My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-7164
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:48:27 PM
Creation date
5/7/2008 9:49:23 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7164
Building Department - Name
GALL BV LAND TRUST
Address
6020/6030/6038 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'------" <br /> <br />,----' <br /> <br />Lie # eee 029579 <br /> <br />GEORGE KONTOS RQOFING, INC. <br />P.O. BOX 547. <br />TARPON SPRINGS, FL 34688-0547 <br />FAX 937-6017 <br /> <br />938-6900 <br /> <br />934-9451 <br /> <br />BONDED / INSURED <br /> <br />PROPOSAL & CONTRACT <br /> <br />GALL BOULEVARD LAND TRUST Date: 10/19/07 <br />ANTHONY SARAVANOS <br />350 HARBOR PASSAGE <br />Clearwater,F1a. 33767 Telephone:643-8922 <br />Job Address: Zephryhills shopping plaza 6020,6030,6038 Gall Blvd. <br /> <br />We are pleased to submit the following proposal for labor & material as necessary to complete the <br />following:FLA T DECK REROOF <br /> <br />.. <br />10( <br /> <br />SCOPE OF WORK: Certainteed specification GMS-C-B3 <br />Remove existing built up roofing and insulation to steel decking. <br />Over existing steel decking install one(l) layer of I" isocyranurate rigid board'~sulation <br />And.one(l) layer of~" dens deck rigid board insulation with approved fasteners and plates. <br />Install with hot asphalt one(l) layer offlexiglass fiberglass base sheet over which mop with hot <br />asphalt, one (1) ply of type VI fiberlgass felt. Over entire felts install with hot asphalt one(1) layer <br />of modified bitumen granulated membrane. Granulate all seams. <br />Install new modified bitumen membrane at walls with fibered cant strip ,extend up and over <br />parapet as required. <br />Install new 26 ga. galv. eave drip, coping cap around perimeter. <br />Demo six alc and/or chiller units non working and haul off. <br />Demo existing curb openings, attach new steel decking to fill opening. <br />Dem0existing steel beam assembly and electrical panel not in use and haul off. <br />Demo 15 pitch pans not in use . <br />Reflash all remaining existing curb units with new modified membrane flashing. <br />Demo existing scupper boxes @ reat' of bldg and install new. Install tapered cricket panels to <br />provide slope to scupper openings. <br />Provide manufacturers 15 year No Dollar Limit Warranty, labor and materials <br /> <br />AlC, Electrical disconnect & reconnects by other at owners expense. <br /> <br />W~A.RR~~T~-: C~~~teed marlUia~~rers15'ye~rN~dclla;Limitb~~dfr(;"m-manufacturer <br /> <br />P A Ylv1ENT: Draw schedule provided upon contract signing. <br /> <br />ACCEPTED: The above prices specifications and conditions are hereby <br />accepted. You are authorized to do the work as specified. The above <br />contract is based on SF NET. (See reverse side). <br />Payments will be made as outlined above. <br />this proposal is valid for Days. <br /> <br />LABOR & MATERIAL $ <br />ALTERNATE #1 $ <br />ALTERNATE #2 $ <br /> <br />\ro;ooo,oo <br /> <br />SUBMITTED BY: <br />ACCEPTED BY: <br /> <br />/~~ <br />'-- -::l-, .. t . <br />. GEO _E TOS ROOFING, INC. <br /> <br />CCC029579 DATE <br />DATE <br /> <br />" 0 - t<=\ - 0-, <br />
The URL can be used to link to this page
Your browser does not support the video tag.