Laserfiche WebLink
<br />r <br /> <br />W.W.M. <br /> <br />2-#5 REBAR <br /> <br />REINF. <br />SEE PLAN <br /> <br /> <br /> <br />F.F. <br /> <br />.' .... . -' '..... <br /> <br />. ., ., <br />.. .. .. <br />... .. ... .. ~ 0.' <br /> <br />116 "J ... .. <br />INT. BRG WALL 2 X 4 <br />(ALSO SHEARWALL) SCALE: N.T.S. <br />REV. 9/03 <br /> <br />(1) #5 REBAR CONT. <br /> <br /> <br /> <br />HICKENED EDGE <br /> <br />REV. 08-20-04 <br /> <br />SCALE: N.T.S. <br /> <br />DOWELS WI 900 <br />HOOK @ FOOTING - <br />SEE FOUND. PLAN <br />FOR LOCATION <br /> <br />z <br />~ <br /> <br /> <br />EXTEND W.W.M. INTO <br />HEADER BLOCK, <br />BEND 900 & HOOK <br />OVER #5 CONT. <br /> <br />#5 VERT. IN SOLID CELL WI <br />900 HOOK INTO FOOTING @ <br />5'-4" OIC FOR STEMWALL <br />< 4'-8" & @ 2'-0" OIC FOR <br />STEMWALL~ 6'-0" <br /> <br />DOWELS WI 900 <br />HOOK @ FOOTING - <br />SEE FOUND. PLAN ~ w <br />FOR LOCATION () <br />= -.J <br />lI')a.. <br />NU) <br /> <br />HEADER BLOCK WI #5 <br />REBAR CO NT. @ SLAB LEVEL <br /> <br />#3 REBAR WI 900 <br />HOOK @ 36" OIC _ <br /> <br />I=tN' <br />, _ ":w ......... Z <br />, -, , . -,. 't""'i - <br />.. ,. b. , ,. r.1 ~ <br />I I ('t') <br /> <br />HEADER BLOCK WI <br />#5 REBAR CONT. <br />@ SLAB LEVEL F.F. <br /> <br /> <br />FINISH <br />GRADE <br /> <br />8"CMU <br />WALL <br /> <br />EXTEND W.W.M. INTO <br />HEADER BLOCK, <br />, BEND 900 & HOOK <br /> <br />,., 3 <br />' .': ; . ',L = OVER #5 CONT. <br /> <br />e. ,. I "," J 00 <br />,. 4:). ... ",. I ,. <br />... ,. ....,,. ,. \. <br /> <br />N <br />...-l <br /> <br />FILLED STEM <br />WALL SOLID <br />WI GROUT <br /> <br />16" <br /> <br />2 # 5 CONT. ON 3" CHAIR <br /> <br /> <br />EXTERIOR BEARING <br /> <br />STEM WALL FTG. <br />l-STORY <br /> <br />SCALE: N.T.S. <br /> <br />EXTERIOR BEARING <br />STEM WALL FTG. SCALE: N.T.S. <br />RAISED FND. < 72" UNBALANCED FILL <br /> <br />HEADER BLOCK WI <br />#5 REBAR CONT. <br />@ SLAB LEVEL F.F. <br />- F.F.~ <br />---- <br /> <br />, I SEE PLAN <br />, , '1-'- <br />..; ... - - :'-'- - ,-..- - - I I <br />, , I <br /> <br />z <br />~ <br /> <br /> <br />3.5" CONC. DRIVE <br />w/CONT. JOINTS <br />10' O.C. TYP. <br /> <br />BLOCK WALL ~ <br /> <br />DOWELS WI 900 - , . <br />HOOK @ FOOTING - <br />SEE FOUND. PLAN <br />FOR LOCATION <br />FINISH ;- ~ <br />GRADE M ~ <br /> <br />FRONT WALL <br />OF GARAGE <br />1/2" EXP. JT. <br />ALIGN DRIVE WI <br />BOTTOM OF <br />RECESS & PITCH <br />DRIVE <br /> <br /> <br />PROVIDE 11/2" X 12" <br />SLOPED RECESS AT <br />GARAGE DOOR <br /> <br />EXTEND W.W.M. INTO <br />HEADER BLOCK, <br />BEND 900 & HOOK <br />OVER #5 CONT. <br /> <br />, <br />~r- ..j.,._. <br />., , <br /> <br />W.W.M. <br />#5 REBAR CONT. <br />(2) # 5 CONT. <br />ON 3" CHAIR <br /> <br />N <br />...-l <br /> <br />FI LLED STEM <br />WALL SOLID <br />WI GROUT <br /> <br /> <br />EXTERIOR BEARING @ GAR. <br /> <br />J <br /> <br />16" J <br /> <br /> <br />STEM WALL FTG. <br />l-STORY <br /> <br />SCALE: N.T.S. <br /> <br />FOOTING @ GAR. DOOR <br /> <br />STEM WALL FTG. <br />1- STORY <br /> <br />SCALE: N.T.S. <br /> <br />PROVIDE 11/2" X 6" WIDE FOR 2 <br />PANEL UNITS, 8" WIDE FOR 3 PANEL <br />UNITS @ SGD LOCATIONS ~ 0'-0" FIN. FL. <br /> <br />#5 REBAR CONT. , . -"..- -'~,-_- -'~r-- <br /> <br />b.... ,. . J( e.."" "f ,. <br /> <br />, ,." lrrr. Ii> ' ,." r...,. ,. .. ,. to ,,, I, ,. <br />".,; ,.,. <br /> <br />1/2" EXP. JOINT <br /> <br /> <br />0'-0" FIN. FL. <br /> <br /> <br />DOWELS-SEE <br />PLAN FOR LOCATION <br /> <br />DOWELS-SEE <br />PLAN FOR LOCATION <br /> <br />(2) # 5 CONT. <br />ON 3" CHAIR <br /> <br /> <br />STEM WALL FTG. SCALE: N.T.S. <br />RAISED FND. BALANCED FILL l-STORY <br /> <br />STEP DOWN @ PORCH <br /> <br />L <br /> <br /> <br />S.G.D. Sill DETAil <br /> <br />STEM WALL FTG. SCALE: N.T.S. <br />RAISED FND. BALANCED FILL 1- STORY <br /> <br /> <br />3.5" <br /> <br /> <br />+1} 16" r16" <br />STEP DOWN BRG. <br /> <br />REV. 9/03 SCALE: N.T.S. <br /> <br />NOTE: <br />STEM WALL MUST BE BRACED PRIOR TO <br />COMPACTING BACK FILL AS FOLLOWING: <br />OPT. 1: SEE TEMP. BRACING DETAIL BBISl <br />OPT. 2: BACK FILL SLAB ON OUTSIDE COMPACTION <br />DURRING FILL PLACEMENT & TO PREVENT BOWING <br />OF WALL. MAY BE REMOVED AFTER SLAB IS POUR <br /> <br />2.x 6"x 8" LONG <br />W/TAPCON ANCHORS (4) <br />3/16" x 31/4. CENTER <br />BLOCK @ FILLED CELL <br /> <br /> <br /> <br />12" BELOW F.F. FOR <br />STEM WALL ~ 6'-0. & 30" <br />BELOW F.F. FOR STEM <br />WALL ~ 8'-0" & > 6'-0. <br /> <br />1 <br /> <br />1 <br /> <br /> <br />10d x 3" <br />@6" O,C. <br /> <br />2x4 STAKE W/MIN. 2'-0" PENETRATION <br />I~TO SOIL @ EA. FILLED CELL FOR STEM <br />WALL ~ 4'-8" @ 4'-0" O/C FOR STEM <br />WALL~ 4'-8" & < 6'-0" @ 2'-8" O/C FOR <br />STEM WALL> 6'-0" & ~ 8'-0. <br /> <br /> <br />TEMPORARY BRACING DETAIL <br /> <br />SCALE: N.T.S. <br /> <br />BRACING NOTES <br /> <br />CD ERECT TEMPORARY BRACING <br />PRIOR TO SETTING & <br />COMPACTING BACKFILL <br /> <br />@ BRACING TO REMAIN IN PLACE <br />UNTIL POURED SLAB IS FULLY <br />CURED <br /> <br /> <br />8" 4" <br /> <br /> <br />STEP DOWN NON BRG. <br /> <br />REV. 9/17/03 TH <br /> <br />SCALE: N.T.S. <br /> <br />DOWELS WI 900 <br />HOOK @ FOOTING - <br />SEE FOUND. PLAN a.. w - <br />FOR LOCATION ~ ~ <br />lI')e.. <br />NU) <br /> <br />HEADER BLOCK WI #5 <br />REBAR CONT. @ SLAB LEVEL <br />#3 REBAR WI 900 <br />HOOK @ 24" OIC <br />_-:~-1-~ . <br />.,.., I_)L...-l Z <br />I ('t')~ <br />EXTEND W.W.M. INTO <br />HEADER BLOCK, <br />BEND 900 & HOOK <br />OVER #5 CONT. <br /> <br />#5 VERT. IN SOLID CELL WI 900 <br />HOOK INTO FOOTING @ 8" O/C <br />OR #7 VERT. IN SOLID CELL WI 900 <br />HOOK INTO FOOTING @ 16" OIC <br /> <br /> <br />~ <br />~ <br />5' <br />00 <br /> <br />DURO WALL <br />@ 16" O/C <br />VERTICALLY <br />8" CMU WALL <br /> <br />NOTE: <br />STEM WALL MUST BE BRACED PRIOR TO <br />COMPACTING BACK FILL AS FOLLOWING: <br />OPT. 1: SEE TEMP. BRACING DETAIL BBISl <br />OPT. 2: BACK FILL SLAB ON OUTSIDE COMPACTION <br />DURRING FILL PLACEMENT & TO PREVENT BOWING <br />OF WALL. MAY BE REMOVED AFTER SLAB IS POUR <br /> <br />(3) # 5 CONT. <br />ON 3" CHAIR <br /> <br />44" <br /> <br />f <br /> <br /> <br />EXTERIOR BEARING <br /> <br />STEM WALL FTG. SCALE: N.T.S. <br />RAISED FND. < 96" UNBALANCED FILL <br /> <br />FOUNDATION NOTES <br />3) SOIL: <br />3.1 MINIMUM ALLOWABLE SOIL PRESSURE 2000 PSF. (VERIFY BY CONTRACTOR) <br />4) CONCRETE: <br />4.1 CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS: <br />3000 PSI (NORMAL WEIGHT). <br />4.2 REINFORCING BARS: ASTM A615 (GRADE 40). <br />4.3 WELDED WIRE FABRIC (WWF): A8TM A185. <br />4.4 DETAIL REINFORCEMENT IN ACCORDANCE WITH ACI 315. <br />4.5 CONCRETE COVERAGE OF REINFORCEMENT: FOOTINGS 3" <br />BOTTOM AND SIDES. <br />4.6 EARTH SUPPORTED SLABS: (INCLUDING EXTERIOR WALK <br />AND DRIVE SLABS) 3 1/2" THICK MIN., REINFORCED <br />WITH 6X6 - W1.4 X W1.4 WWF AT MID-DEPTH OF SLAB. <br />4.7 CONCRETING OPERATIONS SHALL COMPLY WITH ACI STANDARDS. <br />4.8 LAP SPLICE SHALL BE AS FOLLOWS: #5 BAR 25", #4 BAR 20", #3 BAR 15". <br />4.9 SOIL TO BE TREATED FOR TERMITES PER FBC 2001 SECTIONS <br />104.2.6; 104.2.7; 1403.1.6, 1503.4.4; 1816; 1916.7.5; 2303.1.4 & 2304 <br /> <br />GENERAL MASONRY NOTES: <br />1. MASONRY UNITS: 1AW ASTM C90 <br />2. MORTAR: TYPE M OR TYPE S 1AW SBC TABLE 1402.8B IS <br />REQUIRED TO BE TYPE M OR TYPE S <br />3. GROUT: 3/8" MAXIMUM AGGREGATE, 811 - 11" SLUMP <br />3000 PSI OR ASTM C476 <br />4. CONCRETE: 3000 PSI MIN. COMPo STRENGTH AT 28 DAYS FOR <br />FOOTINGS: 3000 PSI FOR SLABS ON GRADE <br />5. REINFORCING STEEL: GRADE 40 MIN. AND IDENTIFIED IN <br />ACCORDANCE WITH ASTM A615, A616,A 70 <br /> <br />TO THE BEST OF THE ENGINEER'S KNOWLEDGE AND BELIEF, THE <br />STRUCTURAL PLANS AND SPECIFICATIONS COMPLY WITH THE <br />FLORIDA BUILDING CODE, SECTION 1606 FOR 120 M.P.H. 3 SECOND <br />GUST, EXPOSURE "B" WIND ZONE (2001 EDITION). <br /> <br />THIS DRAWING AND DESIGN IS VALID FOR 12 MONTHS AFTER THE <br />DATE IS SIGNED AND SEALED, <br /> <br />SIGNED AND SEALED FOR THE STRUCTURAL PORTION OF THIS <br />DRAWING ONLY. <br /> <br />l!) <br />o <br />ON' ~ <br />-l I"- 0:> LI.. t; , <br />-l lDffi OWo <br />('1')", >-al:':! <br />c:;;; ffig:~ <br /><t't a..(/):c <br />oc"o ~J:~ <br />iX~ a..f-a.. <br />g ~ ~6 ~ <br />l.L. ~ ~~ ~ <br />w~ ~ <br />I ~ ;!:d [3 <br />ULJ..: ww~ <br />L5 Cl::c CI:: <br />CO <tf-O <br />(/) 0 :c <br />gt8~~~~ <br />-.J -ria O'l Vi u z <br />o lDWj~ <br />D..lDN 0 .cr: <br /><t't.....O<..?O <br />, c"o..... 2: Z Z <br />o~U<tcro <br />0('1') t3b:ji= <br />'t-ri 2:zS) <br />('I)~ ;:~5 <br />><, ~o~ <br />g w 00 a.. <br />. Z w~ ~ <br />00 (/)z>- <br />.I w<t2: <br />D.. D.. ;!: 0 <t <br />(0 <br /> <br />~ <br />Z <br />00:: <br />OW <br />W <br />(/)z <br />Z_ <br /><i<:J <br />Oz <br />W <br /> <br /> <br /> <br />o <br />~ <br />Z <br />o <br />(/) <br />0:: <br />W <br />> <br /> <br />('I) <br />o <br />~ (/) <br />~ Z <br />N <br />~ 0 <br />~ (/) <br />~ > <br />o W <br />w cr:: <br />::J <br />(/) <br />(/) <br /> <br />W <br />:::! cr: <br />W w ~ ~ t2 <br />f- llJ LI.. f- <br />O <to:::!2: <br />:::! - 0 ~ <br />I- x~cr:o <br />o ~ LI.. U <br />o g:oz~ <br />Z 0.. :::! !i! f- <br /><to<to <br />LlJ ~e:~z <br />,~ <t 2: cr: 25 <br />\..J 0 llJ <t <br /><i W~(/)O <br />I- b;::6~ <br />o ::J llJ - W <br />~ ~ ~ ~ <br />OW(/) llJ Cl: <br />LL <..? z ~ LI.. <br /><t 000 <br />W f-Vicr:f- <br />0:: ~oQ~ <br /><i W :::! ffi 0 <br />:::> ~ 25 ~ c5 <br />r".J::J...J-cr: <br />\..J g ~ ~. ~ <br />(/) -,w<i!O <br /><i! 1:) :; ~ <br /> <br />Cf) <br />-.J <br />-.J <br /> <br />- <br /> <br />:c <br /> <br />>-~ <br />0::- <br />0> <br />1--1-- <br />ZCf) <br />WW <br />>0:: <br />Z () (/) <br />- O-l <br />O~ <br />~ ~ <br />O)~-l <br />o () ~ <br />003 <br />I -.J ~ <br />N CO ~ <br />LO (/) <br />I ~z <br />f'-~O <br />~ VI ~ <br />~ I-- ~ <br />LO 06 <br />~ -.J LL <br /> <br />lI') C() N <br />~ lI') N <br />N r--- ...-l <br />~ 0) 0 <br />('t') ~ <.0 <br />w w w <br />a.. a.. a.. <br /> <br />PB <br />Q) <br />.0 <br />C <br />~ C ...c <br />"- 0 c <br />~ rJ) ~ <br />C ::J <br /><i. ~ I <br />Q) -. I <br />::J <br />E .~ ~ <br />ro ~ ..c <br /> <br />~DD <br /> <br />-.J <br />-.J <br />~ <br />::2: <br />w <br />f- <br />(/) <br />lD <br />o <br />o <br />N <br />.f <br />~ <br />o <br /> <br /> <br />I <br />i <br />I <br />I <br />i <br />I <br />I <br />'0 <br />!v <br />i~ <br />I~ <br />I I <br />10) <br />,0 <br />1"'1"- <br />i~~ <br />i l.O <br />!c[o', <br />,,_! . '" <br />~"~j:;'1 it ~ <br />-! ~~ <br />i<{Oj> <br />lr-"- <br />i <br />-';"-'" I <br />j~! <br />iDI <br />j~1 <br />l-~l <br />t~,1 <br />I ,I <br />1,~i <br />1~1 <br />'fl': OZ <br />):~I ' <br />~I ~~ <br />t'l ~-.J <br />i~,i 0 i:O <br />Ii I <( llJ <br />.: 00::: <br />.. ,;1 -0 <br />1,--,_:! 0::: I <br />i-I O(/) <br />1,,-1 -.J f- <br />JI LL(/) <br />tll <br />'f't I ....J llJ 0 <br />L.I c:(~g <br />I I 0::: <br />' 'f-zllJ <br />Zot: <br />llJo::J <br />U",(/) <br /> <br /> (V) a:: 0.: <br /> 0 <br /> wa:: <br /> 0 W zo <br /> ~u <br /> -tw <br /> N 0 :2::2: <br /> >-0 <br /> ZI <br /> 0 I- <c (J) <br /> ~ <br /> ~:2: <br /> ~ 0 o 0 <br /> Z ~B: <br /> 0 6~ <br /> ow <br />w LL I- a::(/) <br />o..~z <br />~ >< :r: woo <br />a::u- <br /> w~~ <br /><{ 0 CJ a::lw> <br />f-~O <br />Z 0::: ~o::<c <br /> >-~g <br /> >- <Cwa:: <br />Z :2:::cg <br /><{ a.. ~f-lJ.. <br /> :5f--l <br />-l 0 o..~~ <br /> (/)If- <br />0.. -f-Z <br /> 0 I-l.l.J <br /> f-~U <br /> <br />SHEET NO. <br /> <br />0.. <br />0::: <br />o <br />U <br />w <br />::2: <br />o <br />I <br />(/) <br />::J <br />lD <br />o <br />o <br />N <br /> <br />8-1 (8) <br /> <br />LAST PLOT <br />DATE:ApriI15,2005 <br /> <br />@) <br /> <br />NOTE; IT is THE COI'.TRACTORS RESPONSIBIUTY TO REVIEW ALL <br />DRAWINGS BEFORE CONSTRUCTION BEGINS. DANSCO <br />ENGINEERING, LLC IS RESPONSIBLE FOR THE STRUCTURAL <br />INTEGRITY OF THIS PROJECT ONLY. ANY DiSCREPANCY BElWEEN <br />FIELD CONDITIONS, OTl1ER DESIGN PROFESSIOt\ALS' SHOP D~AWINGS, <br />CONTRACTORS' BUILDING METHODS, AND THESE SIGNED AND SEALED <br />DRAWINGS MUST BE B~OUGHT TO THE AlTEr'HlON OF DANSCO <br />ENGINEERING, LLC PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. <br /> <br />.. <br />, <br />, <br />/ <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />1 <br />1 <br />\ <br />\ <br />\ <br />\ <br />, <br />, <br />, <br />, <br />, <br />, <br /> <br /> <br />, <br />, <br />, <br />, <br />, <br />, <br />\ <br />\ <br />\ <br />\ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />/ <br />/ <br />..,' <br /> <br />PLACE SEAL HERE DE #250989 <br /> <br />------ <br />