My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-7279
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-7279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:32:02 PM
Creation date
1/17/2008 10:48:34 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-7279
Building Department - Name
GOLDEN HEALTH
Address
37411 EILAND BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-Cee. 6, 2007-10:06AM <br />C~~~ <br /> <br />No. 1306-P, 2 <br />;':: lb Contrac.o -J 'CQ~STRUCTION SUBCONTRACT <br />\J . , r -5. \.,~., 'j Subcontract No. 2601-02900 <br /> <br />Subcontractor's Mailing Address: <br />Sun Stale Land.~caping <br />5805-B Breckenridge Pkwy. <br />Tampa, FL 33610 <br />Attl'1: CaTlo:; Alvare7. <br />Ph(lnc: 813-621-2090 Fax: 813-626-8680 <br /> <br />Subcontract Date: 11/112007 <br />Project Name: West Winds, ALF <br />Project Number: 2601.00 <br />Owner: Golden Health Services, Inc:. <br />Architect: O'Keefe Architects, lnc, <br />Principal ContrclCt D-clted: 4/2412006 <br /> <br />CORE Construction's (Contractor) Job Site Address: <br />37411 Eiland Blvd. <br />Zephyrbills, FL 33542 <br />Phone: 813-788-7345 Fax: 813-788-7387 <br /> <br />Article L The Subcontractor agree.... to furnish all necessary labor, matcriaJs, scrviees, tools, equipment, ~upplies, temporary facilities, hoisting. scaffolding, <br />appliances, supervision and all other components necCSSllIy to perform. and shall perform the work generally dcs,-Tibcd llli: <br /> <br />Contractor's Rilling Address: <br />3307 Clark Road, Suite 201 <br />Sarasota, FL 34231 <br />Phone: 941-552-0240 Fax: 941-552'()245 <br /> <br />ALL LANDSCAPE and IRRIGATION WORK in accordance with Plans, SpeCifications lIfid Addendall.S preparcd by O'Kccf'e Architect,c;, Inc. and as <br />cnumCflltcd in Appendix tIC" ofmis Subcontract and in compliance with Appendix "A" and additional clarifications in Appendices "B", "0" & "E", This <br />Subcontract No. 2601-02900 and all of its Appendices shall collectively be hcreinafter called the "Subcontract Documents" as recited in Appendix "CO, and <br />1\11 such Appendices are incorporated herein by reference lIfid made a pan hereof. Wherever the term "Subcontnlct" is used herein it shall bc deemed to <br />include one or more such Appendices, if applicable, regardless of whether such Appendices lm: lo"pccilically referenced. The project is identified a.c; a sixty <br />ninc (69) unit, single-sIOJ)' II.llsilo'ted living facility. The Scope of Work includes. bul is not limited to, the following: <br /> <br />1. Work to bc pcrfonned in accordance with all applicable codes and ordinances. <br />2. Work area.c; AAall be cleaned daily by the Subcontnlctor, or Contractor reserve.c; the right to complete such work !lnd dcductlhe cost from the <br />subcon~t amount iflhe SubcOnLraclor docs not comply. <br />3. Subcontractor shalllldhm: to Contractor's schedule, supplying the necessary mllnpower as needed, <br />4. Subcontractor shall coordinate work with Contractor's superintendent <br />5. Subcontractor shall furnish to the Contractor a daily report at the end of each day. <br />6. Subcontractor shall notii}' Contractor (If all inspections requested. The Subcontractor shall reimburse the Contractor for the cost of all failed <br />inspections related to the Subcontractor's scope of work. <br />7. Subcontractor shall receive. unload, distribute and suitably store all materials required Jor its scope of work. <br />8. SubconlJ'"dctor shall aHead all meetings by the Contractor. A weekly progress meeting will be held md the Subl."OntrdCtor must attend with a <br />representative. fully empowered with thc authority to speak on behalf ofthe Subcontrllctor. <br />9. Subcontractor shall furnish five (5) copje~ of submiuals and lhe M.S.D.S. book to the Contractor within five (5) days after receipt of a signed <br />contract <br />10. Subcontractor to adhere to all O.S.r I.A. and CORE Construction's Safety Proccdures. <br />11. Subcontractor !:hall provide all labor, matcrialllfid equipment to complete installation of allland.c;cape and irrigation in strictaccordllficc with <br />all contraet documents all pennits included. <br />!\. Complete irrigation system lIS shown on dl'll.wings including aU sleeving. <br />b. Complele land~lping including all plants, sod, mulch, fertili7.ers, and watering os shown on the attached estimate II.ll agreed upon by <br />DI."I1I1is O'Kcc:fc. <br />12. Alllandscapc shall be maintained untit owner accept,Ulce. <br /> <br /> CONTRACT PRICE: 5150.000.00 <br />SUBCONT CONTRACTOR: <br />By: By: ;r. <br /> Calvin E. Reiling, Oir. Field tions-Sarasota <br /> CORE Construction <br />Date: Date: 11/1/2007 Page 1 of 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.