My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-7160
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-7160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:32:33 PM
Creation date
1/17/2008 8:55:50 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-7160
Building Department - Name
TENCH,VICKI T
Address
6147 RIDGEWAY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-- .....~" <br /> <br />. \ . <br />~ <br /> <br />..~ <br /> <br /> <br />For custom transition flashing specify the pitches of the two roof slopes and, if <br />required, specify dimensions "a" and b" <br /> <br />The transition flashing provides a continuous drainage where two slopes meet. <br /> <br /> <br />The Ridge Cap is used to seal the point at which two upward slopes meet. This <br />can be both along the ridge of the roof as well as a covering for a hip. Either <br />wood-grip or setf-drilling lap TEK screws are applied through the ribs of the metal <br />roofing panels, <br /> <br />Debris, insects, prevailing rain can find easy access under the ridge cap, so <br />closures are often used to either totally or partially seal the opening. Closures <br />under ridge caps are available in 3 types: solid, vented, and hip valley type. <br /> <br />See Diagram Drawings attached to this guide. <br />
The URL can be used to link to this page
Your browser does not support the video tag.