<br />NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
<br />which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br />applicable deed restrictions.
<br />UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: if the owner has hired a contractor or
<br />contractors to undertake work, they may be required to be licensed in accordance With state and local regulations. If the
<br />contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br />under state law. If the owner or Intended contractor are uncertain as to what licensing requirements may apply for the
<br />intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Sedion at 727-847-
<br />8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br />portions of the "contractor Block" of this application for which they will be responsible. If you, as the oWner sign as the
<br />contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br />County.
<br />TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br />that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change bf
<br />use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br />90-07, as amended. The undersigned also understands, that such fees, as may be dUe, will be identified at the time of
<br />permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees mUst be paid prior to
<br />receiving a "certificate of occupancy" or final power release, If the project does not involve a certificate of occupancy or
<br />final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br />fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br />CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): if valuation of work is $2,500.00 or more, I
<br />certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien LaW-Homeowner's
<br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br />other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br />deliver it to the "owner" prior to commencement.
<br />CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br />hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br />commenced prior to issuance of a permit and that all work will be performed to meet standards of all laWs regulating
<br />construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br />certify that I understand that the regulations of other government agencies may apply to the intended Work, and that it is
<br />my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br />Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br />Lands, Water/Wastewater Treatment.
<br />Southwest Florida Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering
<br />Watercourses.
<br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br />Department of Health & Rehabilitative Services/Environmental Heaith Unit-Wells, Wastewater Treatment,
<br />Septic Tanks.
<br />US Environmental Protection Agency-Asbestos abatement.
<br />Federal Aviation Authority-Runways.
<br />I understand that the following restrictions apply tb the use of fill:
<br />_ Use offill is not allowed in Flood Zone "V" unless expressly permitted.
<br />If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br />"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br />licensed by the State of Florida.
<br />If the fill material Is to be used in Flood Zone "N in connection with a permitted building Using stem wall
<br />construction, I certify that fill will be used only to fill the area within the stem Wall.
<br />If fill material is to be used in any area, I certify that use of such fill Will not adversely affect adjacent
<br />properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br />the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br />acre which are elevated by fill, an engineered drainage plan is required. .
<br />If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br />this affidavit prior to commencing construction. I understand that a s,eparate perm~t. may ?e requir~d for elect~ica.1 work,
<br />plumbing, signs, wells, pools, air conditioning, gas, or other installations not speCifically 1n?luded. In the apphcatlon. A
<br />permit issued shall be construed to be a license to proceed with the work a~d not as. authorr~y !o vlolat~, cancel, alter~ or
<br />set aside any provisions of the technical codes, nor shall. iss~ance of a permit prevent the B~II.dlng OffiCial from the~eaft~r
<br />requiring a correction of errors in plans, construction or vlolat~o~s o~ any codes.. Every ~ermlt Isslled. shall become. Invah~
<br />unless the work authorized by such permit is commenced Within SIX months of permltlssu~nce, or If work authorrzed. by
<br />the permit is suspended or abandoned for a period of six (6) months after the time th~ work IS commenced: An extension
<br />may be requested, in writing, from the Building Official for a period not t~ exceed n1n~ty (90) days and Will demonstrate
<br />justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the Job is conSIdered abandoned.
<br />
<br />WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN Y9UR
<br />PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br />WITH YOUR LENDER OR N ATT RNEY BEFORE RECORDING YOUR T C OF CO MEN CEMENT.
<br />FLORIDA JURAT (F.S. 17. 3)
<br />
<br />
<br />CONTRACTOR
<br />Subscribed and swo a e be~ e this
<br />by Y\
<br />Who Is/are personally known to me or haslhave produced
<br />p. { . as Identtflcation.
<br />
<br />
<br />Notary Public
<br />NOTARVPUBUC-STATE OF FLORIDA
<br />,...... S nI e Bahr
<br />""~~ .', UL.c1 1
<br />
<br />; ~Commission #DD601110
<br />Name of Notary typed. print' '"'' ta~es: NOY. 15, 2010
<br />BO:\DE.D THRU !J1..\.'I/T1C BONDING CO., INC.
<br />
<br />
<br />Name of Notary typed. printed b. .' ires: NOY. 15, 2010
<br />BO~i:iEJ; THRU ATL\.'I/T1C BONDING CO., INC.
<br />
|