08-7752
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-7752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:46:01 PM
Creation date
9/19/2008 11:03:04 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-7752
Building Department - Name
ABHILASH,MATTHEW
Address
5012 5TH STREET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Subsidence Investigation <br />Mathew/Aley Rental Property <br />Claim No. 223968 <br /> <br />BCI Project No. 03-15564 <br />November 2007 <br />Page 11 <br /> <br />5.2 Chemical Grouting <br /> <br />In order to fully stabilize the shallow loose soils underlying the house foundation, a program of shallow <br />chemical injection grouting using a specially-formulated polyurethane expanding polymer is also recommended <br />around the perimeter of the structure. This material cures to form a durable, high strength solid grout. Injection <br />of the grout material requires drilling %-inch diameter holes around the outside perimeter of the house on 4 to 6 <br />foot centers, installing grout pipes, and injecting the grout under controlled pressure to fill voids, densify loose <br />materials, and re-Ievel slabs and foundation elements. The chemical grouting should be done after the compaction <br />grouting is completed. BCI can provide detailed design recommendations and a list of qualified foundation repair <br />contractors to do the chemical grouting, if requested. <br /> <br />In order to allow time for re-distribution and equilibration of stresses induced by the grouting programs, <br />we recommend that fmal cosmetic repairs of cracking and other damage to the house not be undertaken for a <br />period of four months following grouting. <br /> <br />5.3 Project Costs <br /> <br />A cost estimate for the proposed grouting program is presented below in Table 3. As shown, project <br />costs are estimated at $65,956. It should be noted that these costs are estimated based on our experience with <br />similar projects in the central Florida area. Costs for any needed structural or cosmetic repairs to the house are <br />not included in this estimate. Actual, final project costs for the grouting may be lower (or possibly higher) after <br />the project is subject to final design, competitive contractor bidding, and any modifications during <br />implementation. <br /> <br />Table 3 <br />Estimated Project Costs <br />Subsurface Compaction and Chemical Grouting <br />Mathew/Aley Rental Property <br /> <br />Subsurface Comnaction-Chemical Groutin!! Ouantitv Units Unit Cost <br />a. Contractor Mobilization I each $2,000 <br />b. Installation of grout casings 960 feet $16 <br />c. Compaction grout material and flowable fill 200 cubic yds. $160 <br />(estimated) <br />d. Chemical Grouting (includes 500 lbs. of material) 1 day $7,000 <br />e. Additional chemical grout material 400 lbs $13 <br /> Subtotal = <br /> <br />Engineering Supervision <br />Inspection & oversight - estimated 12 to 14 days to <br />complete grouting <br /> <br />estimated <br /> <br />$65,956 <br /> <br />TOTAL ESTIMATED PROJECT COSTS = <br /> <br />Cost <br />$2,000 <br />$15,360 <br /> <br />$32,000 <br /> <br />$7,000 <br /> <br />$5,200 <br /> <br />$61,560 <br />Cost <br /> <br />$4,396 <br /> <br />In order to ensure compliance with the fmding of this study and project specifications, we recommend <br />that BCI be retained to evaluate the contractor bids and provide project monitoring and oversight services during <br />the grouting operations. <br />