Laserfiche WebLink
<br />.)Cttf-lrt/~ L-VIVJ I l'\..Uv' .L'-/IV <br /> <br />SCtlAPfR ROCJFING <br /> <br />8949 Gall Blvd. Zephyrhills, Fla. 33541 Phone: 813-782-0920 Fax 813-715-4875 <br />ST A'rE REGISTERED BUILDING AND ROOFING CONTRACTOR # RB0032524, RC0056763 <br />serv~FlorL.da)1rf~ ftOWl..lW E:r B~S.::.ru:.e.-1976 <br /> <br />August 17, 2007 <br /> <br />EXTERIOR WINDOWS AND DOORS: <br />. Install New Front Entrv Door - 3'0" x 6'8" pre-hung exterior clad doors on antirotjambs, with dead bolt, and keyed entry, <br />Door, Frame, and Hardware allowance $ 1,100.00 <br />. Remove rear window and install Rear Entry Door - 3'0" x 6'8" pre-hung exterior clad doors on antirotjambs, with dead bolt, <br />and keyed entry. Door, Frame, and Hardware allowance $ 320.00 <br />. Install 10' wide x 7' high, standard, steel Sectional overhead door <br />. Remove and replace all residence windows with Aluminum, Single Hung, Insulated, Tinted, lover 1, windows <br />. Install New Opening and 2- #24 SH window set in Exposed Porch Wall <br /> <br />PLUMBING <br />. Relocation of Washer supplys and drain to GarageIHouse common Wall <br />. Stubb in only of future toilet and sink in D~eas. <br />. Water heater to remain ~ \oc..c~-+e- ~ <br /> <br />ELECTRICAL: <br />. Electrical work: <br />. Service changes and panel connections for: <br />. (2)- 4'- 2 bulb Garage fluorescent lights. <br />. (8)-110 volt interior outlets .48" from floor <br />. (2)-IIOVolt GFI outlets <br />. (2)- Outside double floods <br />. (I) 220 outlet and 110 volt changes to existing panel for Washer/Dryer unit <br />. AlC supply and hook up <br />. (3) 110 volt home runs to existing panel <br /> <br />MISC. <br />. 4 pes. 1/2" cdx plywood Storage deck in attic. <br />. Install pull down access stairway <br /> <br />HVAC. <br />. Install 3 Ton Heat pump High Efficiency (13 SEER) <br />. Digital Thermostat <br />. Engineered duct with white grills <br />. Split system with Air Handler in garage attic <br /> <br />. ALLOWANCES: <br />. ALLOWANCES HA VE BEEN <br />BE FULLY DETE D. <br />AFTER TOTAL AC AL P <br />WILL BE MADE 0 A C <br />COSTS TO THE OW R. <br />. ADDmONAL WORK COST ABOVE STA 'ED 'ANC :s WILL BE <br />PERFORMED ON A C PLUS A CTOR E BASIS ( TO CU~1l WILL <br />INCLUDE 20% CON~ TOR FEE) AND BILLED TO THE ~~, ftDOVE AND <br />BEYOND THIS AGREEMENT. <br />PAGE 2 OF 3 18 x 33 block gimige.- <br />longstreet wps.doc <br /> <br /> <br />