<br />~"..~ TUC/(~k:..
<br />...~ '\. ........... 4...../fl).. ,
<br />.. .. .-.. ".I
<br />.~ .0;; \' \ F ! C.... +. OLIVER TJ:CH~OLOGIE5, INC.
<br />. · ..' ,... ..rl II. to. J
<br />.. .'~ )>',.. FLORIDA INSTALLA110'lINSTRUCTIONS FOR THE
<br />! .t, No, 15896 <;0\ ~ MODEL 1101 "V" SERIES ALlisTEEL FOUNDATION SYSTEM
<br />· . . ...L~ MODEL 1101"1{,' (STEPS 1.1'"
<br />..* : 1'1 : i'~ · MODEL 1101-L"11" LONGITUDINAL ONL Y:
<br />· : :; FOLLOW STEPS 1.9
<br />:~ ~ :' Q;~:
<br />~."'"' '. STATE OF ... ~(f,: FOR ADDfNG LA TERAL ARM:
<br />.:0 "ij'lGI ERS STAMP '.. " I.{.r::, Follow Steps 10-15 ENGINEERl:l STAMP
<br />
<br />+.j$:, .... 0 R\..... ("r-,"...'" .
<br />1. SPE~~~.hi~~~\i~ES: If the following conditions occur - STOP! Contect OliverTechnologl t 1-800-284-74.17 :
<br />a) Pier hefl1h\~~<fs 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96"
<br />e) Location Is within 1500 feet Of coast
<br />
<br />
<br />~LLATION OF GROUND PAN
<br />
<br />, 2. Remove weeds and debris In an approximate two foot sq!)are to expose firm soli for each ground pan (C) .~
<br />3. Place ground pan (C) directly below chassIs I-beam. Press or drive pan firmly Into soil unUl flush with or below soil.
<br />SPECIAL NOTE: The longitudinal "V" brace system serves a6 a pIer under the home and should be loaded as any
<br />other pier. It is recommended that after leveling piers, and one~half inch (1/2") before home is lowered completely on
<br />to piers, complete steps 4 through 9 below.
<br />
<br />INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM
<br />NOTE: WHEN INSTALLING THE MODEL 1# 1101-L"V" LONGITUDINAL SYSTEM!2l:iLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECT/ON IS
<br />REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT, TYPE OF ANCHOR PER 'SOIL CLASSIFICATION. IF PROBE TEST
<br />READINGS ARE BETWEEN 175 & 275 A 5 FOOT ANCHOR MUST BE USEO. IF PROBE TEST READINGS ARE BETWEEN 276& 3!iO,A 4 FOOT ANCHOR
<br />MAY BE USED, USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON
<br />HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLO~IOA REG.) .
<br />
<br />4. Select the correct square tube brace' (E) length for set ~ up (pier) height at support location. (The 18"tube is always'
<br />used as the bottom part of the longItudinal arm), Note: Either tube' can be used by itself, cut and drilled to length as long as a
<br />40 to 45 degree angle Is maintained,
<br />
<br />PIER HEIGHT
<br />(Approx. 45 degrees Max.)
<br />
<br />7 3/4" to 25" 22" ~, 18"
<br />24 3/4" to 32 1!4" ~2" l' 18" ,.
<br />.. h.:~ ...
<br />33" to 41" 44" 18" -..:-
<br /> ...
<br />40" to 48" 54" ~. 18"
<br /> ,. '-<.:..'.~
<br />
<br />1.25" ADJUSTABLE
<br />Tube Length , ..
<br />
<br />1,50" ADJUSTABLE
<br />Tube Length
<br />
<br />5. Install (2) of the 1,50" square tubes (E {18" tube} ) Inlo the "U" bracket (J), insert carriage boll and leave nut/oose for final
<br />adjustment.
<br />6. Place I-beam cf~~tor (F) loosely OIl the bottom flange-of t/lel-beam, .... .
<br />7. Slide the selecteei' 1.25" tU.l;ll:! (E)Iritoa1.50" tube (E) and att~ch tol-beall'l ccmtlectors (F)-~I;ld fa.sten Iqosely.,wilhboirandnut.
<br />8, Repeal steps 6 through 7lQ~create.'the "V" pattern of'lhe square tubes loo5ely,.ln,'Plac~. The angle Is n6fto eixc~45
<br />degree and not below 40 de9rees, ' , .,.,
<br />9, Af1er all bolts are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"~'14 x.;3/4" self-lapping screws In pre~drllled holes,
<br />
<br />INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM
<br />THE MODEL 1101 "V" (LONGITUDINAL & LATERAL PROTECTION' ELIMINATES THE NEED FO~MOSt STABILIZER PLATES & FRAME TIES.
<br />NOil:: THE USE OF THIS SYSTEM REQUIRE:S~VE:RTJCAL TIES SPACED AT 5'4". '
<br />FOUR, FOOT (4" GROUND ANCHOR MAY BE USED EXCEPT WHERF{THE HOME MANUFACTURER SPECIFIES DIFFERENT.
<br />
<br />10, Install remaining vertiel'lJti~.down straps and 4' ground anchors.per home manu~acturer's inl:!..tr.~c;t1gns.J'(()!~:QenterUne:~,.
<br />anchors to be sized accor6~,to ~QU torque condition, Any manufacturer's specifications for (3ide)l'iall arichorloa(rs~iii':e&tess of
<br />4,000 Ibs. require a 5' anchor. " . . .
<br />11, NOTE: Each system is required to have a frame tie and ~1I/zer,~ttached at each latera! arm stabilizing location. This frame Ue &
<br />stabilizer plate needs to be located within 18" from of center groond pan,., " ,
<br />12. Select thes;orrect square tube brace (H) length for set-up/ateral transverse at support location. The lengths come ine'ilher 60" .'.
<br />or 7?tlen~Ds;''(WJth the 1.50" tube FlS the bottcxrltube, and the 1,;.25" tube as thf3 inserted tube,),'
<br />13. Inst!'n~the'J.50 transverse brace (H) to the ground pan connector',(D) with bolt and nul.
<br />14, Slide 1.25" transverse brace into the 1,50~'brace and attach to adjacent I-beam connectod I ) with bolt and nut.
<br />' , ecure, ransverse arm 0, ransverse arm uSing our x se -appmg screws m pre- r e as.
<br />
<br />
<br />MANUFACTURED HOUSING FOUNDATION SYSTE:MS
<br />A DIVISION OF OLIVER TECHNOLOGIES, INC.
<br />1-800.284.7437
<br />
<br />Telephone: 931-7ge-455J;
<br />Fax: 931-796-6611
<br />WWW.ollvertechnologles.com
<br />
<br />J
<br />.<
<br />
|