My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6503
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:36:03 PM
Creation date
10/30/2007 9:59:44 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6503
Building Department - Name
PRESTIBINZ,MICHAEL
Address
5842 17TH STREET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />! I <br />Mar,02 07 .1027a <br /> <br />Kursch <br /> <br />8139268401 <br /> <br />pA <br /> <br />Air-O! Force 1 <br />Cooling &Heating <br />Systems <br />PO BOX 789 <br />ODESSA, FL 33556 <br />813-972-9449 <br />FAX 926-8401 <br />airogir133@aol.c:om <br /> <br />......~....... ........ ... ........ ......... ............ ........ ........ <br /> <br />March 2, 2007 <br /> <br />Mike & Cynthia Prestininzi <br />813-782-2482 <br />Re: Mechanical Services / HV AC Change-Out <br />5842 17th 8t I Zephyrhills, FL <br /> <br />We herby propose to furnish the materials and perform the labor necessary for <br />the completion ofHV AC Change-out at the above-mentioned address. <br />Equipment and materials to consist of the following: <br /> <br />A) One- 5 ton high efficiency 13 SEER NOrdyne Heat-pump unit. <br /> <br />B) One- 5 ton bigh efficiency Nordyne Air-Handler. <br /> <br />C) One- Honeyv.'eIl Digital Thermostat. <br /> <br />D) One- Refrigeration line set with cover ifnecessary. <br /> <br />E) One- Pre-cast Hurricane pad with strap kit. <br /> <br />F) One- Relocate wall rdum and add additional return. <br /> <br />G) One- Modification of existing ductwork to accommodate new unit. <br /> <br />H) One- Mechanical Pennit. <br /> <br />Note: Price quoted includes aU materials, supplies, equipment, labor, Freon, <br />taxes, freight and any additonal components necessary for the completion of <br />instaU. <br />Warranty: One year labor, five years on all parts. <br />Tenns: GE RETAIL. <br /> <br />Total lob Cost $4800.00 <br /> <br /> <br />RespectfuIIYSUbmi~~ <br /> <br />Acceptance of Proposal: The above prices, specifications and conditions ace <br />satisfactory and are accepted. Yon are authorized to do the work as specified. <br />Payment will be made as outlined above. <br /> <br /> <br />SignatureC1'*U.A-" 12~ Date ?1P/('.6,. i 2fXJi <br />
The URL can be used to link to this page
Your browser does not support the video tag.