My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-8021
Zephyrhills
>
Building Department
>
Permits
>
2008
>
08-8021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:44:45 PM
Creation date
9/19/2008 11:35:22 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
08-8021
Building Department - Name
PITTMAN,ELIZABETH
Address
4615 WISTERIA DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t;ompletiol/ Report Of Grout Injection Remediation <br />The Pittman Residence - Zephyrhills, Florida <br />Claim No. 2800031710 <br />SDlI Project No. 3017839A <br /> <br />July 17, 2008 <br /> <br />. The contractor ordered 19 truckloads containing a total of approximately 180 cubic <br />yards of grout mix to the site. Of this quantity, approximately 171.9 cubic yards were <br />injected into the subsurface. <br /> <br />. The grout slump tests conducted at the site indicated a range in slump of 5.0 to 5.5 <br />inches. <br /> <br />Based on the above information, it is our opinion that the deep injection-grouting program has <br />been completed in substantial compliance with SDU's engineering recommendations and local <br />grouting practices. This grouting procedure was implemented to stabilize the subsurface <br />conditions related to sinkhole activity in the immediate vicinity of the foundation of the <br />structure. This procedure may not preclude development of new sinkhole activity in the future, <br />however. Table 1 in the Appendix summarizes the grout injection, including estimated grout <br />volume injected and initial depth of each point. Figure 2 illustrates the location and numbering of <br />the grout points. <br /> <br />It is SDU's understanding that cosmetic repairs will be done following the grouting operations. <br />Accordingly, any existing damage and/or collateral damage associated with the grouting <br />operations should be repaired at that time by a qualified restoration contractor. <br /> <br />CLOSING <br /> <br />SDU appreciates the opportunity to be of service to you on this project. If you should have any <br />questions concerning the contents of this report, or if we may be of further assistance, please <br />contact us. <br /> <br />Sincerely, <br /> <br /> <br />>J D. Clef <br />Thomas H. Fisher, P.E. <br />Principal Engineer <br />Florida Registration Number 58027 <br /> <br />APPENDIX: Table 1 - Grout Point Injection Summary <br />Figure 1 - Project Site Location Map <br />Figure 2 - Site Plan Showing As-Installed Location Of Grout Injection Points <br />Selected Site Assessment Photographs <br /> <br />DISTRIBUTION: <br /> <br />Addressee - 2 <br />Insured - 1 <br />File - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.