My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6612
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:35:27 PM
Creation date
10/30/2007 11:55:43 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6612
Building Department - Name
ME TWO INC
Address
5246/5248 9TH ST HISTORIC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Compl ting the Installation <br />~ Inspec installed window for any damage caused during remaining construction <br />~ Ensur weep holes or channels are clear of debris and/or sealant for proper water drainage; do not seal weep holes! <br />chann Is <br />The folio ng steps may be performed by others: <br />~ For s eathed wall, before installing exterior wall surface, <br />. A ply exterior trim as desired <br />. A ply drip cap on header exterior trim as follows: <br />. Cut a piece of galvanized drip cap the length ofthe window frame plus 114" to allow for 118" overhang past the <br />ends of the header; apply as follows: <br />. Apply a bead of silicone across the top of the head exterior trim inset 1/4" from the exterior edge <br />. Center drip cap on head exterior trim with 118" overhang past the ends of the trim <br />. Mechanically fasten drip cap with appropriate sized nails pr screws <br />te: Drip cap may or may not come with new window, but can be <br />p rchased at a local hardware store. I <br />. C a piece of self-adhesive flashing 6" wide and 24" longer than the <br />h ader; center over the vertical leg of the drip cap to seal to the wall <br />~ If pri ary building wrap is applied after window installation, be sure it is <br />applie in a shiplap manner <br />~ Instal exterior wall surface within seven days of window installation. if <br />applic ble <br />~ Maint'n gap of 114"-318" between window and final exterior wall surface (siding, <br />stucc , etc.) unless otherwise specified by local building codes orlwall surface <br />manu cturer I <br />. Se I gap on sides with backer rod and polyurethane sealant if painted, or <br />sil cone sealant ifleft exposed (fig. 11) i <br />~ Insul e void between rough opening and window frame with loo~e-fill <br />fiber ass insulation; low/minimal expansion foam sealant may bb used if <br />requi d by local code <br />Appl interior trim as desired <br />Adj window for best operation (if applicable) . <br />Prote t recently installed units from damage from plaster, paint, etc. by covering the units with plastic film <br />If ins ling an alarm system, do not penetrate the sill or side jamb within 3" of the sill; seal all penetrations ofthe <br />wind w frame with an appropriate waterproof sealant <br />. I <br />Finish and Care Instructions I <br />~ All e posed wood surfaces must be painted or clear finished immediately after installation; failure to promptly fmish <br />and aintain the window units may void a future warranty claim! <br />arefully caulk all joints 'I <br />et all nails below wood surface; fill all nail holes . <br />rimed surfaces must be top coated within 21 days of delivery or the surfaces must be reprimed; finish bare wood <br />s aces immediately after installation <br />e sure that all edges of the sash are sealed, but minimize the thickness of the paint or fmish film on the edges of <br />ouble-hung window sashes in contact with the jamb liners <br />o not paint or varnish the weatherstrip or operating hardware <br />e absolutely sure the sashes are completely dry before installing the sashes and/or closing the window <br />~ Seek e advice of a local paint professional for finishing methodS and products you select. The following represents <br />typic I approaches: <br />. staining (recommended only for interior surfaces), <br />Apply stain and let dry <br />Apply a sanding sealer I <br />When dry, sand all wood surfaces with a fine grit (180-220) sandpaper to remove raised grain and provide a <br />smooth surface for the finish coats <br /> <br />shlplapl shiplatY adj <br />the layering method in which each layer overlaps <br />the layer below it so that water runs down the <br />outside and cannot get behind the layers <br /> <br /> <br />Fig. II. Seal gap with backer rod and <br />high quality caulk <br /> <br />~ <br />~ <br />~ <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />JIlOl2 Ins lation Instructions for Primed Wood Windows without Applied Exterior Trim <br /> <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.