Laserfiche WebLink
<br />12/-Q6/06 WED 18:05 FAX 727 867 9455 <br /> <br />WillinghamCompanies <br /> <br />~010 <br /> <br />$..t'I'~- <br />'_. ,II- <br />... <br />41. ': <br /> <br />Zephyrhllls profH81onal Center Site <br />P..co County, Florida <br />ODE Job No. O~ <br />Page 6 <br /> <br />must be added to the subgrade soils to produce an LBR of 40. DElpending on this test result, the <br />previous recommendations may have to be modified. <br /> <br />TESTING AND MONITORING <br /> <br />Construction monitoring and testing are essential to proper site construction and performance. <br />Gompliance with the recommended construction specification for compaction and soil types must be <br />verified by our engineering technician familiar with the project construction. Observation of site <br />I>reparation work is an integral part of the engineering recommenclations contained in this report, <br />Density tests should be performed for each lift of structural fill placed and per Pasco County <br />Specifications. <br /> <br />LIMITATIONS <br /> <br />This report has been prepared for the exclusive use of Willingham Architecture, PA for the specific <br />application to the project previously discussed. Our conclusions and recommendations have been <br />Irendered using generally accepted standards of geotechnical enginee.ring geology practice in the state <br />iOf Florida. No other warranty is expressed or implied. <br /> <br />Our conclusions and recommendations are based on the design information furnished to us, the data <br />obtained from the previously described subsurface exploration, and our experience. They do not <br />reflect variations in the subsurface conditions that are likely to exist in the region of our borings and in <br />unexplored areas of the site. These variations are due to the inherent variability of the subsurface <br />conditions in this geologic region. Should variations become appamnt during construction, it will be <br />necessary to re-evaluate our conclusions and recommendations bas.~d upon our on-site observations <br />of the conditions. <br /> <br />The site is underlain by limestone bedrock that is susceptible to dissolution and the subsequent <br />development of karst features such as voids and sinkholes in the natut"al soil overburden. Construction <br />in a sinkhole prone area is therefore accompanied by some risk that internal soil erosion and ground <br />subsidence could affect new structures in the future. It is not possible to investigate or design to <br />completely eliminate the possibility of future sinkhole related problems. In any event, the Owner must <br />understand and accept this risk. <br /> <br />The scope of our services does not include any environmental assefisments or investigations for the <br />possible presence of hazardous or toxic materials in the soil, groundwater or surface water within or in <br />the general vicinity of the site studied. Any statements made in this mport or shown on the test boring <br />logs regarding unusual subsurface conditions and/or composition. odor, staining. origin or other <br />characteristics of the surface and/or subsurface materials are strictly for the information of our client <br />and mayor may not be indicative of an environmental problem, <br /> <br />If changes are made in the overall design or the location of the proposed facilities, or if the finish <br />grades differ from those discussed herein, the recommendations presented in this report must not be <br />considered valid unless the changes are reviewed by our firm and recommendations modified or <br />verified in writing, We should be given the opportunity to review the fc)undation plan. grading plan and <br />the applicable portions of the project specifications when the design is finalized. This review will allow <br />us to check whether these documents are consistent with the intent of our recommendations. <br />