Laserfiche WebLink
<br />..".'C TUCI\:'~;... <br /> <br />".~ ,-. .,._t...,. (.....I'l) ". <br />.. .... .... <br />'It ,..., \ Fie ._', ". <br /> <br />.... ,,' '?-- -'1 ~'. ~. <br /> <br />. . <v "'. . <br /> <br />: .iJ No. 15896 -;:~'. ~ <br />. . ~ . <br />:.* : * : r( i <br />., : : -; <br />~"O ~ . : cq <br />p~ .. STATE OF .. !.u. <br />". 0 'hGINEERS STAMP ... I,t./~' <br />. ~.. ^'" '10," I <br /> <br />\~"".f 0 R' .> C~".'" <br />1. SPE~~~.hi~~"\J~~S: If the following conditions occur - STOP! Contact O!lverTechno!ogl t 1-800-284-74::17 : <br />a) Pier heT~~Js 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" <br />e) Location Is within 1500 feet of coast <br /> <br />~ <br />. OLIVER TeCHNOLOGIES, INC. <br />FLORIDA INSTALLA1IO~ INSTRUCTIONS FOR THE <br />MODEL 1101 "V" SERIES AlJJ;STEEL FOUNDATION SYSTEM <br />MODel 1101""" (STEPS 1-1!J} <br />MODEL 1101-L"I(" (ONGfrUDfNAL ONL Y: <br />FOLLOW STEPS 1.9 <br />FOR ADDfNG LA TERAL ARM: <br />Follow Steps 10-15 <br /> <br /> <br />ENGINEERS STM,1P <br /> <br />~LLATION OF GROUND PAN <br /> <br />. 2. Remove weeds and debris In an approximate two foot sql,lare to expose flrmaoll for each ground pan (C) , <br />3, Place ground pan (C) directly below chassis I-beam, Press or drIve pan firmly Into soli until flush with or below soil. <br />SPECIAL NOTE: The longitudinal "V" brace system serves as a pIer under the home and should be loaded as any <br />other pier. It is recommended that after leveling piers, and one-half inch (1/2") before home is lowered completely on <br />to piers, complete steps 4 through 9 below, <br /> <br />INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM <br />NOTE: WHEN INSTALLING THE MODEL t# 1101-L"V" LONGITUDINAL SYSTEM DNU, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS <br />REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT,TYPE OF ANCHOR PER 'SOIL CLASSIFICATION. IF PROBE TEST <br />READINGS ARE BETweEN 175 & 275 A 5 FOOT ANCHOR MUST BE USED. IF PROBE TEST READINGS ARE BETWEEN278& 350~A 4 FOOT ANCHOR <br />MAY BE USED. USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON <br />HOMES SUPPLIeD WITH VERTICAL TIE CONNECTION POINTS (PER FLO~IDA REG.) . <br /> <br />4. Select the correct square tube brace (E) length for set - up (pIer) height at support location. (The 18" tube Is always)' <br />used as the bottom part of the longitudinal arm). Note: Either tube' can be used by Itself, cut and drilled to length as long asa <br />40 to 45 degree angle is maintained, <br /> <br />PIER HEIGHT <br />(Approx. 45 degrees Max,) <br /> <br /> , '~ <br />7 3/4" to 25" 22" ,q, 18" <br />24 3/4" to 32 1/4" , ,32:1 l' 18" , ., <br />. ""t: 'J-' '. <br /> r.,i. . 18" --- <br />33" to 41" 44" " .. <br />40" to 48" 54" 1" 18" " <br />, ~, .....,..-" <br /> <br />1,25" ADJUSTABLE <br />Tube length <br /> <br />1 ,50" ADJUSTABLE <br />Tube Length <br /> <br />5. Install (2) of the 1,50" square tubes (E {18" tube}) Into the "u" bracket (J), Insert carrIage boll and leave nut loose for final <br />adjustment. <br />6, Place I-beam cr~tor (F)Ioosely oncthe bottom f1angeA~f1he:J~beam, ., ... .." , . " , <br />7. Sf/de the selectea 1.25" tvp~(E)lritoa1.50" tube (E;) and att~ch tol-bearl) conlilectof(l (F),a!ld fasten IqoselYWlthbollandnut. <br />8, Repeat steps 6 through 7'\O~creale,'the "V" pattern of'the square tubes looselllh'.'.Plac~. The'angle is not to exc~45 <br />degree and not below 40 degrees, ' . .; <br />9, After all bolts are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"-'14 x 3/4" self-tapping screws In pre~drilled holes, <br /> <br />INSTALLATION OF LATERAL TELE~COPING TRAN$VERSE ARM SYSTEM <br />THE MOOE'l1101 "V" (LONGITUDINAL & LATERAL PROTECTION) ELIMINJl.TES THE NEED FO~\fJlOST STABILIZER PLATES & FRAME TIES, <br />NOT/!: THe USE OF THIS SYSTeM REQUIRESNERTICAL TIES SPACED AT 5'4". ' <br />FOU~FOOT (4'} GROUND ANCHOR MAY BE USED EXCEPT WHERF:'THE HOME MANUFACTURER SPECIFIEifDIFFERENT: <br /> <br />10. Install remaining vertlc~rtl~-down straps and 4' ground anchors,.per home manufacturer's inf!t~\l,c:t1pnl:l)tQ!g:cgeIlterIJmL:, <br />anchors to be sized accor6~,.to flQU torque condition, Any manufacturer'sspecmcatioris for ~ide>>,all arichorloaa~~ii;:~e~ss of <br />4,000 Ibs. require a 5' anchor.' " " '. <br />11. NOTE: Each system Is required to have a frame lie and stit:)fUzer.~ttached at each lateral arm stabilizing location. This frame lie & <br />stabilizer plate needs to be localed within 1 B" from of center ground pan,. ~ , ".,. .' , <br />12. Select the gorrect square tube brace (H) length for set-up .lateral transverse at support lpcatlon, The lengths come in either 6'0" <br />or 7?tlen9lns;'(Wlth the 1,50" tube !3S the bottcx.;l tube, and the 1(25" tube as the inserted tube.) , <br />13, Inst~l~the;}t,50 transverse brace '(H) to the ground pan connectot(D} with bolt and nul. <br />14. Slide 1.25" transverse brace into the 1,50",brace and attach to adjacent I-beam connector( I) with bolt and nut. <br />' a, ~ecure, ransverse arm 0, ransverse arm uSing our x se -applng Screws In pre- r e es, <br /> <br /> <br />MANUFACTURED HOUSING FOUNDATION SYSTEMS <br />A DIVISION OF OLlV,ER TECHNOl.OGIES, INC. <br />iM800.284M 7 437 <br /> <br />Telephone: 931-796-4,55,1'; <br />Fax: 931-796-661'1 <br />www.ollvertechnologl9s.com <br /> <br />J. <br />.0;'. <br />