My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-7900
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:45:13 PM
Creation date
8/22/2008 7:24:32 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7900
Building Department - Name
RYMAN CONCTRUCTION
Address
6834 MEDICAL VIEW LN LT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ZEPHYRHILLS FIRE DEPARTMENT <br />6907 Dairy Road, Zephyrhills, FL 33542 <br />Bus (813)780-0041 Fax (813)780-0044 <br /> <br />Fire Chief Keith Williams <br /> <br />FIRE SERVICE USER FEES <br /> <br />Occupancy N{>>.: <br />Plan No.: Ofj - 0 7*: <br />Business Name: IJ ~ ~ <br />Business Address: b .34 ibr.a.l J(~() ~ <br />Business Phone No.: <br />Business Fax No.: <br />Contact: <br /> <br />PLAN REVIEW FEES <br />D Site Plan N/C <br />D Multi-Family/Commercial .06 sf <br />(Minimum Charge $25.00 <br />o Plan Revisions DBL <br /> <br />INSPECTION FEES <br />N/C <br />N/C <br />$100 <br />$250 <br />$500 <br /> <br />Annual <br />1 st Re-inspection <br />2nd Re-inspection <br />3rd Re-inspection <br />4th Re-Inspection <br />SPRINKLER SYSTEMS (Business closed until <br />D 0 - 25 Heads $50 violations corrected) <br />D 26 plus Heads $100 SPRINKLER SYSTEMS <br />STANDPIPE SYSTEM ~ Hydro Undergrounds $45 <br />o Per Riser $50 Hydrostatic Test $65 persystem <br />FIRE PUMP Acceptance Test $45 persystem <br />o Per Pump $100 Hydrant Flow $75 <br />FIRE ALARM SYSTEM <br />~ - 25 Devices ~ FIRE ALARM SYSTEM <br />IT 26 plus Devices System Acceptance ~ <br />SUPPRESSION SYSTEMS Recall Acceptance $50 <br />~ Wet $50 OTHER <br />Dry $50 ~ Fire WalVSmoke Wall $15 per wall <br />C02 $50 LP Gas $25 per lank <br />other $50 Natural Gas $25 per system <br />KITCHEN EXHAUST <br />o HoodIDucts <br />OTHER <br />D LP Installation per tank <br />D Fuel Tank Installation <br />(Per Tank) <br />o Natural Gas Installation <br />(Per System) <br />o Spray Booth <br /> <br />$50 ~ Tent 1 0'x1 0' or gr.er <br />Fire Pump <br />Fire SuppresSion <br />System Acceptance <br />D Exhaust HoodIDuct <br />D Re-inspection <br />(other than annual) <br />$50 0 Inspection scheduled DBL <br />and cancel/ed less than <br />24 hours <br />B Construction Insp. N/C <br />~ Emergency Vehicle Ao $50 _ <br />PLANS TOTAL W INSPECTION TOTALc:5ZD <br /> <br />$50 <br />$50 <br />$50 <br />$50 <br /> <br />$15 <br />$45 <br />$30 <br /> <br />per lent <br /> <br />$30 <br />DBL <br /> <br />GRAND TOTAL <br /> <br />Comments: <br /> <br />Contractor: <br />Billing Address: <br /> <br /> <br />Billing Phone No.: <br />Billing Fax No.: <br />Contact: <br /> <br />PERMIT FEE FALSE ALARM FEE <br />Sprinkler $50 1 st Alann NlC <br />Standpipes $50 2nd Alann N/C <br />Fire Pump $50 3rd Alann N/C <br />Hoods $50 4th Alann $100 <br />Fire Alann 5th Alann $150 <br />LP Gas 6th Alann $200 <br />Natural Gas $50 NON COMPUANCE $150 <br />F!,JE!I Tanks- perlank $50 <br />Sparklers $100 <br />Fire Works $500 <br />Camp Fire $25 <br />Controlled Bum $100 <br />Hood/Duct $50 <br />Place of Assembly $50 Annual <br />Fire Protection $25 <br />Flammable Application $50 Annual <br />Waste Tire Storage $50 Annual <br />Generator < KW $100 <br />Generator >30 KW 150 <br />Bio-Hazard Waste $100 Annual <br />Fumigation Tenting $50 <br />Torch Pot/Applied $50 <br />Haz. Materials $100 Annual <br /> <br /> <br />8 <br /> <br />FALSE ALARM <br />PERMIT TOTALWJ- TOTAL I <br /> <br />J <br /> <br />~-~ <br />/ <br /> <br />Date: <br /> <br />,q2r~r;v /?ye(/ ~A <br /> <br />I I <br /> <br />Insij~ctor: <br />
The URL can be used to link to this page
Your browser does not support the video tag.