My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-7454
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:47:38 PM
Creation date
4/30/2008 11:14:52 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7454
Building Department - Name
TC FIRST BABTIST CHU
Address
38300 5TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECOVER SYSTEM LIMITATIONS: <br /> <br />1. The moisture content of an existing roof system shall be in compliance with applicable Building <br />Code. <br /> <br />2. Lightning rods shall be masked prior to foaming. Lightning rod cables shall not be embedded in <br />the polyurethane foam and should be removed prior to foaming. Electrical and mechanical <br />conduits should be relocated or raised above the finished roof surface. . <br /> <br />3. Prior to application. all existing roof surfaces used as a bonding substrate shall be tested for uplift <br />resistance in compliance with Testing Application Standard TAS 124 to the calculated design <br />pressure of the roof deck. <br /> <br />GENERAL LIMITATIONS: <br /> <br />1 . Fire classification is not part of this acceptance; refer to a current Approved Roofing Materials <br />Directory for fire ratings of this product. <br /> <br />2 Spray polyurethane foam shall not be sprayed when ambient temperature is within 5 degrees of the <br />dew point. Ambient humidity applications limits shall be as listed in Table 1 herein. Contractor <br />shall monitor and record environmental conditions in the Job Log in compliance with RAS 109. <br />Job Log shall be maintained at the job site and accessible to The Building Official. <br /> <br />3 Flashings and waterproof coverings for expansion joints shall be of compatible materials and in <br />accordance with North Carolina Foam Industries published literature. <br /> <br />4 Miscellaneous materials such as adhesives, elastomeric caulking compounds, metal, vents and <br />drains shall be a composite part of the roof system and shall be compatible with the foam and <br />coating. <br /> <br />5 All attachment and sizing of perimeter nailers, metal proItle, andlor flashing termination designs <br />shall conform to Roofing Application Standard RAS 111 and the wind load requirements of <br />applicable building code. <br /> <br />6 Existing low slope roof systems shall be tested for uplift resistance in compliance. with Testing <br />Application Standard T AS 124 to the calculated design pressures of the field, perimeter and comer <br />areas, determined in compliance with applicable Building Code prior to recover. The maximum <br />designed pressure listed herein shall be applicable to the roof field pressure zone. Enhanced <br />pressures zones (i.e. perimeters, and corners) may be met through testing of the existiJ;lg roof <br />system in accordance with T AS 124. <br /> <br />END OF THIS ACCEPTANCE <br /> <br />s <br /> <br />NOA No: 06-1031.06 <br />Expiration Date: 03107/12 <br />Approval Date: 02/01107 <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.