My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-7117
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-7117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:32:50 PM
Creation date
1/17/2008 8:12:30 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-7117
Building Department - Name
JONES,ERIC
Address
37410 TEABERRY LP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10/15/2007 <br /> <br /> <br />'Roofing Cf)ivi.~ion <br />LIC# CBC058155 <br />LIC# CCC1326166 <br /> <br />Re: m,(Y>~..g W~ <br />a7l{ II) ~ Tea erry Loo Q J _ _ <br />Zepbyrbills, FL "3 3~~ 0 b 7 t8~ Lj Od-.q <br /> <br />W,A. Neumann Roofing Division, Inc. proposes to furnish all the labor, material, supervision, <br />equipment, fees and other costs to complete the project located at 37tfl 0 Tea Berry Loop according <br />to specifications listed below, The price includes: <br /> <br />1. Tear off existing one layer of shingles from deck,(re-nail plywood were needed) <br />2. Replace any rotted or damaged decking $65.00 per sheet, (1 sheet included in contract price) <br />3. Replace any rotted fascia $4.50 per foot <br />4. Install new large face white wood grain drip edge <br />5. Install GAF ICE/W A TER Weather Watch on entire roof <br />6. Install all new led boots and vents, (all boots and vents will be painted to match roof color) <br />7. Install ELK Starter Strip on all rakes and runs <br />8. Install new 30yr ELK High Definition shingles with Stain Guard aV'\-J, '6 u..a.. ~ {o,..A--Q. <br />9, Install new O.C. Vent Sure Ridge Vent covered with ELK ridge cap <br />10. Install new ELK SAR ridge cap <br />11. Haul away all roof-related debris <br />12. Our liability insurance coverage is based on completed operations <br />13. 15yr ELK/GAF Peak Performance Warranty included free of charge <br />14. Provide a 5-year workmanship warranty <br />15, Payment schedule: Due upon job completion <br />
The URL can be used to link to this page
Your browser does not support the video tag.