My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6794
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:34:25 PM
Creation date
1/8/2008 11:30:05 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6794
Building Department - Name
PHILLIPS,BRIAN
Address
38919 11TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />/ <br /> <br /> <br />7< "#taft 7< (J(J~tft9 ' I} He, <br />Sewi<<9 ~?~ SiHu 19%0 <br />37325 SR 54 * Zephyrhills, Florida 33542 <br />Phone: 813-782-6094 Fax 813-783-2645 <br />License #CCC 1325505 <br /> <br />Customer: <br /> <br />:RCT <br />mJC:/ <br /> <br />Date: <br /> <br />Address: <br /> <br />U -\ ~ 4J;li! <br /> <br />City:Zeth'l~ <br /> <br />Zip: <br /> <br />Home Telephone: <br /> <br />Alternate Phone # <br /> <br />Business Phone # <br /> <br />~omPlete tear off of existing shingles <br />Ul' Roof dried in with #30- felt <br />~Install new valley metal with galvanized metal <br />l.lrY Re-secure all loose roof decking as needed <br />~ Install all new lead boots a."tl.o8ed <br />~/tnstall all new drip edge 88 RililB88 .~\< $" <br />l3'" ~nstall all new ~ ye~US-resistant shingles <br />tlj( Shingle Color ~\\ '. E \ ~ <br />G:Y' All debris removed from the job site <br />~AII materials, labor and permits furnished <br /> <br />Addnionalltems ~. (~1.~'1t <br />o~~> (). .0\- <br />(t '" . <br /> <br />Total bid price $ ::;01S: uO <br /> <br />Extra's x:) <br />Cl Bad plywood replaced at a cost of $ ';0. t.: per sheet in the roof field. All other wood work, such as valley rebuilding or rafter <br />replacement, will be at a rate of $ S:i, ...0 per man hour plus the cost of materials. <br /> <br />THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL. PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> <br />1. All material is guaranteed to be as specified and completed in a substantial workmanlike manner. <br />2. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, hurricane and other necessary insurance upon above work. <br />3. Labor warranty does not cover damage to roofs caused by lightning, hurricane, tornado, hailstorm, impact of foreign objects or other violent storm or casualty damage to roofs due <br />to settlement, distortion, failure or cracking of roof deck, walls or foundation of a building. <br />4. Workmen's compensation and public liability insurance on above work to be taken out by RYMAN ROOFING (a subsidiary of Ryman Construction, Inc.), or it's sub-contractors. <br />5. RYMAN ROOFING, INC is not responsible to provide any materials or to perform any work other than what is described above. Replacement of deteriorated decking, fascia board, <br />is not included and will be charged as an extra unless otherwise slated herein. <br />6. This contract is subject to final approval by RYMAN ROOFING, INC. and is the entire agreement of the parties and no other wriUen or other forms will be recognized. <br />7. A charge of 1.5% will be made on all unpaid balances after 30 days plus charges incurred for non-payment procedures. <br /> <br />Ryman Roofing, Inc. will not be responsible for <br />any septic tank, sod, shrubbery or paint damage. <br />Payment due upon completion of job. <br /> <br />Acceptance of Proposal <br /> <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. <br /> <br />Purchaser: <br /> <br />Date: <br /> <br />Estimator: <br /> <br />Date: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.