My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-6721
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-6721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:49:19 PM
Creation date
5/6/2008 9:09:11 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-6721
Building Department - Name
HIDDEN RIVER OF PASC
Address
3536 HIDDEN RIVER
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FLORIDA <br />CONTRACTORS <br /> <br /> <br />COMMERCIAL <br />CORPORATION <br /> <br />P.O. Box "1621 <br />Palm Harbor, FL 34682-1621 <br />(727) 781-4n8 <br />Fax (727) n2-7215 <br /> <br />Proposal <br />Date: <br />Page: <br /> <br />State Certified <br />Building Contractors <br />CBC 033225 <br />206-1205 Revised <br />April 11,2007 <br />1 of 1 <br /> <br />Customer: <br />Address: <br /> <br />Project: <br />Manager: <br /> <br />Metro Development Group, LLC <br />2502 N. Rocky Point Dr., Suite 1050, Tampa, FL 33607 <br /> <br />Hidden River Phase 1: Hardscaoe <br />Greg Yurcus 813-288-8078 (0),813-288-8178 (fax) <br /> <br />Description of work performed in this proposal: <br /> <br />Labor and material to construct: <br />Hardscape <br /> <br />Includes: See attached Landscape and Hardscape Bid Forms. <br /> <br />Not Included: County/City impact fees. Ena. Plans, survevina wall centerline, site work, fencina removal, <br />dewaterina. testina. fill dirt, utility extensions, construction water. <br /> <br />Cost of Project: <br /> <br />1) <br /> <br />Hardscape <br /> <br />(see attached Bid Form Estimates) <br /> <br />$ <br />$ <br /> <br />38,855.00 <br />38,855.00 <br /> <br />Total Project Costs: <br /> <br />Start Date: <br /> <br />We can start as soon as permits are received, site is final graded, wall centerline <br />and grades have been staked. <br /> <br />Payment procedures: <br /> <br />Monthly invoices <br /> <br />If you have any questions pertaining to this proposal please contact me at 727-409-0455 (M) <br /> <br />We thank you for your business, <br /> <br />~ <br /> <br />Bob Butler <br /> <br />CUSTOMER'S ACCEPTANCE: <br /> <br />Signature <br /> <br />Date <br /> <br />-price subject to change based on suppliers availability <br />
The URL can be used to link to this page
Your browser does not support the video tag.