My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6711
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:34:55 PM
Creation date
1/4/2008 8:48:12 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6711
Building Department - Name
FAITH BAPTIST CHURCH
Address
38634 CR54 EAST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ZephyrhilIs Fire Rescue <br />6907 Dairy Road, Zephyrhills, FL 33542 <br /> <br />Fire Marshal <br />Kerry Barnett <br /> <br />Bus (813) 780-0041 <br />Fax (813) 780-0044 <br /> <br />May 15,2007 <br /> <br />Plan Review Comments <br /> <br />I have reviewed and approved the plans for a commercial hood and suppression system <br />located at 38634 CR54E under the following conditions. My comments have been <br />placed below. Please contact me if you have any questions with regards to my <br />comments. <br /> <br />1. On the hood duct, the roof/ceiling assembly consists of gypsum board and <br />wooded joists/truss (combustible rating) an 18" space shall be maintained <br />between the duct and the chase instead ofa 3" space. The duct will still require to <br />be wrapped. NFPA 96 (A.3.3.35) The same applies for the separation off the wall. <br />Plaster or gypsum on wood studs shall require 18" of separation (combustible <br />rating). Limited-combustible requires 3 inches. <br />2. Roof top fan shall have a grease cup. <br />3. From the hood down to the floor behind the stove exposure protection shall be <br />provided. Stainless steel or tile will be acceptable. <br />4. Class K fIre extinguisher shall be installed. <br /> <br />Inspections required: <br /> <br />1. Light test on hood and duct. Duct shall be tested before being installed; hood shall <br />be tested prior to being installed. After hood and duct has been installed a light <br />test shall be conducted at the connection seam. <br />2. Test and balance required on hood (3rd party). <br />3. Acceptance test for suppression system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.