Laserfiche WebLink
<br />. i <br /> <br />Proposal <br /> <br />Date Dee 11, 2007 <br /> <br />John L. Smith Construction, Ioe. <br />4240 Coats Rd. <br />ZephyrhiDs, FL 33541 <br />(813) 782-0470 <br />CBC 059519 <br /> <br />Proposal Submitted To <br /> <br />Work To Be Performed At <br /> <br />Name WeIlesy Devel, Town Center <br />Street 5518 - 5540 Gall Blvd. <br />City Zephyrhills, FL 33542 <br />Telephone # <br /> <br />Street Same <br />City <br />Date of Plans N/A <br />Architect <br /> <br />We hereby propose to furnish all materials and labor for the completion of Repairs to wood walkway and <br />railing over retention pond. See attached sheets. <br />All material is guaranteed to be as specified, and the above work to be completed in accordance with the <br />drawings and specs submitted for above work. All work and materials to meet local industry standards and <br />existing codes in effect at date of this proposal. The above work to be performed for the sum of <br />Forty five thousand, one hundred fifty four and oonoo Dollars ( $ 45,154..00 ) <br />With payment to be made as follows: To be agreed upon at acceptance of proposal <br />Any alterations or deviations :from the above specifications involving extra co~ will be executed only upon <br />written orders, and will become an extra charge over and above the estimate. All agreements contingent upon <br />strikes, accidents or delays beyond our control Owner to carry fire, wind and all other necessary insmance <br />required upon above work. Workers Compensation and Public Liability Insurance to be taken out by builder. <br /> <br />Cost of collection and attorneYs fees in the event of any default by the Owner and in the event that the Builder <br />must initiate any collection proceedings or must engage attorneys for any purpose whatsoever relating to this <br />agreement, including but not limited to seeking the enforeement of its terms and conditions, 1he Owner <br />acknowledges, agrees, confirms and warra1lb, that 1hey are responsible for all costs and attorney's fees incurred <br />bytheBnilder. ~ <br /> <br />Respectfully submitted _ -/ ~ <br />Per John L. Smith Con('truction <br />This proposal may be withdrawn by us if not accepted within 10 days <br /> <br />Acceptance of Proposal <br />We, 1he undersigned have read this proposal and do agree to the terms and conditions as listed. above and to any <br />attachments, if included. We authorize you to do 1he work as . ed. Payment will be made as outlined in this <br />proposal. <br /> <br />Date /7-/J3/R7 <br /> <br />