Laserfiche WebLink
<br />NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions" <br />which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance With any <br />applicable deed restrictions. <br />UNLICENSED CONTRACTORS. AND coNTRACTOR RESPONSIBILITIES: if the owner has hired a contractor or <br />contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the <br />contractor is not licensed as required by law, both the owner and contractor may be cited tor a misdemeanor Violation <br />under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the <br />intended work, they are advised to contact the Pasco County Building Inspection Division-licensing Section at 727-847- <br />8009. Furthermore, if the owner has hired a contractor or contractors, he Is advised to have the contractor(s) sign <br />portions of the "contractor Block" of this application for which they will be responsible. If you, as the oWner sign as the <br />contractor, that may be an indication that he Is not property licensed and is not entitled to permitting privileges in Pasco <br />County. <br />TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands <br />that Transportation Impact Fees and Recourse Recovery Fees may apply to the constrUction of new buildings, change of <br />use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 ahd <br />90-07, as amended. The undersigned also understands, that such fees, as may be due, will be Identified at the time of <br />permitting. It Is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br />receiving a "certificate of occupancy" or final power release, If the project does not Involve a certificate of occupahcy or <br />final power release, the fees must be paid prior to permit issuance. Furthermore, If Pasco County Water/Sewer Impact <br />fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br />CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): if valuation of work is $2,500.00 or more, I <br />certify that I, the applicant, have been provided with a copy of the "Florida Construction lien Law-Homeowner's <br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant Is someone <br />other than the .owner", I certify that I have obtained a copy of the above described document and promise in good faith to <br />deliver it to the "owner" prior to commencement. <br />CONTRACTOR'SfOWNER'S AFFIDAVIT: I certify that all the Information In this application is accurate and that all work <br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is <br />hereby made to obtain a permit to do work and installation as indicated. I certify that no work or Installation has <br />commenced prior to Issuance of a permit and that all work will be performed to meet standards. of all laws regulating <br />construction, County and City codes, zoning regulations, and land development regulations In the jurisdiction. I also <br />certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is <br />my responsibility to identify what actions I must take to be In compliance. Such agencies include but are not limited to: <br />Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br />Lands, Water/Wastewater Treatment. <br />Southwest Florida Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering <br />Watercourses. <br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. <br />Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment, <br />Septic Tanks. <br />US Environmental Protection Agency-Asbestos abatement. <br />Federal Aviation Authority-Runways. <br />I understand that the following restrictions apply to the use of fill: <br />Use of fill is not allowed in Flood Zone .V" unless expressly permitted. <br />If the fill material Is to be used in Flood Zone "A", it Is understood that a drainage plan addressing a <br />"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer <br />licensed by the State of Florida. <br />If the fill material Is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br />construction, I certify that fill will be used only to fill the area within the stem Wall. <br />If fill material is to be used In any area, I certify that use of such fill will not adversely affect adjacent <br />properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating <br />the conditions of the building permit Issued under the attached permit application, for lots less thah one (1) <br />acre which are elevated by fill, an engineered drainage plan Is required. <br />If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in <br />this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical wor~, <br />plumbing, signs, wells, pools, air conditioning, gas; or other installations hot specifically Included In the application. A <br />permit Issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or <br />set aside any provisions of the technical codes, nor shall issuance of a permit prevent the BUilding Official from thereafter <br />requiring a correction of errors in plans, construction or violations of any codes. Every permit Issued shall become invalid <br />unless the work authorized by such permit Is commenced within six months of permit Issuance, or If work authorized by <br />the permit Is suspended or abandoned for a period of six (6) months after the time the work is commenced. An extension <br />may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate <br />justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the job is considered abandoned. <br /> <br /> <br />CONTRACTOR <br />~bed end" <br />. 07 by , <br />. fare oersonR11y known to me 0 <br /> <br /> <br />/ <br /> <br />Notary Public <br />