My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AMERIKOOLER ARCHITECTURAL SPECS.07-7038
Zephyrhills
>
Building Department
>
Permits
>
Product Specification Books
>
AMERIKOOLER ARCHITECTURAL SPECS.07-7038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2008 8:36:33 AM
Creation date
1/18/2008 10:36:41 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
07-7038
Building Department - Name
KOB PROPERTIES LLC
Address
7825 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />fan cycling control shall be provided and mounted for proper <br />operation. <br /> <br />e. Aluminum roof stand frame shall be used, designed to comply <br />with South Florida Building Code, 2005, as requested. <br /> <br />IV. INSPECTION <br /> <br />1) Field check before fabrication of Walk-in coolerlfreezer rooms. <br /> <br />2) Shop drawings must show actual and exact walk-in outside dimensions. <br />Must show a minimum space between building wall and panel wall of 2 to <br />3 inches. <br /> <br />3) Wall trims shall be of size, shape required, and of the same exterior walk- <br />in metal skin. <br /> <br />4) The above shall be the responsibility of the dealer and/or distributor. <br /> <br />5) Dealer and/or distributor shall be responsible for changes in state or local <br />building codes. <br /> <br />V. INSTALLATION <br /> <br />1) Install Walk-in cooler/freezer rooms according to the recommendations <br />and approved shop drawings. <br /> <br />2) Install Walk-in coolerlfreezer panel floor section on a level floor. When <br />recessed floor, door sill plate shall be at same elevation, flush to kitchen <br />floor at walk-in bottom door opening. <br /> <br />3) After floor panel section is installed, any empty space under floor panels <br />should be filled with liquid urethane foam to maintain level position. This <br />procedure shall be done by drilling through the cam-Iock access port and <br />through the bottom metal skin. Then, introduce the plastic hose from the <br />liquid urethane foam can and fill the empty space under the floor panel(s) <br />with a small amount of liquid foam. <br /> <br />4) All door jambs must be level in all directions for door to be gravity self- <br />closing, door closer activation, and door magnetic positive seal. Door and <br />frame are fitted! assembled, with tested electrical components, before <br />being packaged and shipped together. All freezer doors shall have a <br />Pressure Relief Vent (pRY) mounted and wired on door frame (jamb). <br /> <br />Page 80f9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.