Laserfiche WebLink
<br /> <br />Lab. Number 4581 <br />April 8, 2005 <br />Report Number 19 <br />File Number 05-116 <br />Page 2 of 4 <br />D-7007 <br /> <br />MATERIAL CHARACTERISTICS <br /> <br />Hardware: (continued) <br /> <br />Jumuil Description Location <br />Two surface mOWlt metallic keeper, with no I.D. marks one at fixed meeting rail, 7" from each end <br />Two 333/4" long vinyl balance cover, with no L D. marks one at each frame jamb <br />Two nylon block shoe clip, with no lD. marks one at each frame jamb <br />Two 2 518" long ~yl vent stop. with no 1.0. marks at each upper frame jamb <br />Two metanic pivot bar, with no I.D. marks one at each end of vent bottom rail <br /> <br />Weepboles: <br />ti VesCY; lion Location <br /> <br />Four 1" by 1/4" weep bole with plastic baffles. at fr8me sill flange 3 Y2", 5",48 W' and 493/4" <br /> <br />Four <br /> <br />3/8" by 118" weep slot <br /> <br />Two I" b slot at fralDe' 33/4" and 493/8" from left <br /> <br />Muntins: None <br />Mullions: None <br />Reinforcement: One 33 3/4"longaluininum reinforcement, drawing No.5 114. inside vent jamb rail, (total of two ). One <br />48" long aluminum reinforcement. dr8wing No.5103, inside fixed meeting rail. One 45 3/4" long aluminum <br />reinforcement. drawing No. 5114. inside vent top and bottom rail, (tota.) of two). One W by 1/]6" by I Yz" long <br />aluminum plate, drawing No. SI1S, at each end of fIXed meeting rail fastened with the same size and type of assembly <br />screws. <br />Sealants: Fixed meeting rail at eacb end were sealed with a clear colored seam sealer, <br />Pads: None <br />Screen: Water resistance test conducted with and without a fiberglass mesh screen installed. <br />Additional Description: The metallic pivot bars were fastened with two NO.6 by I" flat head self drilling screws. <br />Unit Installatioo: Test Wlit installed in a 2 x 12 pressure treated wood test buck with a 2 x 4 pressure treated buck strip. <br />Frame installed with a single row of 10 by 2" pan head sheet metal screws at frame head and frame jambs. Location of <br />installation screws are as follows: frame head from the left, 6 5/8",26518 and 46 5/8"; frame jambs from the bottom, <br />6518", 20 Y2", 34 1/8",44 118",547/8" and 65 5/S". There were no installation screws in frame sill. <br />Product Markings: None <br /> <br /> <br />at frame sill. 3 W' and 49 5/8" from left <br /> <br />OFFICIAL TEST RESULTS <br /> <br />Paragraph Number <br /> <br />Title of Test <br /> <br />Measured <br /> <br />Allowed <br /> <br />2.1.2 <br /> <br />Air Infiltration Test: (ASTM E283-96) <br />at 1.57 psf O.llcfmlsq.ft, (1.87 cmhlm:Z) <br /> <br />Passed <br />0,3 (5.49) maximum <br /> <br />Note: The tested specimen meets or exceeds the performance levels specified in specification reference <br />for air infiltration. <br /> <br />2.1.3 Water Resistance Test: (ASTM E547.961E33I) <br />with and without screen, no leakage at 9.00 psf (431 Pa) <br /> <br />Passed <br />2.86 (137) minimum <br /> <br />~4P <br /> <br />.f ~IHf' <br />