My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6433
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:36:29 PM
Creation date
10/30/2007 7:31:33 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6433
Building Department - Name
DEUEL C. FRED & ASSO
Address
5157 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I I <br /> <br /> <br />~~ ~~, 'lne, <br /> <br />License # CCC1325505 <br /> <br />tomer: Paul Gasner <br /> <br />ess: Karate Building ( <br /> <br />~/57 hG\ \\ &\V& 2ePhirkc'\\S ) <br />-- <br /> <br />Pressure wash entire metal pan roof and clean all flashings, apply Hydro-Stop <br />wa er proofing system to entire metal pan roof and flashings. <br /> <br />Install 26 ga. Master Rib metal roof on front portion of building directly over <br />shi gles on mansard roof (Color: Fern Green) <br /> <br />Cut out along edges of flat deck as needed to remove existing drip edge, install <br />ne drip edge along perimeter of flat deck as needed. Grind down all un-even portions of <br />fla deck as needed to help ensure a flat surface. Install new cover board package over <br />ent re flat deck, install tapered system flat deck on the very back side of roof (west side) <br />an install tapered system in scupper area on front portion of roof (east side) to create a <br />sli t pitch and ensure "water run-off'. Install new #43 organic base sheet over cover <br />bo ds, install new white modified torch down system directly over base sheet. <br /> <br />All flat decks will tend to "hold" water. Our scope of work is to help aid in the <br />oval of water by installing a tapered system flat deck in certain areas. Ryman Roofing <br />c not guarantee that the tapered areas will not "hold" any water, but by creating a low <br />slo tapered system, most of the water will run off the roof therefore helping to <br />eli inate the "holding" of water. <br /> <br /> <br />Warranty Info: The hydro-stop water proofing system applied on metal roof will <br />a 1 year labor warranty from the time of application. The torch down system will <br />a 5 year labor warranty from the time of installation. <br /> <br />Total Bid Price: $19,750.00 <br /> <br />Page 1 Of2 <br /> <br /> <br />37325 SR 54 . Zephyrhills, Florida 33542 . Telephone: 813/782-6094 . Fax: 813/783-2645 <br />
The URL can be used to link to this page
Your browser does not support the video tag.