Laserfiche WebLink
<br />4/17/2007 <br /> <br />Estimate <br /> <br />I I <br /> <br />4556-P01 <br /> <br />Bathroom continued... <br /> <br />92. Remo~e 1" x 2" lumber (.167 BF per LF) <br />93. Remo\le Baseboard - 3 1/4" <br />94. RemoJe Quarter round - 3/4" <br />95. Remo e Rigid foam insulation board - 1" OR FOIL <br />96. Remo e Window sill - tile on 2" x 6" wall <br />97. - Rapl ce 1/2" drywall- hung, taped, ready for texture <br />98. Textur drywall - light hand texture <br />99. Textur drywall- smooth / skim coat HAVE TO RE SKIM CEILING AT <br />LEAS AND RETEXTURE. \OA <br />100. Electri ian - per hour REWIRE WALLS <br />101. Repfa Baseboard - 31/4" <br />102. Replac Quarter round - 3/4" <br />103. Replac 1" x 2" lumber (.167 BF per LF) <br />104. Replac Rigid foam insulation board - 1" OR FOIL <br />105. Paint b seboard - two coats <br />106. Paint d or/window trim & jamb - 2 coats (per side) <br />107. Paint b se shoe or quarter round - 1 coat <br />108. Seal th n paint the walls and ceiling (2 coats) <br />109. Replac Window sill- tile on 2" x 6" wall <br />110. Detach & Reset Window blind - horizontal or vertical DONT DAMAGE <br /> <br />Living Room <br /> <br />Task <br /> <br />~~'PAUL DAVIS <br />RESTORATION <br /> <br />15 LF <br />17.33 LF <br />17.33 LF <br />30 SF <br />3 LF <br />28.75 SF <br />148.53 SF <br />18.53 SF <br />1 HR <br />17.33 LF <br />17.33 LF <br />15 LF <br />30 SF <br />17.33 LF <br />1 EA <br />17.33 LF <br />148.53 SF <br />3 LF <br />1 EA <br /> <br />Quantity Unit <br />86 SF <br />2 EA <br />45 LF <br />21.71 LF <br />17 LF <br />21.71 LF <br />86 SF <br />4 LF <br />86 SF <br />470.18 SF <br />160.56 SF <br />2 EA <br />2 HR <br />21.71 LF <br />17 LF <br />21.71 LF <br />45 LF <br />86 SF <br />43.42 LF <br />1 EA <br />160.56 SF <br />43.42 LF <br />470.18 SF <br />4 LF <br /> License CBC051266 <br /> 888-PDR-FIRE <br /> <br />111. - Remo e 1/2" drywall- hung, taped, ready for texture <br />112. Remov 110 volt copper wiring run, box and outlet <br />113. Remov 1" x 2" lumber (.167 BF per LF) <br />114. Remov Baseboard - 3 1/4" <br />115. Remev Casing - 2 1/4" <br />116. Remev Quarter round - 3/4" <br />117. Remov Rigid foam insulation board - 1" OR FOI L <br />118. Remev Window sill - tile on 2" x 6" wall <br />119. - Repla e 1/2" drywall - hung, taped, ready for texture <br />120. Texture drywall- light hand texture <br />121. Texture drywall- smooth / skim coat HAVE TO RE SKIM CEILING AT <br />LEAST NO RETEXTURE. \OA <br />122. Replac 110 volt copper wiring run, box and outlet <br />123. Electric an - per hour REWIRE WALLS <br />124. Replac Baseboard - 3 1/4" <br />125. Replac Casing - 21/4" <br />126. Replac Quarter round - 3/4" <br />127. Replac 1" x 2" lumber (.167 BF per LF) <br />128. Replac Rigid foam insulation board - 1" OR FOIL <br />129. Paint b seboard - two coats <br />130. Paint d or/window trim & jamb - 2 coats (per side) <br />131. Floor pr tection - self-adhesive plastic film <br />132. Paint b se shoe or quarter round - 1 coat <br />133. Seal th n paint the walls and ceiling (2 coats) <br />134. Replac Window sill - tile on 2" x 6" wall <br /> <br />Paul Davis Resto ion, Inc. of Pasco and Hernando FI. <br />7944 RutiJio Court, ew Port Richey, FI. 34653 <br /> <br />4 <br />