My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-7293
Zephyrhills
>
Building Department
>
Permits
>
2007
>
07-7293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:31:58 PM
Creation date
1/18/2008 8:26:26 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-7293
Building Department - Name
GOLDEN HEALTH
Address
37411 EILAND BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Zephyrhills Fire Rescue <br />6907 Dairy Road, Zephyrhills, FL 33542 <br /> <br />Fire Marshal <br />Kerry Barnett <br /> <br />Bus (813) 780-0041 <br />Fax (813) 780-0044 <br /> <br />December 7, 2007 <br /> <br />Plan Review Comments <br /> <br />I have reviewed and approved the plans for a commercial hood located at 37411 Eiland <br />Blvd under the following conditions. My comments have been placed below. Please <br />contact me if you have any questions with regards to my comments. <br /> <br />1. Hood and duct shall comply with all current standards ofNFP A 96. <br />2. Roof top fan shall be hinged and have a grease cup. <br />3. Hood duct shall be wrapped with fire rated insulating blanket or installed in rated <br />chase. <br />4. From the hood down to the floor and width of hood exposure protection shall be <br />provided on wall. Stainless steel or tile will be acceptable. <br /> <br />Inspections required: <br /> <br />1. Light test on hood and duct. Duct shall be tested before being installed; hood shall <br />be tested prior to being installed. After hood and duct has been installed a light <br />test shall be conducted at the connection seam. <br />2. Test and balance required on hood (3rd party) with copy supplied to Fire Marshal <br />at :final test. <br />3. Hood:final will be conducted during acceptance test on suppression system, <br />
The URL can be used to link to this page
Your browser does not support the video tag.