Laserfiche WebLink
<br />OUVER nCHNOL.OGIES. 'He, <br />FLORIDA IHSTALLAnON INSTRUCTIONS FOR THE <br />~ 110'1 .V" SJ;RII~:a aLL ~~ ftOUNrll11ON 8VS'TI;U <br />MODEL '1101"'" (STEPS 1-15) <br />l.ONGITUDINAL ONI.Y: FOLl.OW STSPS 1~ <br />I'Oft ADDING !.AmRAl. AIfM : I'oIJow StePS 10.15 <br />FOR CONCRrrli ,l.PPUCATlON.: I'oJ1ow $te1M 1...19 <br /> <br />Jl:t;!C I <br />r\~,,'i~(m ('/07 <br /> <br />EtICllINII!M; S1'Ml~ <br /> <br />SNOINIl!RS llr..~", <br /> <br />1. SP5CIAl. CIRCUMSTANCeS: 11 ttle following conditions occur. STIJP! Cont,cf Oliver ~ch"OJO(JifJ8 at 1-8DO-284~7437 : <br />a) PIer height exoeeds 48" b) I..ength of home .x:::e.dlll re' c} Roof eJIves exCIted 1 e" d) Sidewall height e:l(ceeD 9S" <br />q) Location is wlthln 1500 feet of ooast <br /> <br />INST~LLATION OF GROUND PAN <br /> <br />2. Remove weeds end debris in an approximate two foot square to el(pOse firm soil for ~ach ground pan (0) . <br />3. Place ground pan (C) directly below chassis l-beam . Preas or drive J)l!In firmly into soil until flush with or below8oil. <br />SPECIAL NOTE: Th&llongitudinml .V" brace system salVes as a pier under the home end $hOuld be loaded 8lt eny <br />other !:I!er. Ills I'$commendsd thfit efter leveling pisr$. end ofle.third inch (113") before home is lowered compietely on <br />to piers, complete steps 4. through 9 beiow then remove jacks. <br /> <br />IN~TALLATtON OF l.ONGn:UU'N~k teX'. ~RACE SYSteM <br />NOTE: WHeN INSTALUNG THE l.ONGITUDINAL aY8TBM t:JJJJJ.'i. A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION I. RIOUfREO. SOIL. TEST <br />Plltose SHOULD BE U'8ED TO DETERMINE CORRECT TYPE OF ANCItOH PeR son.. CI.A88IJ1ICATlON. IF PROBE TEST READINGS ~ BETWEEN <br />115" 176 A S FOOT ANCHOR MU.... 8E UlSID, IF !'ROI. TlST UADtNGS AIU; armvEEN Z'78" 310 A4 FOOT ANCtJO" NAY ee: U$~D, uee <br />G~UND ANCHORS wrrH lJlAGOMAL. TIES ...ND sr....IUZ&lt PLATSS EYIRY 5'." . VIlmCAL nn ARE AUIO REQUIRED ON HOMIS SUPPLIED <br />WITH VSUICAL TIE CONNECTION POINTS (PER ffLORIDA RIG.) . <br /> <br />4, Select the C07TQct square tube brace (e) length for set. up (pier) height at 9U!'port location. (The 18" tube Ie always <br />used as the bottom part of the longitudinall!lrm), Note: either tube eM be used by Itself, out 8Mi etined to length 391009 as l!t <br />40 to 45 degree angle is maintained. <br /> <br />PIER HEIGHT <br />(App;ox. 45 degrees Max.) <br /> <br />1,25' AOJUSTASL.S <br />Tl,lbs Length <br /> <br />1.S0" ADJUSTABLE <br />Tube Length <br /> <br />7 314" to 25" 22" 18" <br />243j4" to 321/4# 32" is" <br />~n to 41~ 44"' 18" <br />40" to 48" 54" 18' <br /> <br />5. Install (2) of the 1.50. SQuare tubes (E {1S" tube}) intothe 'U" braol<et (J),lnserl oarrlage bolt and leave nut loose for final <br />adjustment. <br />6. Place I.beam con~etor (F) loosely on the oottom flange of the I-beam. <br />7 Slide the selected 1,25" tut)e (E) Into 9 1.60' tubo (E) and attach to i.beam connectors If:) and faslen loosely wit;, bolt and "ut. <br />s.. Repeat steps 6 thl'QlJgh 7 to create the 'V. patiqrn cf the sqUtlfe tubes loosely In place. The 8ngle Is no! to exceed 45 <br />degr.liI and nat below 40 degrees. <br />;9. After all bolts are tightened, secure 1.25" and 1.50" tubas !,IsIng four(4) 1/4.~14 r. 3;4" selr-tepping screws in pre-drilled holE:l$. <br /> <br />INSTAI.I.ATlON OF I.ATERAL TEl-ESCOPING TRANSVERSE ARM SVSTEM <br />THli MOOEI.11 01 "V" (LONOrrUDINA.l .. lAT!rtAL. PROTeCTION) !LlMINATES THE NEED FOR MOST STABI1JZER PL\11!!S & FRAME TIES. <br />NQ'TIi: THE usa OF THIS SY"'''' RIQUlMS V!R11CAL TIESlSPAQ:D AT $'4"" <br />f'OUR FOOT (4') GItOUHD ANeH~ MAY III tJSID EXCEPT WHIRl THE HOMIl MANUflACTUREft SPECI'I!!! DIFI'!RBNT. <br /> <br />10. Install remaining vertioaliie-down straps ar.d 4'gtOund al'ichOr~ per home manufacturer', Instrl.letions. NOTE: Centerlina <br />I/II'ichcl'S to be sized acoording to soil torque condition. Any manufacturer's spec:iftcations for sidewall anchor loads in excess of <br />4,000 Ibs, require a 5' anchor per Florida Code. <br />11, NOTE: Each system is required to have a frame tie and stabilizer attecned at each iateral arm slabillzll'lg looation. This frame tie 8- <br />_biltz-er plate needs \'0 be located WIthin is'' from of eer.ter ground ~n, <br />12. Select the eorreot square tube braes (H) length for S&tMup lateral transverse at support location. The lengths come in efther60' <br />or 72" lengths. (With the '1.50" tube as the bottom tube, snd the 1.2~ lUbe sa the inserted tUbe,) <br />13. InslSti tne 1.M tiansverse brace (H) 1,0 the ground pan connfilctor CO) with bolt ;sod nut. <br />14. Slide 1.25" transverse brace Into the 1.50" brace and attactl to adjacent l.beam connet:lor ( I ) with bolt and nut, <br />15. Seoure 1.50~ Jt81"1~vers& 8,.,110 1.25" transverse arm usinQ four 1411/4" - 14 x 3/4" seif-taouing 80l'VW$ in I)re-drllled holes. <br /> <br /> <br />+ <br /> <br />OLIVER TECHNOLOGIES, INC. <br />1-800..284-7437 <br /> <br />19lepoorlG: 931-7954555 <br />Fax: 931.796-J81" <br />1oWIW,o!klerteohnologle$."''''' <br />