Laserfiche WebLink
<br />p"roject: SLEEP <br />Title: SLEEP LAB BUILDING <br />Type: Healthcare-Clinic <br />(WEA File: Tampa.tmy) <br /> System Report Compliance <br />PrOSyl System 1 Constant Volume Air Cooled No. of Units <br /> Split System < 65000 Btu/hr 1 <br />Component Category Capacity Design Err Design IPLV Comp- <br /> Err Criteria IPLV Criteria Hance <br />Cooling System Air Cooled < 65000 Btu/h 13.00 13.00 8.00 PASSES <br /> Cooling Capacity <br />Air Handling Air Handler (Supply) - 0.80 0.90 PASSES <br />System -Supply Constant Volume <br />PrOSy2 System 2 Constant Volume Air Cooled No. of Units <br /> Split System < 65000 Btu/hr 1 <br />Component Category Capacity Design Eff Design IPLV Comp- <br /> Err Criteria IPLV Criteria Hance <br />Cooling System Air Cooled < 65000 Btu/h 13.00 13.00 8.00 PASSES <br /> Cooling Capacity <br />Air Handling Air Handler (Supply) - 0.80 0.90 PASSES <br />System -Supply Constant Volume <br />PrOSy3 System 3 Constant Volume Air Cooled No. of Units <br /> Split System < 65000 Btu/hr 1 <br />Component Category Capacity Design Err Design IPLV Comp- <br /> Err Criteria IPLV Criteria liance <br />Cooling System Air Cooled < 65000 Btu/h 13.00 13.00 8.00 PASSES <br /> Cooling Capacity <br />Air Handling Air Handler (Supply) - 0.80 0.90 PASSES <br />System -Supply Constant Volume <br /> I PASSES I <br /> Plant Compliance <br />Description Installed Size Design Min Design Min Category Comp <br /> No Err Err IPLV IPLV liance <br /> I None I <br /> <br />7/30/2007 <br /> <br />EnergyGauge Summit v3.1 0 incorporating Florida Energy Code Version - FLAlCOM 2004 v2.5 <br /> <br />5 <br />