My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-7612
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:46:41 PM
Creation date
9/19/2008 10:53:45 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7612
Building Department - Name
ADVENTIST HEALTH SYSTEM
Address
38233 DAUGHTRY RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Zephyr hills Fire Rescue <br />6907 Dairy Road, Zephyrhills, FL 33542 <br /> <br />Fire Marshal <br />Kerry Barnett <br /> <br />Bus (813) 780-0041 <br />Fax (813) 780-0044 <br /> <br />February 21, 2008 <br /> <br />I have reviewed and disapproved the plans for a containment building for a bulk oxygen <br />system for a hyperbaric facility located at 38233 Daughtery Rd for Florida Hospital. I <br />have attached the comments below. Ifthere are any questions please contact my office at <br />813-780-0041. <br /> <br />1. No specs on bulk oxygen tank and system located in the out building (tank <br />size & cubic ft need to be known). <br />2. Piping layout on how it enters the facility states that it is compliant to NFP A <br />99 and NFPA 50, 1999 edition. According to NFPA Code books, NFPA 99 is <br />now in the 2005 edition and NFP A 50 no longer exists. Also Building official <br />states that drawing is not correct and lines are running through the attic. <br />Occupant shall show code requirements allowing piping to be brought through <br />the attic otherwise AHJ will not allow. <br />3. How the building is to be rated-with what UL design. Fire rated wall shall <br />comply with 8.6.2.1.1 through 8.6.2.1.5. ofNFPA 55. NOTE: 8.6.2.1.1 <br />setback (documentation submitted was the engineering on the out building <br />only. All penetrations shall be shown. <br />4. Site plan does not contain distances from building exposure. <br />5. Equipment used in bulk system shall be cleaned in accordance to CGA G-4.1, <br />Cleaning Equipment for Oxygen Service, before placing in service. <br />Documentation shall be provided. <br />6. Tank and building shall be placarded, NFPA 704 System, and with signage <br />that states Oxygen, No Smoking or Open Flame. <br />7. System shall be vented to atmosphere. <br />
The URL can be used to link to this page
Your browser does not support the video tag.