<br />(V)
<br />o
<br />.
<br />(J)
<br />C\I
<br />.
<br />C\I
<br />-r-
<br />
<br />. .
<br />
<br />w
<br />~
<br />o
<br />I-
<br />o
<br />..J
<br />a.
<br />
<br />ELECTRICAL SPECifiCATIONS
<br />
<br />A THE ELEC TRtCAL DRAY'll NGS SH001 THE GENERAL
<br />ARRANGEMENT OF ALL EQUIPMENT AND
<br />APPURTENANCES AND SHALL BE FOLL001ED AS
<br />CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND
<br />0l0RK OF ALL OTHER TRADES 0lILL PERMIT.
<br />
<br />B, ALL MATERIALS AND 0l0RKMANSHIP SHALL
<br />COMPLY 0lITH ALL APPLICABLE CODES,
<br />SPECIFICATIONS, LOCAL ORDINANCES, INDUSTRY
<br />STANDARDS AND UTILITY COMPANY REGULATIONS,
<br />APPLICABLE CODES AND STANDARDS SHALL
<br />INCLUDE ALL STATE LA01S, LOCAL ORDINANCES,
<br />AND THE NATIONAL ELECTRICAL CODE, IC\C\C\
<br />EDITION.
<br />
<br />C. ALL REQUIRED fEES, PERMITS AND INSPECTIONS
<br />SHALL BE OBTAINED AND PAID FOR BY THE
<br />CONTRAC TOR.
<br />
<br />D, THE CONTRACTOR SHALL VISIT THE SITES OF 0l0RK
<br />BEFORE SUBMITTING A PROPOSAL, AND SHALL
<br />THOROUGHLY FAMILIARIZE HIMSELF 0lITH THE
<br />EXISTING CONDITIONS AND OPERATIONS, FAILURE
<br />ON HIS PART TO 00 THIS 0lILL NOT BE CAUSE FOR
<br />EXTRAS BY REASON OF UNFORESEEN CONDITIONS
<br />AFTER THE CONTRACT IS SI6NED,
<br />
<br />E, CONDUIT FOR BRANCH CIRCUITING SHALL BE
<br />ELECTRICAL METALLIC TUBING (EMT). 3/4 INCH
<br />MINIMUM, MILD STEEL, 6ALVANIZED OUTSIDE,
<br />COATED INSIDE AND SHALL CONFORM TO ANSI
<br />C~O,3, CONDUIT FOR PANEL AND MOTOR fEEDERS
<br />SHALL BE GALVANIZED RIGID STEEL OR IMC
<br />UNLESS NOTED OTHERlI'lISE.
<br />
<br />F, THE CONTRACTOR SHALL FURNISH AND INSTALL A
<br />COMPLETE 600 VOLT 0lIRE AND CABLE SYSTEM
<br />AS HEREIN SPECifiED AND AS INDICATED ON THE
<br />DRAhINGS. 0lIRE AND CABLE SHALL CONFORM TO
<br />NEMA STANDARD 0lC-5. AND SHALL BE UL
<br />LABELED, BRANCH CIRCUITS SHALL BE CODE TYPE
<br />THHN/THhN, SOLID COPPER, NO, 12 AlI'lG MINIMUM,
<br />
<br />G. 6ENERAL 0lIRING DEVICES AND PLATES SHALL BE
<br />SPECIFICATION 6RADE AS MANUFACTURED BY
<br />ARR001 HART, HUBBELL, OR LEVITON. S01ITCHES
<br />AND RECEPTACLES SHALL CONfORM TO ANSI
<br />STANDARD c..13, UL 20, AND UL 4C\~. PROVIDE 20
<br />AMP RATED RECEPTACLES AND ShlTCHES lI'llTH
<br />IVORY COLOR, PROVIDE IVORY PLASTIc.. 0lALL
<br />PLATES,
<br />
<br />H. ALL CONDUIT SYSTEMS, METALLIC SUPPORTS,
<br />CABINETS, PANEL BOARDS AND EQUIPMENT CASES
<br />SHALL BE PERMANENTLY AND EffECTIVELY
<br />GROUNDED IN ACCORDANCE lI'llTH NEc.. ARTICLE
<br />250 AND IEEE STANDARD 142, CONTINUITY OF
<br />EQUIPMENT 6ROUND SHALL BE MAINTAINED
<br />THROUGHOUT THE SYSTEM PROVIDE IN THE SAME
<br />RACE01AY 0lITH THE ASSOCIATED PHASE AND
<br />NEUTRAL CONDUCTORS. A 6REEN EQUIPMENT
<br />GROUND CONDUCTOR AS SIZED ON DRAlI'lINGS. **12
<br />A01G MINIMUM EQUIPMENT GROUND CONDUCTOR
<br />SHALL HAVE SAME INSULATION TYPE AS PHASE
<br />AND NEUTRAL CONDUCTORS.
<br />
<br />SEE SHEET EI,O FOR DIM,
<br />
<br />
<br />----...
<br />
<br />~
<br />I
<br />
<br />/ FLOOR
<br />
<br />SINGLE STATION
<br />CD~T<:,~ER/TEL. DATA
<br />
<br />I, THE CONTRACTOR SHALL INSTALL ALL LIGHTING
<br />fixTURES AND LIGHTING EQUIPMENT COMPLETE 0lITH
<br />MOUNTING HARDlI'lARE. STRAPS, BALLAST, LAMPS
<br />ETC" IN STRICT ACCORDANCE 0lITH THE LIGHTING
<br />flXTlJRE SCHEDULE ON DRA01INGS.
<br />
<br />j, THE CONTRACTOR SHALL INSTALL ALL LAMPS AS
<br />SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE,
<br />LAMPS SHALL BE GENERAL ELECTRIC, PHILLiPS OR
<br />OSRAM SYLVANIA
<br />
<br />K, CONTRACTOR SHALL UTILIZE AS MUCH EXISTING
<br />EQUIPMENT (LIGHT FIXTURES), EXHAUST FANS,
<br />RECEPTACLES, ETC.) AS POSSIBLE. ALL UNUSED
<br />EQUIPMENT SHALL BE STORED OR DISPOSED AS
<br />DiREC TED BY ALL TEL,
<br />
<br />L. FURNISH A lI'lRITTEN CERTifiCATE OF GUARANTEE
<br />OF MATERIALS, EQUIPMENT AND LABOR TO BE
<br />FREE OF DEFEc..TS FOR ONE YEAR fROM DATE OF
<br />FINAL ACCEPTANCE AND AGREE THEREBY TO
<br />REPLACE, REPAIR OR IN OTHER MANNER MAKE
<br />GOOD ANY DEfECTS APPEARING IN THAT PERIOD
<br />0lITHOUT ADDITIONAL COST TO THE 001NER.
<br />
<br />o
<br />
<br />""
<br />I
<br />I
<br />I
<br />
<br />o
<br />
<br />
<br />/
<br />
<br />'-- --------
<br />
<br />SEE SHEET EI.O FOR DIM.
<br />
<br />
<br />/
<br />( I
<br />1
<br />101
<br />\ )
<br />/
<br />
<br />
<br />~
<br />I
<br />
<br />/ FLOOR
<br />
<br />DOUBLE STATION
<br />0~<:,~ER/TEL. DATA
<br />
<br />/
<br />(~ 0
<br />0
<br />I
<br />I
<br />\
<br /> /
<br />'-- --------
<br />
<br />
<br />DATA/TEL.
<br />OUTLET
<br />
<br />d
<br />~
<br />i
<br />~
<br />i
<br />III
<br />o
<br />~
<br />~
<br />II.
<br />o
<br />I-
<br />Z
<br />III
<br />It
<br />~ ~
<br />c 0
<br />~ ~
<br />~ ~
<br />i
<br />~
<br />III
<br />~ ~
<br />i ~
<br />~ ;
<br />I-
<br />J
<br />o
<br />~
<br />~ ~
<br />
<br />z
<br />i
<br />
<br />>
<br />~
<br />~
<br />o
<br />III
<br />~
<br />~
<br />o
<br />~ ~
<br />g 5
<br />[ In
<br />~ ~
<br />~ 0
<br />Ii
<br />III
<br />[
<br />~
<br />a
<br />~
<br />J
<br />I
<br />~
<br />III
<br />II
<br />~
<br />I-
<br />o
<br />Z
<br />III
<br />~
<br />o
<br />~
<br />d
<br />~
<br />i
<br />~
<br />~
<br />III
<br />o
<br />~
<br />~
<br />IL
<br />o
<br />~
<br />~
<br />~
<br />II.
<br />III
<br />I
<br />I-
<br />
<br />~
<br />~
<br />~
<br />~
<br />~
<br />~
<br />5
<br />Ii
<br />~
<br />z
<br />o
<br />J
<br />.J
<br />()
<br />~
<br />i
<br />iii
<br />r:
<br />III
<br />I
<br />o
<br />III
<br />Z
<br />~
<br />~
<br />~
<br />III
<br />()
<br />Z
<br />~
<br />o
<br />~
<br />~
<br />9
<br />III
<br />~
<br />o
<br />~
<br />
<br />~ i
<br />C III
<br />~ ~
<br />~ ~
<br />
<br />j-BOX
<br />
<br />DUPLEX TEL.
<br />OUTLET
<br />
<br />DUPLEX DATA
<br />OUTLET
<br />
<br />j-BOX
<br />
<br />, . . . . .
<br />
<br />
<br />.~..
<br />....atO.
<br />(~,
<br />
<br />. .. ::::: :. :::
<br />
<br />
<br />o~
<br />~~
<br />i~~~;! ~
<br />~Ji~i ~ ~
<br />]jUs ~~~
<br />~~~~Lt ~~~
<br />
<br />j~
<br />~
<br />('-l
<br />--
<br />~
<br />
<br />~
<br />I
<br />
<br />CJ)
<br />...J
<br />....J
<br />
<br />-
<br />
<br />:c ..J
<br />O::OLL
<br />>-~cri
<br />IaJ..J
<br />Q...J:::!
<br />w..J:r:
<br />N<(~
<br />(9)-
<br />ILO:r:
<br />...Joa.
<br />w~w
<br />I-t---N
<br />...J
<br />--J
<br /><(
<br />
<br />z
<br />::s
<br />a.
<br />...J
<br /><(
<br />()
<br />
<br />-
<br />
<br />~
<br />I-
<br />()
<br />W
<br />...J
<br />W
<br />
<br />I PROJECT NO: 03-Q12.05A!
<br />
<br />DRAWN BY: KHB
<br />DESIGNED BY: LBM
<br />CHECKED BY: LBM
<br />DATE: 12.3.03
<br />
<br />E1.#1
<br />
<br />8 of
<br />
<br />8
<br />
|