Laserfiche WebLink
<br />July 27, 2007 <br /> <br />Plan Review Comments <br /> <br />I have reviewed and disapproved the plans for a gas line installation located at 7050 Gall <br />Blvd. (f'lorida Hospital) for a kitchen range and fryer. My comments have been placed <br />below. Please contact me if you have any questions with regards to my comments. <br /> <br />1. Drawing is not ledge able. Drawing shall be schematic/architectural in nature <br />showing all connections, anchoring locations, pipe size and type, etc... <br />2. No mention of this being a propane or natural gas installation. <br />3. Details and specs shall be submitted with drawing on gas valve, LP tank: (if one), <br />gas appliances and all other components, along with a scope of work <br />4. Ballrrd protection shall be needed if it is in a vehicular area or an area that has <br />lawn mowing taking place. <br />5. To €fisure correct operation of other systems (exhaust hood, suppression system) a <br />letter shall be submitted to verify that the suppression system in the hood is <br />compliant with the gas range and stove and a test and balance is with in normal <br />limits for the kitchen exhaust hood. <br />6. A carbon monoxide detector shall be installed in the kitchen area for the gas <br />installation. <br />