Laserfiche WebLink
<br />. <br /> <br />.... <br /> <br />/'''': <br /> <br />'I" ~~ <br />~ <br /> <br />~ifman ~(J(J~in91 'lHC, <br /> <br />s~ ~?~ SUra 1910 <br />37325 SR 54 * Zephyrhills, Florida 33542 <br />Phone: 813-782-6094 Fax 813-783-2645 <br />License #CCC 1325505 <br /> <br />Customer: '3ar-'bD.Jo... ~u.sc:..~LL <br />Address: 5"'o'-jc;" _~.'Y"I.v-h. 1\ Dr. <br />Home Telephone: I '74~ 0371 Alternate Phone # <br /> <br />Date: 9-dO-o7 <br />City: ..2~h1 r-\..: n.S Zip:s:s:>-<tJ.. <br /> <br />Business Phone # <br /> <br />~comPlete tear off of existing shingles <br />Id "Roof dried in with #~ felt <br />~ Install new valley metal with galvanized metal <br />l.!::I Re-secure all loose roof decking as needed <br />~' Install all new lead boots 88 Rsoggd <br />~ Install all new drip edge 88 R99Qed6" w~~~ <br />[?' Install all new..3a- year fungus-resistant shingleg2i:Jfl)})h <br />8" Shingle Color Elk ShCA ~~ ~ <br />G:( All debris removed from the job site <br />~ All materials, labor and permits furnished <br /> <br />Addilionalltem;>; .J;,,:;~\\ SD' m :'it,; 'l~J:. <br />~ r~~:. ~\\(~ <br />' , ..., (; A V kc.k.,.). ~ c__ _. --' -H <br />~ ~Ii' . <br /> <br />~.('""1ejA.r L(i,. '-'or- lv.a.rrQ/\+t <br /> <br />Total bid price $ 7soo. 00 <br /> <br />Extra's . <br />if Bad plywood replaced at a cost of $ 45: 00 per sheet in the roof field. All other wood work, such as valley rebuilding or rafter <br />replacement, will be at a rate of $ .s:"r.. 00 per man hour plus the cost of materials. <br /> <br />THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL. PURCHASER ACKNOWLEDGES RECEIPT OF A COpy OF THIS CONTRACT. <br /> <br />1. All material is guaranteed to be as specified and completed in a substantial workmanlike manner. <br />2, All agreements contingent upon strikes, accidents or delays beyond our control, Owner to carry fire, hurricane and other necessary insurance upon above work. <br />J Labor warranty does not cover damage to roofs caused by lightning, hurricane, tornado, hailstorm, impact of foreign objects or other violent storm or casualty damage to roofs due <br />to settlement, distortion, failure or cracking of roof deck, walls or foundation of a building. <br />4. Workmen's compensation and public liability insurance on above work to be taken out by RYMAN ROOFING (a subsidiary of Ryman Construction, Inc.), or it's sub-contractors. <br />5. RYMAN ROOFING, INC is not responsible to provide any materials or to perform any work other than what is described above. Replacement of deteriorated decking, fascia board, <br />is not included and will be charged as an extra unless otherwise stated herein. <br />6, This contract is subject to final approval by RYMAN ROOFING, INC. and is the entire agreement of the parties and no other written or other forms will be recognized, <br />7, A charge of 1.5% will be made on all unpaid balances after 30 days plus charges incurred for non-payment procedures. <br /> <br />Ryman Roofing, Inc. will not be responsible for <br />any septic tank, sod, shrubbery or paint damage. <br />Payment due upon completion a/job, <br /> <br />Acceptance of Proposal <br /> <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. <br /> <br />(Purchaser: <br />Estimator: <br />7J IJK* fe.~ <br /> <br />