Laserfiche WebLink
<br />General Conditions), (ii) all operator's manuals and product information data pertaining to any <br />equipment and machinery installed on the site, (iii) copies of all Permits, and (iv) a certificate of <br />occupancy or, as applicable, other evidence that the Work has been inspected and approved by <br />all required governmental authorities. The final Request for Payment will include all retainage <br />previously withheld. <br /> <br />C. Owner's inspections or payments shall not affect or limit Contractor's <br />warranty or indemnity obligations. All payments and payment obligations shall be subject to the <br />terms and conditions of this Construction Agreement and the General Conditions. <br /> <br />D. Notwithstanding anything herein to the contrary, no Request for <br />Payment, either interim or final, will be made unless adequate written documentation is <br />submitted to Owner in conjunction with the Request for Payment, sufficient to show, prior to <br />commencement of any Work (whether by Contractor or any Subcontractor) on that part of the <br />Project covered by the Request for Payment, that (i) all required Permits for the Work were <br />obtained; or (ii) a permit for the Work was not required. <br /> <br />ARTICLE IV BOND <br />4.1 Contractor f8Hall) (Shall Not) obtain a performance or surety bond in form acceptable to Owner. <br />Such form shall include coverage for any administrative or regulatory fines or penalties incurred by Contractor or by <br />Owner as a result of Contractor's non-compliance with law or the provisions of this Contract. The bond shall be <br />renewed annually and remain in place until a period of one year after Contractor's receipt of final payment <br />hereunder. <br /> <br />4.2 Owner (will) ('Nillnot) provide builder's risk insurance coverage as provided in Article XII of the <br />General Conditions. <br /> <br />ARTICLE V ASSIGNMENT <br />5.1 Owner has selected Contractor as general contractor for the Project because of Contractor's <br />particular abilities to perform the Work. Therefore, Contractor shall not be permitted to assign or broker its duties <br />and obligations under this Agreement, provided this Contractor may subcontract all or part of the Work in <br />accordance with the provisions of this Agreement. <br />128770 <br />Form GC <br />4400158 <br />5/04 <br /> <br />