Laserfiche WebLink
<br />'4' <br /> <br />'" <br /> <br />..~ <br /> <br />/~A.": <br /> <br />~~~~ <br />~ <br /> <br />1<tfmatt 1<oo~itt9' 'lHe, <br /> <br />s~ ~ 7tMid4 SUIu 1910 <br />37325 SR 54 * Zephyrhills, Florida 33542 <br />Phone: 813-782-6094 Fax 813-783-2645 <br />License #CCC 1325505 <br /> <br />Customer: ~ '\In 1"\<;S <br />Address: S q~ d.. ~lt~ LJJ <br /> <br />Date: 9 -b{ -07 <br />City:2eJ~'1j-h &'\\S <br /> <br />Zip: <br /> <br />Home Telephone:i{~ - ~343 <br /> <br />Alternate Phone # <br /> <br />Business Phone # <br /> <br />~omPlete tear off of existing shingles <br />~ .-Roof dried 'in with #3.(..L felt <br />(;J'" .Install new valley metal with galvanized metal <br />[J'" Re-secure all loose roof decking as needed <br />~Install all new lead boots.l> R88BilQ <br />~)nstall all new drip edgO"IJ I LlilS <br />~Install all new~ year fungus-resistant shingles <br />13" ..-Shingle Color t"""lA-J:.. C-fPf1;.SS~ <br />~ .-All debris removed from the job site <br />u;;r" All materials, labor and permits furnished <br /> <br />Addi~iRnalltems: ~S~~l~~ (l.:.l w..$.h ~."'~_ <br />r'&9ol V~ ~~___N- u....~ JEn~. <br />~ 'Ie b.. r ~hH- ~J1J",+f <br />~ k.-t'L S Uj)fi) C;~) SltJf.?~:> ~ .pl"'~ <br /> <br />Extra's .../ . -<')() <br />13" Bad plywood replaced at a cost of $~'. .. per sheet in the roof field. All other wood work, such as valley rebuilding or rafter <br />replacement, will be at a rate of $..$"5 . 0 (..1 per man hour plus the cost of materials. <br /> <br />I; u <br /> <br />Total bid price $:5510. oD <br /> <br />THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL. PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> <br />1. All material is guaranteed to be as specified and completed in a substantial workmanlike manner. <br />2. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, hurricane and other necessary insurance upon above work. <br />3. Labor warranty does not cover damage to roofs caused by lightning, hurricane, tornado, hailstorm, impact of foreign objects or other violent storm or casualty damage to roofs due <br />to settlement, distortion, failure or cracking of roof deck, walls or foundation of a building. <br />4. Workmen's compensation and public liability insurance on above work to be taken out by RYMAN ROOFING (a subsidiary of Ryman Construction, Inc.), or it's sub-contractors. <br />5. RYMAN ROOFING, INC is not responsible to provide any materials or to perform any work other than what is described above. Replacement of deteriorated decking, fascia board, <br />is not included and will be charged as an extra unless otherwise stated herein. <br />6. This contract is subject to final approval by RYMAN ROOFING, INC. and is the entire agreement of the parties and no other written or other forms will be recognized. <br />7. A charge of 1.5% will be made on all unpaid balances after 30 days plus charges incurred for non-payment procedures. <br /> <br />Ryman Roofing, Inc. will not be responsible for <br />any septic tank, sod, shrubbery or paint damage. <br />Payment due upon completion of job. <br /> <br />Purchaser: <br /> <br /> <br />Acceptance of Proposal <br /> <br />The above prices, <br /> <br />Date: <br /> <br />Estimator: <br /> <br />Date: <br /> <br />.i .>..4 <br />