Laserfiche WebLink
<br />PG T Industries <br /> <br />NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED <br /> <br />A. DRAWINGS <br />1. Manufacturer's die drawings and sections. <br />2. Drawing No 6223, titled 2" Heavy Wall, Elevations Aluminum Tube Clipped <br />Mullion, Sheets 1 through 5 of 5, dated 04/28/00, with revision "C" on 05/03/06, <br />prepared by PGT Industries, signed and sealed by Robert L. Clark, P.E. <br /> <br />B. TESTS <br />1. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, T AS 202-94 <br />2) Large Missile Impact Test, FBC, TAS 201-94 <br />3) Cyelk Loading Test, per FBC, TAS 203-94 <br />along with installation diagram of a pair of fixed aluminum windows (00 <br />configuration) 60" x 54" mulled together with a Ix 2 x std. wall mullion, prepared <br />by Fenestration Testing Laboratory, Inc., Test Report No. FTL-2902, dated <br />01/05/01, signed and sealed by Antonio Acevedo, P.E. <br />HSubmitted under NOA# 04-0528.06" <br />2. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, TAS 202-94 <br />2) Large Missile Impact Test, FBC, TAS 201-94 <br />3) Cyclic Loading Test, per FBC, TAS 203-94 <br />along with installation diagram of a pair of fixed aluminum windows <br />(OOconfiguration) 80" x 76" mulled together with a Ix 4 x std. wall mullion, <br />prepared by Fenestration Testing Laboratory, Inc., Test Report No. FTL-2903, <br />dated 01/05101, signed and sealed by Antonio Acevedo, P.E. <br />"Submitted under NOA# 04-0528.06" <br />3. Test reports on 1) Uniform Load Static Air Pressure Test, per FBC, T AS 202-94 <br />2) Large Missile Impact Test, FBC, TAS 201-94 <br />3) Cyclic Loading Test, per FBC, T AS 203-94 discussed <br />along with installation diagram of a pair of fixed aluminum windows with a <br />transom lite (0/00 configuration) mulled together with a Ix 2 x W' wall vertical <br />and a 2 x 6" x 1/4" wall horizontal mullion, prepared by Fenestration Testing <br />Laboratory, Inc., Test Report No. FTL-2975, dated 01123/01, signed and sealed <br />by Antonio Acevedo, P.E. <br />"Submitted under NOA# 04-0528.06" <br /> <br />C. CALCULATIONS <br />1. Revised Anchor Calculations and structural analysis, complying with FBC-2004, <br />prepared by PGT Industries, dated 01123/06, signed and sealed by Robert L.Clark, <br />P.E. <br /> <br />~ <br /> <br />Jaim~ I>:-Gascon, P.E. <br />Chief, Product Control Division <br />NOA No 06-0125.08 <br />Expiration Date: June 28, 2011 <br />Approval Date: June OS, 2006 <br /> <br />E -1 <br />