<br />NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to "deed" restrictions"
<br />which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance With any.
<br />applicable deed restrictions.
<br />UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br />contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br />contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br />under state law. If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br />intended work, they are advised to contact the Pasco County Building Inspection Division-Licensing Sedion at 727-847-
<br />8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br />portions of the "contractor Block" of this application for which they will be responsible. If you, as the oWner sign as the
<br />contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br />County.
<br />TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned lInderstands
<br />that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br />use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordihance number 89-07 and
<br />90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br />permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br />receiving a "certificate of occupancy" or final power release; If the project does not involve a certificate of occupancy or
<br />final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco Collnty Water/Sewer Impact
<br />fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br />CONSTRUCTION LIEN LAW (Chapter 713, Florida Statutes, as amended): if valuation of work is $2,500.00 or more, I
<br />certify that I, the applicant, have been provided with a copy of the "Florida Construction lien Law-Homeowner's
<br />Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br />other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br />deliver it to the "owner" prior to commencement.
<br />CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br />will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br />hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br />commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br />construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br />certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br />my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br />Department of Environmental Protection-Cypress Bayheads, VVetlandAreas and Environmentally Sensitive
<br />Lands, Water/Wastewater Treatment.
<br />Southwest Florida. Water Management District-Wells, Cypress Bayheads; Wetland Areas, Altering
<br />Watercourses.
<br />Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br />Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, WasteiNater Treatment,
<br />Septic Tanks.
<br />US Environmental Protection Agency-Asbestos abatement.
<br />Federal Aviation Authority-Runways.
<br />I understand that the following restrictions apply to the use of fill:
<br />Use of fill is not allowed in Flood Zone "V" unless expressly permitted.
<br />If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br />"compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br />licensed by the State of Florida.
<br />If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br />construction, I certify that fill will be used only to fill the area within the stem iNall.
<br />If fill material is to be used in any area, I certify that use of such fill Will not adversely affect adjacent
<br />properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br />the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br />acre which are elevated by fill, an engineered drainage plan is required. .
<br />If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br />this affidavit prior to commencing construction. I understand ~hat a s,eparate perm~t. may ?e requir~d for elect~ica.1 work,
<br />plumbing, signs, wells, pools, air conditioning, gas; or other ~nstallatlons not speCifically In~luded, In the application. A
<br />permit issued shall be construed to be a license to proce~d with the work a~d not as authorl~y !o vlolat~,cancel, alter, or
<br />set aside any provisions of the technical codes, nor shall Issuance of a permit prevent the B~II.dlng OffiCial from the~eaft~r
<br />requiring a correction of errors in plans, construction or violat!o~s o! any codes. EveI!' ~ermlt ISSUed, shall become. Invall~
<br />unless the work authorized by such permit is commenced within SIX months of permit Issuance, or If work authorized by
<br />the permit is suspended or abandoned for a period of six (6) months after the time th~ work is commenced.. An extension
<br />may be requested, in writing, from the Building Official for a period not t~ exceed mn~ty ~90) da~s and Will demonstrate
<br />justifiable cause for the extension. If work ceases for ninety (90) consecutive days, the Job IS conSidered abandoned.
<br />
<br />WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN yqUR
<br />PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, IF YOU INTEND TO OBTAIN FINANCING, CONSULT
<br />WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCE ENT.
<br />FLORIDA JURAT (F.S. 117.03) .
<br />.G-
<br />OWNER OR AGENT . CONTRACTOR .:-;;;-;;; - . _t!. .
<br />Subscribed and swor.Q4o (or:JImrmed}b~ m~hls 15+",Mllhck Subscribed and swom ( am e) fo thIS I rl'lp-'....C.....V
<br />:2007 by MlJ::'U1t:./'.-J, :;L-U vi //1 ole ~7 by
<br />Who Is/are personally known 10 me or haslhave produced Who is/are personally known to me or has/have pro uced
<br />'"D. . as Identification. D.L . as Identification.
<br />
<br />
<br />0~~ ~ ",ta".Publl'
<br />Commission No. . r
<br />'\::,!:.~~Y PUBLIC-STATE OF FLORIDA
<br />Name of Notary typed, Pri~~~r~t~~~~~~~~~cDg6d~~~ 10
<br />",;""J . :\OV. 15 2010
<br />BO\DED 1 HRU AIL ,TIC lJO.\DE\G CO., I!\C.
<br />
<br />
<br />
<br />Notary Public
<br />
<br />~'ml. nY PI mIle-STATE OF FLORIDA
<br />. ."..... Cuzanne Bahr
<br />t'. ' i)
<br />".". ,~\ '.l. iT
<br />Name of Notary typed, p~ r,S ,P,.,'U' 15 2010
<br />"'(111;\\""" L\< ~~,~" ~ "i ~. " .
<br />1l0;\DED THRU fu L. .le BO\Dl\G co" I\C.
<br />
|