My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-6336
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-6336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:36:59 PM
Creation date
1/11/2008 9:39:38 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-6336
Building Department - Name
DAUGHTRY RD PROFF
Address
37922 DAUGHTRY RD BLDG 4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12/(}6/06 WED 17:54 FAX 727 867 9455 <br /> <br />WilllnghamCompanles <br /> <br />~003 <br /> <br />August24,2005 <br /> <br /> <br />Troy Willingham <br />Willingham Architecture, PA <br />1698 Manor Way South <br />51. Petersburg, Florida 33712 <br /> <br />IJIWIIIII DtJ"" EngintIBrinfl,lnt;. <br /> <br />RE: Report of Geotechnical Exploration <br />Zephyrhllls Professional Center Site <br />Pasco County. Florida <br />GDE Job No, 05-432 <br /> <br />Dear Mr. Willingham: <br /> <br />Ground Down Engineering, Inc. (GDE) has completed a geotechni(:al exploration for the referenced <br />project that you authorized. The purposes of this study were to explore general subsurface conditions <br />within the proposed structures and roadways and to use the data obtained to develop <br />recommendations related to earthwork procedures, foundation and roadway design, This report <br />describes our exploration procedure, presents the data obtained, and presents our conclusions and <br />recommendations regarding the geotechnical engineering aspects elf site design, <br /> <br />In summary, based on the results of this subsurface exploration, it appears thatthe soils atthe site are <br />suitable for development of the proposed commercial site following the site preparation <br />recommendations presented in this report. <br /> <br />GDE appreciates the opportunity to participate in this project and we trust that the information included <br />in this report is sufficient for your design. If you have any questions or comments concerning the <br />contents of this report, please contact us. <br /> <br />Sincerely, <br /> <br />Ground Down Engineering, Inc. <br />GDE FL Certificate of Authorization No. 9599 <br /> <br />~ <br /> <br />John C. Peak, P.E, <br />Vice President <br />FL Reg. No. 57018 <br /> <br />tZI2 ..... DrM . Idessa, Flertda Ui" . ......,...... . faarl1S-lZI-l4Ill <br />
The URL can be used to link to this page
Your browser does not support the video tag.