<br />It
<br />
<br />) -
<br />
<br />
<br />Weepholes:
<br />
<br />MA TElUAL CHARACTERISTICS
<br />
<br />Lab. Number 4552
<br />April 1, 2005
<br />Report Number 13
<br />File Number 05-116
<br />Page 2 of 4
<br />D-6987
<br />
<br /> Descriptio" Location
<br />Four I" by 1/4" wcephole with plastic at frame sill 3 1/4", 4 ~", 1 OS l/," and 1063/4" from left
<br /> baffles
<br />Two 1 " by 118" weep slot at frame sill below vinyl track insert, 3" from each end
<br /> -...
<br />Four 3/8" by 118" weep slot at frame sill, 2 5/8" from each end
<br />
<br />MUDtiDS: None
<br />MoUions: None
<br />Reinforcement: One 32 W' long aluminum reinforcement. drawing No. 5114, inside vent top and bottom rail, (total
<br />of four) and one of the same except 57" long inside vent meeting rail and vent jamb rail, (total offour). One 55" long
<br />aluminum reinforcement, drawing No. 5123, inside fixed meeting rail,(total of two), fastened with a single row ofNo.
<br />8 by~" flat head self drilling screws, 9",13 3/4",21",281/4",36",43 1/4" and 50 W' from bottom. One W' by 1/16"
<br />by I ~" aluminum plate at each end of fixed meeting rail fastened with the same size and type of assembly screws.
<br />Sealants: None
<br />Pads: None
<br />Screen: Water resistance tests were coOducted with and without fiberglass mesh screens installed.
<br />Additional Description: Unit has one 107 liS" long vinyl track insert, part No. 65138, inside frame sill.
<br />Unit Installation: Test unit instBlJed in a 2 x 12 pll!SSUI'e treated wood test buck using a 2 x 4 pressure treated buck strip.
<br />Frame installed with a single row 1/8" diameter by 1 ~,. roofing nail through nail fin frame at frame bead. frame sill and
<br />frame jambs. Location of installation nails are as follows: frame head and frame sill from the left, I 7/16", 7 9/16", 13
<br />3/4" 19 13/16",25 15/16".321/16",37 15116",44 1/16", SO 1/4", S6 5/16",627/16",689/16.'.743/4",80 13/16". S6
<br />15/16",931116",99114" 1055116" and III 7/168; framejambs fromtbebottom, 17/16",711/16",137/8",201116",
<br />26 1/4",32 7/J6", 38 11116",44 7/8", 51 1/16",571/4" and 62".
<br />Product MarkiDgs: None
<br />
<br />OFFICIAL TEST RESULTS
<br />
<br />Paraerapb Number
<br />
<br />Title of Test
<br />
<br />Measured
<br />
<br />2.1.2
<br />
<br />Air Infiltration Test: (ASTM E283-96)
<br />at 6.24 psf 0.18 cfinlsq.ft. (3.29 crnhIrnz)
<br />
<br />Allowed
<br />
<br />Passed
<br />0.3 (5-49) maximum
<br />
<br />Note: The tested specimen meets or exceeds the performance levels specified in specification reference
<br />for air infiltration.
<br />
<br />2.1.3 Water Resistance Test: (ASTM E547-961E331)
<br />with and without screen, no leakage at 9.00 psf (430 Pa)
<br />
<br />2.1.4.2 Uniform Structural Load Test: (ASTM E330-96)
<br />Positive Load 90.0 psf (4309 Pal
<br />Deflection Permanent Set
<br />Reading at meeting rail 3.030. (77.05mm) 0.078" (1.98mm)
<br />Reading at frame sill 0.421" (1O.70mm) 0.013" (O.33mm)
<br />Reading at frame jamb 0.168" (4.27mm) 0.003" (0.08mm)
<br />
<br />2.1.4.2 Uniform Structural Load Test: (ASTM E330-96)
<br />Negative Load 97.5 psf(4668 Pal
<br />Reading at meeting rail 3.385" (8608mm) 0.089" (2.26mm)
<br />Reading at frame sill 0.469" (J 1.93mm) 0.OJ6" (0.41mm)
<br />Reading at frame jamb O. 183" (4.65mm) 0.005" (0. 13mm)
<br />
<br />Posscd
<br />6.00 (287) minimwn
<br />
<br />Passed
<br />60.0 (2873) minimum
<br />
<br />0.233 (5.92) maximum
<br />
<br />Pnsscd
<br />60.0 (2873) minimwn
<br />0.233 (5.92) maxim, J
<br />
<br />/YkJ,~.f.
<br />
<br />1-13 -OS"
<br />
|