Laserfiche WebLink
<br />Matthew/ Aley Residence <br />Summary Report of Monitoring of <br />Subsurface Compaction and Chemical Grouting <br /> <br />BCI Project No. 03-15564.1 <br />June 2008 <br />Page 5 <br /> <br />3.0 MONITORING <br /> <br />Monitoring for any new settlement or distress should be conducted regularly. This <br />monitoring can be easily performed by the resident and should consist of regular exterior inspections. <br />A one year monitoring period (with minimum monthly observations) is recommended. If any <br />additional ground subsidence or damage to the house is noted during this monitoring period, BCI <br />should be contacted in order to evaluate the situation. <br /> <br />Since some movement of the structure may continue for a period of time following grouting <br />due to the re-distribution of stresses, consideration should be given to delaying final cosmetic repairs. <br />A minimum waiting period after grouting of four months is recommended prior to initiating <br />cosmetic repairs. <br />