My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-7612
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:46:41 PM
Creation date
9/19/2008 10:53:45 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7612
Building Department - Name
ADVENTIST HEALTH SYSTEM
Address
38233 DAUGHTRY RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Zephyrhills Fire Rescue <br />6907 Dairy Road, Zephyrhills, FL 33542 <br /> <br />Fire Marshal <br />Kerry Barnett <br /> <br />Bus (813) 780-0041 <br />Fax (813) 780-0044 <br /> <br />March 12,2008 <br /> <br />I have reviewed and approved the revised plans for a containment building & the interior <br />remodel for a hyperbaric facility located at 38233 Daughtery Rd for Florida Hospital. I <br />have attached the comments below. If there are any questions please contact my office at <br />813-780-0041. <br /> <br />1. The project shall be compliant to all latest editions ofNFP A. <br />2. Separate plans are required to be submitted for sprinkler and fire alarm system <br />for review and permitting. These systems shall be compliant to the latest <br />edition of the codes. <br />3. Housekeeping program, scheduled maintenance on chambers and policy on <br />handling gases shall be provided to FM at time building is finaled. <br />4. Signage placed at chamber entrance stating NO OPEN FLAME OR <br />SMOKING <br />5. Fire dampers in duct work (SpecslUL list sheets) shall be provided to ensure <br />proper rating. <br /> <br />Inspections Required: <br /> <br />1. Screw inspection on each layer of fire rated drywall installed for both <br />containment building and interior remodel. <br />2. Final inspect on all firewalls to ensure all penetrations are properly sealed. <br />This will include the firewall between the two occupancies. <br />3. Pressure test on med gas lines. <br />4. Fire Damper inspection. <br />5. 3rd party to inspect hyperbaric chamber hook up to tank: and any other <br />inspections associated with the tank, chamber and lines. <br />6. Final on overall project. Copies of inspections completed by 3rd party shall be <br />given to FM at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.