Laserfiche WebLink
<br />. <br /> <br />Pl_UMBING SPECIFICATIONS <br /> <br />1,1 BRIEF DESCRIPT:ON OF WORK <br />A. A Complete waste system including but not necessarily limited to drains, venting, fixture <br />connections and septic system as indicated on drawings. Drawing scales prohibit the <br />indications of all offsets, fittings, sleeves and similar items, however, these items shall be <br />provided by this subcontractor at no extra cost to the owner. It is the intent that the work <br />shall be complete in every respect and that any material or work not specifically <br />mentioned or shown on the drawings but necessary to complete the work shall be <br />provided. <br />B. Hot and cold water piping systems including rough-ins, connections to trim and to water <br />utility service. <br />C. All fixtures and trim. Verify with owner. <br />D. A totally functioning plumbing system, tested, adjusted and placed in satisfactory <br />operating condition by the contractor. The system shall fit within the allotted space with <br />adequate clearance for servicing, operating and adjusting. <br /> <br />1,2 CODES, PERMITS, AND FEES <br />A. Standard Plumbing Code, Standard Building Code, local codes and ordinances, <br />B. Obtain required permits, inspections and pay required fees for the work of this Section. <br /> <br />1 .3 WARRANTY: <br />A. For period of one year warrant the work specified herein against becoming unserviceable <br />or causing objectionable appearance resulting from either defective or nonconforming <br />material or workmanship. Defects shall include, but not be limited to noise, vibration, <br />rust or leaks. <br /> <br />1.4- SUBMITTALS <br />A. PRODUCT DATA: The General Contractor, within 10 days after receiving the Owners <br />Notice to Proceed shall submit to the Owner 5 sets of schedules, charts, literature, <br />rnanufacturers recommended installation procedure and illustrations to indicate the <br />performance, fabrication procedures, product variations and accessories on the submitted <br />items. <br /> <br />1.5 GENERAL PROVISIONS FOR PLUMBING WORK. <br />A. The drawings are to be considered diagrammatic and indicate the general arrangement of <br />the work and systems, Refer to building drawings to verify exact space locations and <br />space conditions. <br />B. Without additional cost to the owner, provide such other labor and materials as are <br />required to complete the work of this Section in accordance with the requirements of <br />governmental agencies having jurisdiction, regardless of whether such materials and <br />associated labor are called for elsewhere in these Contract Documents, <br />C. Layout work and set sleeves so there shall be minimum of cutting, drilling and patching, <br />D. This contractor shall do all excavation and backfill required for the installation of his <br />work. <br /> <br />~- <br /> <br />BUILDING CONSTRUCTION NOTES <br /> <br />1, This single family dwelling is to sac type construction requirements, Construction <br />shall comply with local County and state agencies, <br /> <br />2. All openings around walls, partitions, pipes, ducts, conduits etc" shall be sealed fully <br />and sound proofed with sealants of type for application. <br /> <br />3. Painting.. All surfaces shall be properly prepared and cured to manufacturer's <br />instruction prior to painting, Paint shall be "first line" produced by PORTER, SHERWIN II <br />WILLIAMS, or equal with colors selected by the owner. All painted surfaces <br />shall be painted with materials appropriate for the application in a workmanship mannerl <br />to the paint manufacturer's instruction, I <br /> <br />I <br />I <br /> <br /> <br />5, Regular GYPSUM wall board and ceiling sheets, 1/2" thick to ASTM C36 requirements _Ii <br />with all construction work to GA 600 and GA 216 on all interior ceiling surfaces. <br /> <br />6. All Room, Door and Plumbing Finish schedules are to be verified with Owner. <br /> <br />4. Caulk all exposed joints. Clean, prime, caulk and seal all joints between door and <br />window frames with DOW CORNING silicon of type for application. Use foam back-up <br />rods as required at wide joints. Use accoustical foam sealants by DAP or TREMCO at <br />sound proofing applications at openings or cracks, <br /> <br />,--,---- --,,--,_.._-,-----------~-----~ - ------,<<..,,~ --' -'-----, <br /> <br />I <br />I <br />i <br /> <br />ELECTRICAL <br /> <br />NOTES <br /> <br />1. All work to be done In accordance with all applicable codes and <br />ordinances, <br /> <br />2. Notify Owner of any discrepancies between these drawings and the <br />actual field conditions, Obtain clarifications from the Owners <br />prior to commencing work. <br /> <br />3, Contractor will visit site prior to bidding, no allowances for any <br />extra expenses will be granted as a result of not visiting site. <br /> <br />4-. All wire to be Copper, minimum size 12 AWG. · <br /> <br />5. All Ught Fixtures to be coordinated between Owner and Contractor. <br /> <br />6. Any installation conflict with other trades shall be brought to the <br />attention of the Owner for clarification before proceeding. <br /> <br />7, Verify locations of outlets and switches. <br /> <br />8. This contractor shall warrant all labor and materials for one year <br />from date of final written acceptance. <br /> <br />---,----,--------------- --- --'----1 <br /> <br /> <br />SYMBOLS LIST I <br />I <br /> <br />[ZJ <br />~ <br /> <br />-- RETURN DIFFUSER <br /> <br />- SUPPLY DIFFUSER <br /> <br />DUCT BOARD <br /> <br />- FLEX DUCT R6 ROUND <br /> <br />[IJ <br />~ <br /> <br />- SUPPLY RISER <br /> <br />- RETURN RISER <br /> <br />CD - THERMOSTAT <br /> <br />LOAD SUMMARY <br /> <br />DESCRIPTION kVA <br /> <br />GENERAL UGHT1NG <br />1865 Sq. Ft. @ 3 Watts per <br />SMALL APPLIANCE LOAD <br />2-20A ckts @ 1,5 ea, == <br />LAUNDRY <br />RANGE <br />DRYER <br />WATER HEATER <br /> <br />Sq. Ft. = 5.6 <br /> <br />-- 3/4" 10 <br />r--- 1/2" 10 <br /> <br />3,0 <br />1.5 <br />8.0 <br />5.0 <br />4-.5 <br />27.6 <br /> <br />HB <br /> <br />I~-------[ --- 1==- J1-...-- <br />I I - ,---- --,-- <br />I I W/H <br />I ' <br />I <br /> <br />TOTAL <br /> <br /> <br />First 10 kW @ 100% == <br />Remainder at 40% (15,2 kW x .4) == <br />HVAC <br />& 5000 JM Heat Strip = <br />1-H/P 0 5.0Kw = <br /> <br />TOTAL CALCUtA TED LOAD <br /> <br />10.0 <br />7.0 <br /> <br />B <br />, <br />\ <br />j <br /> <br />GARAGE <br /> <br />ill <br /> <br />5.0 <br />5.0 <br />27.0 <br /> <br />CWM <br /> <br />STUDY <br /> <br />I <br />i <br />I <br />II <br />I ' <br /> <br />I ~ 1-L <br />i L --..l---It. <br />~~----~---_---------..J <br />i <br /> <br />I <br /> <br /> <br /> <br />~r J:i rl <br />! ----1 I <br />i! ~___j t---=:: I <br />C~-, <br />I "--1 ' <br />. I I <br />~---1 ' <br /> <br />ill <br />I <br />I _~ _________ _~ __ - - I <br />L~-----n-----'t-----LL J <br /> <br />Calculated load for service size is 27000 kW <br />divided by 230V == 1 1 7.4 Am ps. <br /> <br />125A SERVICE. <br /> <br />Contractor to provide <br />concrete P<ld for HIP <br />per manufacturers .sp~5. <br />and min. ;j above 9rade. <br /> <br />C\~ <br />t:.:,O .I <br />~ <br /> <br /> <br />125A MLO <br />120/240V <br />1" 3 WIRE" SN <br /> <br />r, ---1-' <br />:. I <br />L~ <br /> <br />(2)2,4N,8G,l 1/ 4"C <br /> <br />METER <br /> <br />HB <br /> <br />c. <br /> <br />- (2)2,4~~,2"C <br /> <br />______________1___ <br /> <br /> <br /> <br />TO UTI L1TY <br />-- TRANSFORMER <br /> <br />NO.8 CU <br />GROUND IN ACCORDANCE <br />WITH NEC 250 <br />@ <br />~" <br />t,;o' <br />~ <br /> <br />ELECTRICAL RISER <br /> <br />NTS <br /> <br />I' <br /> <br />From 1st ir f ~----;~BJI <br /> <br />Floor J 1_-"--c~."-:c,~-c._..J <br /> <br />r <br />II <br />WC <br /> <br />HVAC SPECIFICATIONS AND NOTES <br /> <br />-l <br /> <br />~ <br /> <br /> <br />__~:=J <br />vs <br />I 5~X~FM &- - <br /> <br />~~L_ J1 <br /> <br />1. <br /> <br />INSTALL ALL SYSTEMS NEATLY IN A COMPLETELY OPERABLE CONDITION. COMPLY WITH CURRENT LOCAL CODES, THE <br />FLORIDA ENERGY CODE AND THE SOUTHERN STANDARD BUILDING AND FIRE CODES. USE NO PRODUCTS CONTAINING <br />ASBESTOS IN THIS PROJECT. <br /> <br />PAY FOR AND POST THE PROPER PERMITS FOR THE WORK BEING DONE. <br /> <br />GUARANTEE ALL WORK, EQUIPMENT AND MATERIALS TO ONE YEAR AFTER THE PROJECT SUBSTANTIAL COMPLETION DATE. <br />GUARANTEE ALL COMPRESSORS A TOTAL OF 5 YEARS FROM THE SAME PROJECT SUBSTANTIAL COMPLETION DATE. <br /> <br />PROVIDE AND INSTALL THE INDICATED EQUIPMENT WITH ACCESSORIES, EQUIPMENT CONTROLS. CONTROL WIRING, MOTOR <br />STARTERS AND RELAYS AS REQUIRED FOR PROPER OPERATION. PROVIDE ALL TOOLS AND EQUIPMENT, INCLUDING ANY <br />NEEDED SCAFFOLDING, TO COMPLETE THE JOB. <br /> <br />DUCTS: ALL DUCT SIZES ARE GIVEN BY CLEAR INSIDE DIMENSIONS. MATERIALS SHALL BE UL LISTED 181, CLASS 1 <br />COMPLY1NG WITH NFPA STANDARD 901A. NO PRODUCTS CONTAINING ASBESTOS SHALL BE USED ANYWHERE IN THE <br />PROJECT. SUPPLY DUCT TRANSITIONS SHALL BE NO MORE ABRUPT THAN 1 INCH IN 5 INCHES OF RUN. INSTALL TURN <br />VANES SPACED 3 INCHES ON CENTERS AT ALL 90 DEGREE AIR TURNS, <br /> <br />PLENUMS ABOVE THE GRILLES SHALL BE INSULATED USING 1 1/2 INCH THICK FIBER-GLASS WITH VAPOR BARRIER. <br />GRILLE PLENUMS SHALL BE A MINIMUM OF 5 INCHES DEEP TO ALLOW FREE AIRFLOW TO ALL PARTS OF THE GRILLE. <br />COORDINATE WITH THE ELECTRICAL CONTRACTOR TO PROVIDE PROPER EQUIPMENT POWER, FUSE AND DISCONNECT <br />PROTECTION AND CONTROL WIRE CONDUIT. <br /> <br />GIVE THE OWNER COMPLETE VERBAL AND WRmEN INSTRUCTIONS ON EQUIPMENT OPERATION AND NECESSARY GENERAL <br />MAINTENANCE. POST AN ADDITIONAL SET OF INFORMATION AND MAINTENANCE DATA IN A SAFE DRY LOCATION NEAR <br />EACH SYSTEMS RESPECTIVE AIR HANDLER, UNLESS OTHERWISE DIRECTED. <br /> <br />~ <br /> <br />2. <br />3. <br /> <br />4. <br /> <br />6, <br /> <br />1--- <br /> <br />7, <br /> <br /> <br />11 , <br /> <br />t-- <br /> <br />'2. <br /> <br />STAIRWELL <br />LL <br /> <br />.. <br /> <br />I <br /> <br />r <br />I <br />I <br />rJ <br /> <br />6"rtJ . <br /> <br />125 CFM <br />6X10 I'l/J <br />1:8}- - <br />C--=.:::J <br />I <br />I <br />1-- <br /> <br />50 CFM <br />6X6 <br /> <br />. WC <br />. BATHROOM <br />LAV <br />~ -, <br /> <br />ShoNerJ II <br />~ -:::!J I <br />1 I <br />U1 <br />& 5Kw <br />Heat Strip <br />-~ <br /> <br />5"rtJ <br /> <br />oX1o" <br /> <br /> <br />oX1! <br /> <br />A/H <br />fL <br /> <br /> <br />Thru wall <br />return air. <br /> <br />LIVING <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />,-1 <br />I <br />I <br />I <br />I 8"" <br />8x12 <br />225 CFM ~ <br /> <br />NOTE: Run Air Supply <br />Ducts under 1 st Floor. <br /> <br />'E <br /> <br />KS <br /> <br />KITCHEN <br /> <br />125 CFM <br />6X10 <br /> <br />PORCH <br />S'X25' - 4- <br /> <br />rl/J--0 <br /> <br />DINING <br /> <br />c==~ <br /> <br /> <br /> <br />1 ST FLOOR <br />PLUMBING <br /> <br />-T-~ <br /> <br />MASTER BEDROOM <br /> <br />5"rtJ <br /> <br /> <br />'iX15" Supply <br />from 1 st Floor <br /> <br />U-] <br /> <br />.-lL <br /> <br />I 8"" <br />I 8x12 <br />~ 225 CFM <br /> <br /> <br />BEDROOM <br /> <br />~L _Jr <br /> <br /> <br />HEAT <br />PLAN <br /> <br />n <br /> <br />AND <br /> <br />SCALE: 1/4" = 1'-0 <br /> <br />DECK <br /> <br />-2ND FLOOR HEAT <br />PLUMBING PLAN <br /> <br />AND <br /> <br />SCALE: 1/4" = 1'-0 <br /> <br />J <br /> <br />To City Water Supply <br /> <br />HB <br /> <br />j <br /> <br /> <br />COr" '"'f''' "',. ~"'p::<';~':""l"', <br />r ' !" .".. ' " " <br />'" ','.. ',' 't'. .~~" <br />~ ." . . . -'~ .~.<,.y .~ ::'.-"--~~)~ <br />f . '. " ,':J <br />, ~.'~$ <br />.fG <br />~ 1" <br />.,.,;} <br />~. <br /><: <br /> <br />II) <br />(S <br />II) <br />t:i <br />w <br />:c <br />w <br /> <br />~ <br />~ <br />~ <br />~ <br />~ <br />I <br />~ <br />l <br />~ <br />I <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />o <br /> <br />v <br />o <br />.c <br />().c. <br />0.... . <br />~'j ..s <br />088 <br />~c~ <br />lfg~ <br />.~g~~ <br />~,Si <br />~.8 c <br />.c.o~ <br />-.... <br /> <br />U'~E <br />5"0 <br />c:-- <br />f~ <br />.~'-' 8 i ~ I <br />f a..~ <br />, '.c.o,= ~ <br />\.. <br />" <br />_'U <br /> <br /> <br /> <br /> <br /> <br />"- <br /> <br />~ <br /> <br />". <br /> <br /> <br />--, <br /> <br />. <br /> <br />, <br /> <br />w <br />o <br />~ <br />w <br />(Q) <br /> <br />= <br /> <br />00 <br />lUY <br />OC <br /> <br />=>I <br /> <br />~ <br />:5 <br />0) <br />~ <br />OC <br />o <br />F <br /> <br />r .~, <br />~~ <br />C) <br />z <br />52 ~ <br />~ if <br />r! ~ <br />~ ~ <br />~ i <br />,~ .~ <br />.~ ~ <br />Z ~ <br />a: <br />w <br />z <br />et: <br />8 <br /> <br />, <br />" <br /> <br />,.\. <br /> <br />I <br /> <br />,I I,., <br />I . <br />, f <br /> <br />.' <br /> <br />~ <br />Z <br />W <br />o <br />(f) <br />w <br />~ <br /> <br />~ <br />:.J <br />::> <br />V) <br />vi ri Z <br />. ~8 <br />~ ~ z<-' <br />o -z <br />vi ~ ;}g <br />~ ~ ~~ <br />N 0 ~~It- ~ <br />~.5 e; <br /> <br />I;~ J <br />>- ~tij J <br />0: :> <br />co .6~ oV, <br />~8 ) <br />o .~ <br /> <br /> <br /> <br /> <br />~.~ ; <br /> <br />f t, <br /> <br />It) <br />N <br />~ <br />.." <br /> <br />-:i <br />(3 <br />~ <br />W <br />~ <br />~ <br />o <br />(J <br /> <br />(/) <br />W . <br />z <br />2~ <br />oj <br />I <br /> <br />.... <br />Z <br />w <br />~ <br />Q. <br />o <br />(/)d <br /><( (J <br />~o <br />Uo'iJ <br /> <br />~.' <br /> <br />~. '\ <br /> <br />~J <br /> <br />\~: <br /> <br />'... <br /> <br />,... <br />Ol <br />a <br />~ <br />o <br /> <br />"'~ <br /> <br />.,.~ <br /> <br />~' <br /> <br />.. <br /> <br />;V <br /> <br />., <br />4.:,:" r <br /> <br />.P <br /> <br />,.' ~:, <br /> <br />'~ <br /> <br />, <br />.~. <br /> <br />8 <br />a:I <br />o <br />~ <br /> <br />" <br /> <br />~';; ,,> <br /> <br />. ..... <br /> <br />'-f' <br /> <br />'-{ <br /> <br />" ,..' <br />