Laserfiche WebLink
<br /> <br /> <br />A. <br /> <br />ING AND FASTENING THE DOOR <br /> <br />three 3/8" beads of sealant. The first bead should be app'roxlmately 3/4" from the exterior of the rough <br />g, the second 2-1/2" In from the first bead of sealant. Place a third bead of sealant In the groove of the sill <br />rt or 1/4" from the exterior edge of the wood blocking, <br /> <br />R MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS. <br /> <br /> <br />the door from the exterior of the bulldlng. DO NOT slide the bottom of the door <br />e opening. SUding wfll damage the sealant Unes. Place the bottom of the door at the <br />of the opening, then tilt the top Into position. Center the door between the sides of <br />to allow equal clearance for shimming and Insert one roofing nallln the first <br />hole the corner on each end of the top nailing fin, These are used to hold the door <br />ce while shimming it plumb and square, <br /> <br />b and square door. Insert shims. as necessary. between the door and the sides of the <br />opening starting up 6" from the bottom of the door. <br />Note. DO NOT OJ'er sblm. <br /> <br />D, Ch the interior ~. Make sure the measurement from the Interior face of the <br />door 0 the Interior face of the wallis equal at several points around the door. <br /> <br />Note; UIbe dJmemions are not equaJ, chI!cJc to make sure the 6ns are fb1ded <br />out" 90" at all points. <br /> <br /> <br />E, the frame. Insert a I" wide shim behind the <br />ole at the lock strike(s) , Insert a #S x 2-1/2" screw <br />(lncl ed In the hardware box) Into the pilot hole making <br />sure i passes through the shim and Into the rough opening. <br />Note. The weatberstrJp must be pushed adde to rewa} <br />the 'of bole. Be t:arrWJnot to damage the weatber <br />'t<<:t Seri~, 850 Seriet; and Designer Seri~ <br />lode strikes, .ProLint! bas one lode str1Jce. <br /> <br /> <br />the door to opening by driving 2" galvanized roofing nails Into each pre-punched hole In the nailing fin, <br />Note: e sure the On COI7leF is lying as Oat as possible. <br /> <br />oors - Proceed to Step 4. <br /> <br /> <br />Interior <br /> <br />Architect Series and Designer Series <br /> <br /> <br />@ <br /> <br />Series, Designer Series and 850 Series: Apply sealant and Insert a #S x 2" screw (Provided) Into each hole In the bottom of the <br />e (shown above In gold), <br /> <br />H. Archi Series, Designer Series and 850 Series: Position and secure the panel retainer by drilling pilot holes through the remaining holes <br />In the taIner Into the sill support or wood blocking. then apply sealant to the holes and Insert a screw Into each hole as speclfied below, <br />AI wn sUI support: 9/64" pilot holes, #S x 3/4" thread cutting screws (Provided), <br />Wood Iocldng: 1/S" pilot holes, #S x 2-1/2" flat head wood screws (Provided). <br />Maso Boor: #S x 2-1/2" concrete screw. Pilot drlll per screw manufacturer's recommendations, <br /> <br />1. <br /> <br /> <br />the factory instaI1ed screws from the retainer and repeat the process. <br /> <br />]. <br /> <br />Series, Designer Series and 850 Series - Drill a 3/16" clearance hole at each Indentation In the extrusion at the top of the door <br />to the rough opening, stopping when the drlll is through the door frame. Apply sealant to each hole, then Insert a #8 x 3" stainless <br />Into each hole, <br />