be furnished to <br />the Owner upon request) <br />USE EXTREME CARE AROUND AND NEAR THE PRESSURIZED TANK Relieve lhe pressure prior to <br />movIng lhe tank or removing any fittings <br />Never pressurize the secondary (outer) tonk without pressurizIng the prImary (Inner) lank ffrst <br />LEAKING TANKS <br />DO NOT Install 0 tonk which shows any evldence of a leak The Owner Is to be notified of any <br />damage and will become aware of the course of action to be followed <br />SCOPE OF WORK <br />The Contractor IS responSible for all lobor material and equipment necessary tOI conduct the <br />following tesls <br />Pre-Installallon Pressure Test, AIr <br />After-Instol/atton Pressure Test, Air or Hydrostatic <br /> <br />PRE-INSTALLA TION PRESSURE TEST, AIR Extreme core Is to be used around and near the <br />preSSUrIZed tonk Never pressunze the secondary (outer) tank Without pressurIZing lhe primary <br />(tnner) tank <br />1 Pnmary (Inner) Tonk Tesl <br />TIghten 011 tonk fittIngs Locate a pressure gauge In the vent/monllor fitting tn the secondary <br />(outer) tank Locale a second pressure gage at a fItting In tho manway and COMecl lhe air <br />pressure hose to thiS same fit ling PressurIZe the primary (Inner) tonk to 0 minimum 4 psi. <br />maximum 5 pSI Monitor the pressure gages 0 minimum of 1/2 hour There should be no pressure <br />Increase [n the secondary (outer) tank Soap 011 tonk fittings <br /> <br />D <br /> <br />E <br /> <br />F <br /> <br />PUMP INTAKE <br /> <br />----. <br /> <br /> <br />~'~xr <br /> <br />----, <br />, <br /> <br />~ <br /> <br />. \ \-\ <br />.J IIJ <br />~ I ~ 'i <br /> <br />UFT LUG7-- <br />(TYPICAL) <br />..( <br /> <br />II I <br />II <br />II <br /> <br />110,000 Gal <br /> <br />~\'~ll' <br />I J1hl 0- ~U' <br />l~ rl-~; .tn7lYJ~f- ~~ <br />~ I rrf~~'l' <br />2'-0" <br />MIN <br /> <br />G POST..INSTALLAllON PRESSU"E TEST AIR <br />1 Primary (Inn or) Tonk Test Perform lhls test wilh all tank rIsers and f1tt1ngs attached TIghten all <br />tank fittings Locota a pressure gauge In one of the annular space monitor fitllngs In the <br />secondary (outer) lank Locate a second pressure gauge with 0 5 psi pressure rehef, to ona of <br />the pnrnary ~Inncr) lank llllln<;s and connect the air pressure hose to lhls some fitting Pressurrze <br />the prlll1ary \Inner) tonk to 0 mlntrDUm of 4 pSI (maXlIl1Um 5 pSI) Soap 011 tonk fittings and <br />mOl1ltor the pressure gauge for 0 minimum of 1/2 hour There should be no pressure IOcreasa In <br />lhe secondary (outer) tank <br /> <br />H POST-INSTALLATION PRESSURE lEST, HYDROSTATIC No tank that shows any eVidence of a teak <br />IS to be kept IC'\ lhe syslem Any damage Incurred to lhe tonk dunng the installation Will be contractor's <br />responsibility The Owner Is to be notified of any damage and Will be made aware of the <br />course of actton to be followed <br />If a hydrostatic lasl Is requlrod by a local agency, lhe contractor 19 to Isolote the tank for testrng and <br />reconnect when tesltn\l IS complete <br />BALLASTING Only the primary (Inner) tonk shalt be used when ballastrng the tonk Never fill the <br />secondary (outer) lank WIth a nUld If the tanks ore ballasted, conduct HydrostatIc Test (Instead of <br />the post-Installation air test) on the tonk and fittings <br />J BURIAL DEPTH The bunol deplh from the top of the tank to ground level shall be 0 minimum of ;3 <br />feet and a maximum of 7 feol The fittings, If a man way f9 used, will be approximately 5 to 6 Inches <br />off lhe top of lhe tank ThiS shall be conSidered for lhe slope of the piping and thus may affect the <br />tonk bUrial depth <br />K VENTING Vent the primary tank only 03 reqUIred by tank manufacturer <br />L INTERSnTIAL MONITOR Install mOnltonng gouge Within nser prOVIded by tank manufacturer <br /> <br />M INSTALLING THE CONTAINMENT SUMP The contaInment sump must be waterllght to prevent <br />liqUid tngress or egress Fiberglass InSide and outSide of tank collar <br />N INSTALLING THE SPILL CONTAINMENT FILLBOX The spill containment fillbox must be liqUid tight <br />Test 01/ flllboxes by filling wllh water for a mlnlmum of one hour There should be no drop In the <br />water level dUring thiS test Do not drain waler Into the tank <br /> <br />1 8 APPROVED MATERIALS <br /> <br />A APPROVED 8ACKFILL MATERIALS <br />1 CLEAN SAND Select coarso granular material, ctean and fee of any deleterious matter or debns <br /> <br />2 PEA GRAVEL A clean, naturally rounded aggregate With 0 1/B- mintmum and a 3/4" maximum <br />dlometer Up to 5% of tho particles may p<J53 through a HB sIeve <br />J STONE OR CRAVEL CRUSHINGS Washed matenal With a particle size between 1/B and 1/2" Up <br />to 5% of the particles may pass throu9h a #8 sIeve <br />NOTE Approved materials must be dry, free of Ice ond snow, and meet ASTM C-33, Paragraph 71 <br />for quality and soundness The dry gavel density must be 0 minimum of 95 pounds per cubIc foot <br /> <br />NOTE Bedding materIal, lle-down "logs" and sample wells ara to be placed on the top af the fUter fabnc <br />Excess fobnc at top of the hole should be folded over the backfill matenal at subgrade level <br />B RECOMMlNDED FILTER FABRIC MATERIAL <br />Reemay loc - Twor 3401 or Twar 3341 <br />Phillips Fibers Corp - .Supac 4Np" fabric <br /> <br />REVISIONS BY <br /> <br /> <br />FILL TUBE <br /> <br />t i~ <br />INNER TANK <br />BOTTOM <br /> <br />DETA <br /> <br />----PUMP <br />SHAFT <br /> <br /> <br />INNER TANK <br />BOTTOM <br />DETB d <br /> en <br /> ~ <br /> Z <br /> rJJ <br /> ~ <br /> ~ <br /> ~ <br /> i-J <br /> 1-4 <br /> 0 ~" <br /> Z <br /> g ~ <br /> g <br /> ~ - <br /> (I) <br /> '- <br /> <br />--- <br /> <br />/ <br /> <br />/ <br /> <br /> <br /> O~ <br /> CHECKGD <br /> O~ <br />/J.J~ &'';1 <br />/Jt) BCALS <br />jJO V'iu:/ <br /> .JOB NO <br /> BHeeT <br />'J. b <br />O~ BHEaTS <br />